PREPARING ROW
|
STA
|
41.000
|
$2,000.000
|
$915.590
|
$1,600.000
|
$2,500.000
|
$1,500.000
|
|
|
PREPARING ROW (TREE) (6" TO 24" DIA)
|
EA
|
1.000
|
$605.000
|
$784.630
|
$3,000.000
|
$3,600.000
|
$1,500.000
|
|
|
REMOVING CONC (FOUNDATIONS)
|
CY
|
4.000
|
$550.000
|
$185.390
|
$320.000
|
$480.000
|
$500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
18.000
|
$55.000
|
$44.240
|
$46.000
|
$50.000
|
$100.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
5.000
|
$45.000
|
$18.740
|
$66.500
|
$148.500
|
$500.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
758.640
|
$340.000
|
$274.970
|
$275.000
|
$250.000
|
$1,000.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
361.900
|
$27.000
|
$25.440
|
$29.500
|
$50.000
|
$50.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
786.980
|
$140.000
|
$152.660
|
$195.000
|
$146.500
|
$170.000
|
|
|
BLADING
|
HR
|
75.000
|
$170.000
|
$124.560
|
$145.000
|
$290.000
|
$250.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
40.000
|
$320.000
|
$359.000
|
$330.000
|
$380.000
|
$310.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
20.000
|
$350.000
|
$300.000
|
$355.000
|
$315.000
|
$330.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
20.000
|
$350.000
|
$365.000
|
$365.000
|
$385.000
|
$340.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,560.000
|
$20.000
|
$24.490
|
$24.500
|
$41.000
|
$25.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
16,843.120
|
$3.100
|
$3.500
|
$3.450
|
$3.850
|
$3.250
|
|
|
D-GR HMA TY-B PG70-22
|
TON
|
21,740.750
|
$95.000
|
$104.680
|
$114.000
|
$121.600
|
$120.000
|
|
|
D-GR HMA TY-D SAC-A PG 76-28
|
TON
|
50,725.000
|
$105.000
|
$115.500
|
$114.000
|
$131.650
|
$130.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,089.000
|
$2.900
|
$2.340
|
$3.250
|
$4.250
|
$2.530
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,360.000
|
$1.800
|
$1.860
|
$2.500
|
$2.900
|
$2.530
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
211.640
|
$125.000
|
$102.460
|
$215.000
|
$155.000
|
$200.000
|
|
|
CMP (GAL STL 48 IN)
|
LF
|
58.000
|
$115.000
|
$179.800
|
$215.000
|
$235.000
|
$300.000
|
|
|
SET (TY II) (48 IN) (CMP) (4: 1) (C)
|
EA
|
14.000
|
$4,500.000
|
$5,128.800
|
$7,000.000
|
$3,415.000
|
$6,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$688,351.000
|
$692,853.990
|
$540,000.000
|
$954,000.000
|
$1,200,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$11,800.000
|
$14,620.150
|
$33,500.000
|
$29,950.000
|
$50,000.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
500.000
|
$30.000
|
$25.000
|
$27.000
|
$44.500
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
500.000
|
$5.500
|
$5.000
|
$10.500
|
$7.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,000.000
|
$4.000
|
$5.020
|
$5.350
|
$9.400
|
$5.700
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
157,687.000
|
$0.150
|
$0.100
|
$0.130
|
$0.130
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
78,598.000
|
$0.350
|
$0.100
|
$0.170
|
$0.300
|
$0.250
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
800.000
|
$30.000
|
$30.000
|
$32.000
|
$31.600
|
$30.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
800.000
|
$4.200
|
$4.000
|
$4.300
|
$4.200
|
$4.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,200.000
|
$3,100.000
|
$3,300.000
|
$3,265.000
|
$3,100.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$330.000
|
$400.000
|
$430.000
|
$420.000
|
$400.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
10.000
|
$220.000
|
$210.000
|
$225.000
|
$265.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 1
|
EA
|
2.000
|
$280.000
|
$250.000
|
$270.000
|
$315.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
2.000
|
$415.000
|
$385.000
|
$410.000
|
$474.000
|
$450.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
22.000
|
$580.000
|
$520.000
|
$555.000
|
$895.000
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
$1,300.000
|
$825.000
|
$885.000
|
$1,225.000
|
$1,165.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
39.000
|
$600.000
|
$415.000
|
$445.000
|
$795.000
|
$755.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
3.000
|
$520.000
|
$485.000
|
$520.000
|
$875.000
|
$830.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
12.000
|
$130.000
|
$55.000
|
$59.000
|
$142.000
|
$135.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
52.000
|
$95.000
|
$60.000
|
$64.000
|
$142.000
|
$135.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
65.000
|
$14.000
|
$25.000
|
$27.000
|
$16.000
|
$15.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
4,989.000
|
$1.100
|
$1.000
|
$1.050
|
$1.150
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
7,232.000
|
$1.100
|
$1.000
|
$1.050
|
$1.200
|
$1.000
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
1,837.000
|
$0.800
|
$0.800
|
$0.860
|
$0.450
|
$0.430
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,400.000
|
$1.000
|
$0.750
|
$0.800
|
$0.880
|
$0.840
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$7.500
|
$10.000
|
$10.500
|
$21.050
|
$20.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
20.000
|
$108.000
|
$200.000
|
$215.000
|
$263.400
|
$250.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
17,240.000
|
$0.350
|
$0.310
|
$0.330
|
$0.450
|
$0.430
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
156,230.000
|
$0.350
|
$0.300
|
$0.320
|
$0.450
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
6,275.000
|
$0.350
|
$0.350
|
$0.370
|
$0.450
|
$0.430
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
165,705.000
|
$0.350
|
$0.300
|
$0.320
|
$0.450
|
$0.430
|
|
REFL PAV MRKR TY I-C
|
EA
|
266.000
|
$4.200
|
$3.000
|
$3.200
|
$4.200
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,300.000
|
$4.200
|
$3.000
|
$3.200
|
$4.200
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$8.000
|
$20.000
|
$21.500
|
$3.650
|
$3.400
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$55.000
|
$30.000
|
$32.000
|
$60.750
|
$57.640
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$3,500.000
|
$4,400.000
|
$4,300.000
|
$12,115.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
91.000
|
$300.000
|
$250.000
|
$300.000
|
$785.000
|
$2,600.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
104.000
|
$50.000
|
$95.000
|
$96.500
|
$78.500
|
$95.000
|
|
Totals: |
$9,228,112.872
|
$9,862,939.508
|
$10,112,947.954
|
$11,703,900.292
|
$12,648,589.860
|