|
|
PREPARING ROW
|
STA
|
3.150
|
$5,000.000
|
$8,950.740
|
$4,300.000
|
$56,000.000
|
$3,000.000
|
|
|
PREPARING ROW (TREE) (36" TO 48" DIA)
|
EA
|
2.000
|
$3,740.000
|
$1,151.600
|
$5,300.000
|
$3,000.000
|
$2,000.000
|
|
|
EXCAVATION (SPECIAL)
|
CY
|
174.000
|
$35.000
|
$42.070
|
$84.000
|
$51.500
|
$40.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
411.610
|
$550.000
|
$132.080
|
$330.000
|
$500.000
|
$900.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
1,007.000
|
$25.000
|
$36.000
|
$58.000
|
$39.500
|
$40.000
|
|
|
BACKFILL (TY A OR B)
|
STA
|
421.910
|
$145.000
|
$117.680
|
$220.000
|
$135.000
|
$200.000
|
|
|
BLADING
|
HR
|
20.000
|
$135.000
|
$125.120
|
$430.000
|
$385.000
|
$200.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
19.380
|
$525.310
|
$430.000
|
$460.000
|
$475.000
|
$650.000
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
AC
|
9.690
|
$413.920
|
$370.000
|
$395.000
|
$410.000
|
$600.000
|
|
|
DRILL SEEDING (TEMP) (COOL)
|
AC
|
9.690
|
$325.710
|
$445.000
|
$475.000
|
$500.000
|
$600.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,577.900
|
$16.390
|
$25.170
|
$30.500
|
$25.000
|
$25.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1H)
|
GAL
|
18,752.000
|
$3.240
|
$4.370
|
$4.650
|
$4.650
|
$5.500
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
1,244.000
|
$1.900
|
$2.740
|
$12.500
|
$9.650
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,421.000
|
$20.000
|
$85.000
|
$91.000
|
$94.350
|
$85.000
|
|
|
CL C CONC (HEADWALL)
|
CY
|
2.900
|
$3,200.000
|
$2,500.000
|
$2,700.000
|
$2,775.000
|
$2,500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
88.000
|
$800.000
|
$750.000
|
$800.000
|
$775.000
|
$800.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
5.000
|
$600.000
|
$600.000
|
$640.000
|
$665.000
|
$800.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
3.000
|
$600.000
|
$715.000
|
$765.000
|
$795.000
|
$890.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
4.000
|
$750.000
|
$800.000
|
$855.000
|
$890.000
|
$1,050.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
4.000
|
$850.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,500.000
|
|
|
CONC BOX CULV (6 FT X 5 FT)(EXTEND)
|
LF
|
18.000
|
$1,000.000
|
$1,150.000
|
$1,200.000
|
$1,300.000
|
$1,650.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
8.000
|
$1,100.000
|
$1,125.000
|
$1,200.000
|
$1,250.000
|
$2,625.000
|
|
|
CONC BOX CULV (7 FT X 3 FT)(EXTEND)
|
LF
|
28.000
|
$900.000
|
$1,000.000
|
$1,100.000
|
$1,100.000
|
$1,800.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
3.000
|
$200.000
|
$300.000
|
$320.000
|
$333.000
|
$550.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
10.000
|
$250.000
|
$450.000
|
$480.000
|
$500.000
|
$450.000
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
2.000
|
$65,000.000
|
$165,000.000
|
$180,000.000
|
$183,000.000
|
$167,000.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$27,000.000
|
$50,000.000
|
$53,500.000
|
$55,500.000
|
$50,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
2.000
|
$31,500.000
|
$66,000.000
|
$70,500.000
|
$73,250.000
|
$66,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$6,000.000
|
$12,500.000
|
$13,500.000
|
$13,900.000
|
$15,000.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$8,750.000
|
$15,500.000
|
$16,500.000
|
$17,200.000
|
$17,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$9,500.000
|
$19,500.000
|
$21,000.000
|
$21,640.000
|
$22,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$10,450.000
|
$16,500.000
|
$17,500.000
|
$18,300.000
|
$16,500.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
2.000
|
$5,000.000
|
$15,650.000
|
$16,500.000
|
$17,400.000
|
$15,650.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
2.000
|
$10,000.000
|
$24,500.000
|
$26,000.000
|
$27,000.000
|
$26,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,450.000
|
$2,000.000
|
$2,100.000
|
$2,200.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
6.000
|
$3,500.000
|
$4,000.000
|
$4,300.000
|
$4,450.000
|
$4,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
13.000
|
$1,500.000
|
$3,500.000
|
$4,300.000
|
$4,500.000
|
$4,500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$480,000.000
|
$541,782.400
|
$675,000.000
|
$692,000.000
|
$700,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$3,484.430
|
$13,500.000
|
$35,000.000
|
$25,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
1,040.000
|
$6.620
|
$5.510
|
$5.300
|
$8.300
|
$7.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
82,612.000
|
$0.160
|
$0.110
|
$0.090
|
$0.200
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
41,306.000
|
$0.180
|
$0.180
|
$0.130
|
$0.250
|
$0.300
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
850.000
|
$30.000
|
$55.000
|
$34.000
|
$42.500
|
$35.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
176.000
|
$57.910
|
$125.000
|
$98.500
|
$83.250
|
$95.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$3,550.000
|
$6,475.000
|
$3,500.000
|
$3,900.000
|
$3,250.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
64.000
|
$955.000
|
$720.000
|
$770.000
|
$900.000
|
$750.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
51.000
|
$29.920
|
$25.000
|
$26.500
|
$15.000
|
$10.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND
|
EA
|
35.000
|
$111.160
|
$65.000
|
$69.500
|
$135.000
|
$65.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND
|
EA
|
16.000
|
$77.080
|
$80.000
|
$85.500
|
$135.000
|
$80.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,219.000
|
$0.910
|
$1.000
|
$1.050
|
$1.300
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
84,382.000
|
$0.520
|
$0.390
|
$0.420
|
$0.600
|
$0.540
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
26,875.000
|
$0.480
|
$0.390
|
$0.420
|
$0.620
|
$0.560
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
57,525.000
|
$0.500
|
$0.390
|
$0.420
|
$0.610
|
$0.550
|
|
|
D-GR HMA TY-B PG70-28
|
TON
|
8,049.000
|
$135.000
|
$147.050
|
$180.000
|
$142.250
|
$158.000
|
|
|
D-GR HMA TY-D SAC-A PG70-28
|
TON
|
15,152.000
|
$125.000
|
$152.980
|
$150.400
|
$146.000
|
$159.000
|
|
|
TACK COAT
|
GAL
|
13,339.000
|
$3.100
|
$2.930
|
$3.350
|
$4.100
|
$4.500
|
|
|
TMA (STATIONARY)
|
DAY
|
180.000
|
$195.400
|
$128.000
|
$265.000
|
$670.000
|
$200.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
14.000
|
$78.320
|
$83.000
|
$105.000
|
$93.000
|
$95.000
|
|
Totals: |
$4,950,701.404
|
$6,062,196.882
|
$6,770,992.050
|
$6,982,669.200
|
$7,091,723.830
|