|
|
MOBILIZATION (CALLOUT)
|
EA
|
24.000
|
$500.000
|
$1.000
|
$1.000
|
$1,500.000
|
|
|
MOBILIZATION (EMERGENCY)
|
EA
|
12.000
|
$1,500.000
|
$1,250.000
|
$4,000.000
|
$1,500.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
6,000.000
|
$30.000
|
$28.000
|
$23.000
|
$30.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
20.000
|
$2,300.000
|
$1,525.000
|
$1,931.000
|
$2,000.000
|
|
|
MTL BEAM GD FEN TRANS (T101)
|
EA
|
10.000
|
$1,100.000
|
$1,000.000
|
$860.000
|
$1,500.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
20.000
|
$1,100.000
|
$2,000.000
|
$1,472.000
|
$1,500.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$26.840
|
$35.000
|
$27.380
|
$30.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
100.000
|
$80.000
|
$100.000
|
$84.000
|
$60.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
50.000
|
$700.000
|
$300.000
|
$594.000
|
$1,000.000
|
|
|
MTL BM GD FEN TRANS (ANCHOR PLATE)
|
EA
|
10.000
|
$800.000
|
$500.000
|
$639.000
|
$600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,000.000
|
$3.000
|
$3.000
|
$1.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
30.000
|
$300.000
|
$500.000
|
$1.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
120.000
|
$3,200.000
|
$3,450.000
|
$3,650.000
|
$3,500.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
120.000
|
$300.000
|
$1.000
|
$1.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,500.000
|
$500.000
|
$1,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
|
EA
|
2.000
|
$22,000.000
|
$15,000.000
|
$10,000.000
|
$30,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
2.000
|
$25,000.000
|
$32,000.000
|
$28,000.000
|
$34,000.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
2.000
|
$30,000.000
|
$25,000.000
|
$35,000.000
|
$50,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
150.000
|
$35.000
|
$35.000
|
$30.000
|
$35.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
100.000
|
$35.000
|
$30.000
|
$30.000
|
$35.000
|
|
|
REPAIR RAIL ELEMENT (W - BEAM)
|
LF
|
5,000.000
|
$20.000
|
$25.000
|
$16.430
|
$28.000
|
|
|
REPAIR RAIL ELEMENT (THRIE - BEAM)
|
LF
|
50.000
|
$50.000
|
$30.000
|
$43.240
|
$35.000
|
|
|
REPAIR RAIL ELEMENT (CURVED RAIL)
|
LF
|
150.000
|
$55.000
|
$30.000
|
$50.530
|
$40.000
|
|
|
REM / REPL TIMBER/STL POST W/O CONC FND
|
EA
|
250.000
|
$50.000
|
$100.000
|
$48.000
|
$50.000
|
|
|
REM / REPL TIMBER / STL POST W/CONC FND
|
EA
|
50.000
|
$120.000
|
$100.000
|
$100.000
|
$65.000
|
|
|
REALIGN POSTS
|
EA
|
300.000
|
$25.000
|
$15.000
|
$20.000
|
$15.000
|
|
|
INSTALL BLOCKOUT (TYPE SPECIFIED)
|
EA
|
250.000
|
$12.500
|
$90.000
|
$20.000
|
$20.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL RAIL
|
LF
|
200.000
|
$50.000
|
$40.000
|
$54.080
|
$50.000
|
|
|
REPLACE SINGLE GDRAIL TERMINAL POST
|
EA
|
20.000
|
$200.000
|
$150.000
|
$200.000
|
$300.000
|
|
|
REPL SINGLE GDRAIL TERM IMPACT HEAD
|
EA
|
10.000
|
$750.000
|
$200.000
|
$1,047.000
|
$1,200.000
|
|
|
REM & RESET SGT IMPACT HEAD
|
EA
|
10.000
|
$500.000
|
$1.000
|
$1.000
|
$500.000
|
|
|
REPLACE SGT OBJECT MARKER
|
EA
|
10.000
|
$50.000
|
$10.000
|
$50.000
|
$35.000
|
|
|
REPLACE POSTS (TL-3)
|
EA
|
1,000.000
|
$75.000
|
$170.000
|
$183.000
|
$225.000
|
|
|
REPLACE POSTS (TL-4)
|
EA
|
1,500.000
|
$75.000
|
$200.000
|
$290.000
|
$275.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-3)
|
EA
|
10.000
|
$300.000
|
$200.000
|
$250.000
|
$100.000
|
|
|
CABLE SPLICE / TURNBUCKLE (TL-4)
|
EA
|
20.000
|
$300.000
|
$200.000
|
$250.000
|
$100.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-3)
|
EA
|
10.000
|
$150.000
|
$350.000
|
$150.000
|
$50.000
|
|
|
REPAIR CONCRETE FOUNDATION (TL-4)
|
EA
|
20.000
|
$150.000
|
$50.000
|
$150.000
|
$50.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-3)
|
EA
|
10.000
|
$500.000
|
$500.000
|
$250.000
|
$1,250.000
|
|
|
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
|
EA
|
50.000
|
$500.000
|
$500.000
|
$1,150.000
|
$1,250.000
|
|
|
REPLACE CABLE (TL-3)
|
LF
|
250.000
|
$20.000
|
$4.000
|
$5.000
|
$5.000
|
|
|
REPLACE CABLE (TL-4)
|
LF
|
500.000
|
$20.000
|
$4.000
|
$5.000
|
$5.000
|
|
|
CHECK / RE-TENSION CABLE
|
EA
|
100.000
|
$250.000
|
$250.000
|
$100.000
|
$250.000
|
|
|
REPAIR (TRACC)
|
EA
|
5.000
|
$500.000
|
$1,000.000
|
$250.000
|
$2,500.000
|
|
|
REPAIR (SMTC) (N)
|
EA
|
5.000
|
$500.000
|
$1,000.000
|
$2,500.000
|
$2,500.000
|
|
|
REPAIR (SMTC) (W)
|
EA
|
5.000
|
$500.000
|
$1,000.000
|
$2,500.000
|
$2,500.000
|
|
|
REPAIR (VIA -SAND FILL PLASTIC BARRELS)
|
EA
|
5.000
|
$500.000
|
$500.000
|
$500.000
|
$2,500.000
|
|
|
REPAIR (FASTRACC)
|
LF
|
5.000
|
$500.000
|
$1,000.000
|
$500.000
|
$2,500.000
|
|
|
REPAIR (NARROW REACT 350)
|
EA
|
5.000
|
$500.000
|
$900.000
|
$1,000.000
|
$500.000
|
|
|
REPAIR (QUADGUARD)(MASH)(N)
|
EA
|
5.000
|
$500.000
|
$1,200.000
|
$1,000.000
|
$2,500.000
|
|
|
REPAIR (TAU)(MASH)(N)
|
EA
|
5.000
|
$500.000
|
$1,200.000
|
$100.000
|
$2,500.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
10.000
|
$250.000
|
$150.000
|
$250.000
|
$1,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
100.000
|
$500.000
|
$1.000
|
$1.000
|
$200.000
|
|
Totals: |
$1,468,493.000
|
$1,681,104.000
|
$1,807,087.500
|
$2,198,850.000
|