MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$650.000
|
$1.000
|
$1.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$700.000
|
$1,500.000
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
2,000.000
|
$19.500
|
$30.050
|
$29.850
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
15.000
|
$1,530.000
|
$1,798.000
|
$1,100.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
10.000
|
$600.000
|
$800.000
|
$500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
10.000
|
$1,060.000
|
$1,237.000
|
$2,960.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$20.000
|
$28.000
|
$5.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
100.000
|
$300.000
|
$1.000
|
$1.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,000.000
|
$3.500
|
$3.000
|
$7.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
50.000
|
$300.000
|
$1,140.000
|
$1.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
100.000
|
$2,950.000
|
$1,849.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
50.000
|
$245.000
|
$2,500.000
|
$1.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
1.000
|
$1,900.000
|
$10,000.000
|
$25,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
200.000
|
$13.500
|
$30.000
|
$30.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
100.000
|
$14.500
|
$30.000
|
$25.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
7,000.000
|
$18.000
|
$18.500
|
$10.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
100.000
|
$22.500
|
$39.240
|
$30.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
100.000
|
$20.500
|
$52.080
|
$40.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
1,000.000
|
$50.000
|
$50.000
|
$30.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
20.000
|
$50.000
|
$136.000
|
$130.000
|
|
|
REALIGN POSTS
|
EA
|
400.000
|
$10.000
|
$20.000
|
$20.000
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
600.000
|
$10.000
|
$12.500
|
$75.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
200.000
|
$35.000
|
$45.600
|
$40.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
25.000
|
$60.000
|
$200.000
|
$300.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
15.000
|
$880.000
|
$860.000
|
$2,000.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
15.000
|
$150.000
|
$1.000
|
$1.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
50.000
|
$25.000
|
$50.000
|
$1.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
1,500.000
|
$130.000
|
$53.000
|
$107.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
150.000
|
$165.000
|
$400.000
|
$512.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
24.000
|
$175.000
|
$250.000
|
$150.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
10.000
|
$175.000
|
$250.000
|
$250.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
24.000
|
$235.000
|
$150.000
|
$300.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
10.000
|
$80.000
|
$150.000
|
$200.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
20.000
|
$1,750.000
|
$250.000
|
$500.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
20.000
|
$1,100.000
|
$1,150.000
|
$500.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
1,000.000
|
$5.000
|
$5.000
|
$4.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
1,000.000
|
$2.000
|
$5.000
|
$4.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
24.000
|
$290.000
|
$250.000
|
$1,500.000
|
|
|
REMOVE AND REPLACE (WIDE TRACC)
|
EA
|
2.000
|
$34,420.000
|
$10,000.000
|
$3,500.000
|
|
|
REMOVE AND REPLACE (NARROW REACT 350)
|
EA
|
2.000
|
$17,980.000
|
$10,000.000
|
$3,500.000
|
|
|
REMOVE AND REPLACE (WIDE REACT 350)
|
EA
|
2.000
|
$15,800.000
|
$20,000.000
|
$3,500.000
|
|
|
REPAIR (TRACC)
|
EA
|
2.000
|
$4,150.000
|
$2,500.000
|
$2,500.000
|
|
|
REPAIR (REACT)
|
EA
|
5.000
|
$3,500.000
|
$2,500.000
|
$2,000.000
|
|
|
REMOVE AND REPLACE (SMTC) (N)
|
EA
|
2.000
|
$13,300.000
|
$23,000.000
|
$31,500.000
|
|
|
REMOVE AND REPLACE (SMTC) (W)
|
EA
|
2.000
|
$15,200.000
|
$35,000.000
|
$39,800.000
|
|
|
REPAIR (FASTRACC)
|
LF
|
15.000
|
$415.000
|
$500.000
|
$250.000
|
|
|
REPAIR (SMTC) (N)
|
LF
|
20.000
|
$150.000
|
$500.000
|
$500.000
|
|
|
REMOVE AND REPLACE (QUADGUARD)(MASH)(N)
|
EA
|
2.000
|
$12,100.000
|
$10,000.000
|
$31,500.000
|
|
|
REMOVE AND REPLACE (TAU)(MASH)(N)
|
EA
|
2.000
|
$8,590.000
|
$10,000.000
|
$31,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
12.000
|
$100.000
|
$250.000
|
$200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$170.000
|
$1.000
|
$1.000
|
|
Totals: |
$1,287,955.000
|
$1,230,701.000
|
$1,305,201.000
|