|
|
REMOV CONC (MOWSTRIP)
|
SY
|
90.000
|
$12.000
|
$29.905
|
$70.000
|
$50.000
|
$10.000
|
$45.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
870.000
|
$12.000
|
$39.007
|
$16.000
|
$5.000
|
$10.000
|
$45.000
|
|
|
REMOV CONC (RAIL)
|
LF
|
56.000
|
$17.000
|
$61.353
|
$180.000
|
$170.000
|
$150.000
|
$8,000.000
|
|
|
RMV (12") TRT/UNTRT BASE & ASPH PAV
|
CY
|
2,690.000
|
$18.000
|
$20.897
|
$12.000
|
$40.000
|
$25.000
|
$40.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
143.000
|
$40.000
|
$23.886
|
$45.000
|
$18.000
|
$80.000
|
$50.000
|
|
|
EMBANK (FNL)(DC)(TY B)
|
CY
|
611.000
|
$40.000
|
$18.564
|
$36.000
|
$35.000
|
$80.000
|
$60.000
|
|
|
BACKFILL (TY A)
|
STA
|
9.800
|
$240.000
|
$177.780
|
$1,950.000
|
$1,000.000
|
$500.000
|
$100.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
SY
|
10,550.000
|
$2.500
|
$0.330
|
$0.400
|
$0.750
|
$0.500
|
$1.000
|
|
|
DRILL SEED (TEMP_WARM_COOL)
|
SY
|
9,490.000
|
$0.500
|
$0.330
|
$0.400
|
$0.750
|
$0.500
|
$1.000
|
|
|
SOIL RET BLKT(SL_MOD_CLAY_LONG)
|
SY
|
5,155.000
|
$3.000
|
$4.151
|
$1.500
|
$2.500
|
$2.000
|
$2.500
|
|
|
CEMENT
|
TON
|
34.000
|
$460.000
|
$273.081
|
$325.000
|
$400.000
|
$200.000
|
$380.000
|
|
|
CEMENT TRT (EXIST MATL)(8")
|
SY
|
2,993.000
|
$20.000
|
$5.555
|
$10.000
|
$42.000
|
$10.000
|
$12.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
797.000
|
$10.000
|
$22.695
|
$12.000
|
$22.000
|
$10.000
|
$20.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
184.000
|
$5.000
|
$27.738
|
$25.000
|
$27.000
|
$12.500
|
$25.000
|
|
|
SP MIXES SP-B PG70-22
|
TON
|
810.000
|
$180.000
|
$398.429
|
$160.000
|
$325.000
|
$200.000
|
$320.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
407.000
|
$200.000
|
$408.516
|
$175.000
|
$350.000
|
$200.000
|
$325.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
195.000
|
$17.000
|
$23.325
|
$40.000
|
$30.000
|
$40.000
|
$70.000
|
|
|
CEM STABIL BKFL
|
CY
|
320.000
|
$220.000
|
$229.081
|
$275.000
|
$275.000
|
$500.000
|
$250.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
360.000
|
$200.000
|
$114.020
|
$106.000
|
$250.000
|
$200.000
|
$135.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
405.000
|
$325.000
|
$208.251
|
$350.000
|
$350.000
|
$350.000
|
$350.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
134.900
|
$1,500.000
|
$896.208
|
$1,000.000
|
$1,300.000
|
$1,000.000
|
$1,300.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
51.300
|
$1,750.000
|
$2,358.547
|
$995.000
|
$1,900.000
|
$1,000.000
|
$2,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
44.000
|
$2,000.000
|
$1,558.605
|
$1,100.000
|
$2,500.000
|
$1,000.000
|
$1,800.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
150.000
|
$1,000.000
|
$539.227
|
$610.000
|
$1,200.000
|
$700.000
|
$700.000
|
|
|
REINF CONC SLAB (BOX BEAM)(HPC)
|
SF
|
7,000.000
|
$30.000
|
$21.646
|
$20.000
|
$30.000
|
$30.000
|
$32.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
82.000
|
$950.000
|
$785.869
|
$700.000
|
$900.000
|
$1,200.000
|
$1,200.000
|
|
|
SHEAR KEY
|
CY
|
32.000
|
$500.000
|
$740.435
|
$500.000
|
$850.000
|
$1,000.000
|
$900.000
|
|
|
PRESTR CONC BOX BEAM (5B20)
|
LF
|
1,386.000
|
$301.000
|
$293.925
|
$332.060
|
$335.000
|
$400.000
|
$360.000
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
777.000
|
$28.000
|
$28.369
|
$21.000
|
$20.000
|
$20.000
|
$20.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
100.000
|
$550.000
|
$1,052.724
|
$650.000
|
$1,000.000
|
$750.000
|
$750.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
61.000
|
$575.000
|
$774.019
|
$725.000
|
$750.000
|
$750.000
|
$750.000
|
|
|
RAIL (TY SSTR)(HPC)
|
LF
|
530.000
|
$180.000
|
$143.023
|
$110.000
|
$190.000
|
$125.000
|
$150.000
|
|
|
RAIL (TY T80PP)
|
LF
|
840.000
|
$228.000
|
$94.085
|
$450.000
|
$225.000
|
$275.000
|
$200.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
68.000
|
$240.000
|
$269.507
|
$330.000
|
$275.000
|
$300.000
|
$200.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$75,000.000
|
$95,342.290
|
$135,000.000
|
$125,000.000
|
$385,000.000
|
$350,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$290,000.000
|
$316,046.952
|
$340,000.000
|
$350,000.000
|
$400,000.000
|
$410,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$3,500.000
|
$3,782.557
|
$20,000.000
|
$4,000.000
|
$9,000.000
|
$15,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$7,021.371
|
$15,000.000
|
$18,500.000
|
$18,500.000
|
$25,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
108.000
|
$200.000
|
$189.127
|
$650.000
|
$900.000
|
$510.000
|
$300.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
8.000
|
$250.000
|
$160.583
|
$1,750.000
|
$100.000
|
$510.000
|
$300.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
115.000
|
$53.000
|
$50.643
|
$50.000
|
$45.000
|
$54.000
|
$1.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
115.000
|
$15.000
|
$17.588
|
$15.000
|
$10.000
|
$15.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
448.000
|
$40.000
|
$35.806
|
$42.000
|
$10.000
|
$50.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
448.000
|
$12.000
|
$14.184
|
$12.000
|
$1.000
|
$15.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,850.000
|
$6.000
|
$4.520
|
$6.000
|
$3.900
|
$6.000
|
$1.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,850.000
|
$2.000
|
$1.130
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
595.000
|
$6.500
|
$6.950
|
$7.000
|
$12.000
|
$10.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
595.000
|
$2.000
|
$1.891
|
$1.250
|
$6.000
|
$2.000
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
516.000
|
$138.000
|
$209.827
|
$362.000
|
$350.000
|
$500.000
|
$350.000
|
|
|
CONSTRUCTING DETOURS (EBSS)
|
SY
|
296.000
|
$138.000
|
$150.356
|
$362.000
|
$350.000
|
$500.000
|
$325.000
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
36.000
|
$65.000
|
$40.189
|
$480.000
|
$1,000.000
|
$80.000
|
$700.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
4.000
|
$5,900.000
|
$5,811.355
|
$7,800.000
|
$7,500.000
|
$4,400.000
|
$5,000.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
80.000
|
$100.000
|
$75.651
|
$150.000
|
$150.000
|
$60.000
|
$80.000
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
80.000
|
$22.000
|
$26.477
|
$150.000
|
$50.000
|
$60.000
|
$80.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
700.000
|
$28.000
|
$28.085
|
$26.000
|
$29.000
|
$25.000
|
$25.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,514.000
|
$2,127.215
|
$1,525.000
|
$2,000.000
|
$1,650.000
|
$1,600.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,385.834
|
$1,275.000
|
$1,750.000
|
$1,500.000
|
$1,400.000
|
|
|
MTL BM GD FEN TRANS (31"-28")
|
EA
|
1.000
|
$615.000
|
$472.819
|
$550.000
|
$800.000
|
$800.000
|
$600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,425.000
|
$3.400
|
$2.955
|
$2.500
|
$5.000
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
5.000
|
$225.000
|
$212.423
|
$200.000
|
$500.000
|
$300.000
|
$500.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$220.000
|
$260.050
|
$150.000
|
$500.000
|
$300.000
|
$500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,500.000
|
$3,167.891
|
$3,050.000
|
$3,600.000
|
$3,000.000
|
$3,200.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
1.000
|
$400.000
|
$333.905
|
$500.000
|
$500.000
|
$500.000
|
$800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
4.000
|
$650.000
|
$728.142
|
$925.000
|
$1,000.000
|
$750.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$1,040.000
|
$803.793
|
$975.000
|
$1,200.000
|
$950.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$1,885.084
|
$1,200.000
|
$1,500.000
|
$1,250.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,400.000
|
$1,487.017
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$2,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$1,100.000
|
$945.639
|
$1,000.000
|
$1,500.000
|
$1,000.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,100.000
|
$1,407.811
|
$1,250.000
|
$1,500.000
|
$1,250.000
|
$2,500.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
2.000
|
$2,800.000
|
$4,586.350
|
$4,000.000
|
$5,000.000
|
$3,000.000
|
$8,000.000
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
4.000
|
$4,900.000
|
$5,285.206
|
$7,500.000
|
$7,500.000
|
$4,500.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$150.000
|
$126.917
|
$150.000
|
$400.000
|
$150.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2
|
EA
|
2.000
|
$50.000
|
$46.809
|
$25.000
|
$75.000
|
$38.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
|
EA
|
7.000
|
$40.000
|
$47.281
|
$25.000
|
$75.000
|
$38.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB
|
EA
|
4.000
|
$26.000
|
$20.804
|
$18.000
|
$75.000
|
$33.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
|
EA
|
6.000
|
$36.000
|
$24.586
|
$18.000
|
$75.000
|
$33.000
|
$40.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(YFLX)GF2
|
EA
|
9.000
|
$54.000
|
$20.804
|
$25.000
|
$75.000
|
$38.000
|
$100.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)CTB
|
EA
|
8.000
|
$32.000
|
$21.749
|
$18.000
|
$75.000
|
$33.000
|
$40.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
145.000
|
$4.000
|
$8.258
|
$7.000
|
$10.000
|
$6.550
|
$8.000
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
2,125.000
|
$1.000
|
$1.891
|
$1.500
|
$2.000
|
$1.500
|
$2.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
22.000
|
$30.000
|
$18.912
|
$16.000
|
$20.000
|
$15.500
|
$20.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
5,645.000
|
$1.000
|
$1.891
|
$1.500
|
$2.000
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
120.000
|
$1.100
|
$1.891
|
$1.500
|
$2.000
|
$1.500
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
54.000
|
$9.000
|
$11.347
|
$9.000
|
$12.000
|
$9.000
|
$10.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$1,000.000
|
$1,260.852
|
$1,100.000
|
$1,500.000
|
$1,100.000
|
$1,200.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
212.000
|
$1.000
|
$9.141
|
$7.250
|
$9.000
|
$7.250
|
$10.000
|
|
|
PAVEMENT SLER 6"
|
LF
|
4,542.000
|
$0.500
|
$0.315
|
$0.250
|
$0.500
|
$0.250
|
$1.000
|
|
|
PAVEMENT SLER 8"
|
LF
|
120.000
|
$0.800
|
$0.630
|
$0.500
|
$1.000
|
$0.500
|
$1.000
|
|
|
PAVEMENT SLER 24"
|
LF
|
54.000
|
$2.000
|
$3.152
|
$2.500
|
$3.000
|
$2.500
|
$10.000
|
|
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
|
LF
|
1,975.000
|
$0.900
|
$2.080
|
$1.650
|
$2.000
|
$1.650
|
$2.000
|
|
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
|
LF
|
240.000
|
$0.900
|
$2.080
|
$1.650
|
$2.000
|
$1.650
|
$2.000
|
|
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,115.000
|
$0.900
|
$2.080
|
$1.650
|
$2.000
|
$1.650
|
$2.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
24.000
|
$10.000
|
$10.402
|
$8.250
|
$10.000
|
$8.250
|
$15.000
|
|
|
ELIM EXT PM & MRKS (4")
|
LF
|
680.000
|
$2.500
|
$2.836
|
$2.250
|
$2.500
|
$2.250
|
$4.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
1,010.000
|
$2.500
|
$0.126
|
$0.100
|
$0.250
|
$0.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
30.000
|
$10.000
|
$0.630
|
$0.500
|
$0.750
|
$0.500
|
$5.000
|
|
|
BONDING COURSE
|
GAL
|
384.000
|
$5.150
|
$2.521
|
$3.000
|
$5.000
|
$15.000
|
$8.000
|
|
|
REM LEAD-CONTAINING COATING (4" STRIP)
|
EA
|
105.000
|
$230.000
|
$301.343
|
$239.000
|
$300.000
|
$300.000
|
$400.000
|
|
|
REM LEAD-CONTATINING COATING (6" STRIP)
|
EA
|
24.000
|
$300.000
|
$603.948
|
$479.000
|
$600.000
|
$500.000
|
$600.000
|
|
Totals: |
$3,208,474.100
|
$3,176,311.343
|
$3,637,907.410
|
$4,154,671.500
|
$4,169,930.750
|
$4,688,568.500
|