PREPARING ROW
|
STA
|
99.200
|
$4,600.000
|
$1,200.000
|
$2,700.000
|
$5,000.000
|
$2,500.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
69.000
|
$20.000
|
$37.000
|
$29.000
|
$25.000
|
$24.850
|
|
|
REMOVING CONC (CURB)
|
LF
|
40.000
|
$9.510
|
$8.000
|
$46.000
|
$25.000
|
$24.120
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
10,081.000
|
$6.000
|
$8.000
|
$6.000
|
$5.000
|
$14.500
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
5,465.000
|
$23.000
|
$7.000
|
$4.000
|
$2.500
|
$15.500
|
|
|
BACKFILL (TY A)
|
STA
|
98.640
|
$246.380
|
$235.000
|
$100.000
|
$150.000
|
$266.390
|
|
|
FURNISHING AND PLACING TOPSOIL
|
CY
|
50.000
|
$18.000
|
$30.000
|
$50.000
|
$20.330
|
$64.340
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
93,556.000
|
$0.300
|
$0.400
|
$0.250
|
$0.350
|
$0.350
|
|
|
DRILL SEEDING (TEMP) (WARM)
|
SY
|
93,556.000
|
$0.260
|
$0.300
|
$0.250
|
$0.160
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
1,681.000
|
$20.000
|
$30.000
|
$25.000
|
$30.000
|
$45.000
|
|
|
SPRINKLING (DUST CONTROL)
|
MG
|
397.000
|
$15.000
|
$1.000
|
$20.000
|
$1.000
|
$45.000
|
|
|
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
|
CY
|
5,375.000
|
$42.290
|
$31.000
|
$42.000
|
$55.000
|
$35.500
|
|
|
RWRK BS MTL(TY B)(6")(DEN CNT)(ORG POS)
|
CY
|
5,130.000
|
$3.000
|
$7.900
|
$5.000
|
$20.000
|
$9.450
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
785.000
|
$300.000
|
$250.000
|
$350.000
|
$210.000
|
$341.500
|
|
|
LIME TRT (SUBGRADE)(12")
|
SY
|
39,682.000
|
$3.500
|
$2.750
|
$3.000
|
$2.500
|
$4.000
|
|
|
CEMENT
|
TON
|
354.000
|
$214.000
|
$190.000
|
$215.000
|
$200.000
|
$220.000
|
|
|
CEMENT TRT (MX EXST MTL & NW BS)(10")
|
SY
|
36,794.000
|
$1.500
|
$3.000
|
$3.000
|
$2.500
|
$4.000
|
|
|
SALV,HAUL & STKPL RECL ASPH PAV (4.5")
|
SY
|
30,891.000
|
$2.500
|
$3.000
|
$5.000
|
$2.000
|
$4.950
|
|
|
PRIME COAT (MC-30)
|
GAL
|
7,359.000
|
$5.250
|
$5.000
|
$7.000
|
$5.000
|
$8.500
|
|
|
ASPH (TIER II)
|
GAL
|
11,038.000
|
$5.000
|
$6.750
|
$7.000
|
$5.000
|
$4.750
|
|
|
AGGR (TY-D GR-4P)(SAC-B)
|
CY
|
297.000
|
$81.060
|
$90.000
|
$170.000
|
$150.000
|
$120.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
196.000
|
$2.100
|
$75.000
|
$48.000
|
$10.000
|
$4.340
|
|
|
STRUCT EXCAV
|
CY
|
63.000
|
$29.000
|
$1.000
|
$110.000
|
$100.000
|
$80.410
|
|
|
CEM STABIL BKFL
|
CY
|
40.000
|
$125.000
|
$120.000
|
$110.000
|
$100.000
|
$235.790
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
14.220
|
$157.000
|
$125.000
|
$650.000
|
$150.000
|
$207.080
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
60.000
|
$5.660
|
$0.010
|
$50.000
|
$1.000
|
$22.720
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
28.000
|
$453.000
|
$900.000
|
$720.000
|
$600.000
|
$728.370
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
134.000
|
$315.000
|
$540.000
|
$260.000
|
$200.000
|
$291.390
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
22.000
|
$1,200.000
|
$1,100.000
|
$1,540.000
|
$1,000.000
|
$1,620.130
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$2,500.000
|
$1,440.000
|
$1,830.000
|
$1,500.000
|
$2,274.720
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,830.000
|
$1,440.000
|
$1,830.000
|
$1,500.000
|
$2,577.880
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$405.000
|
$500.000
|
$370.000
|
$750.000
|
$1,366.220
|
|
|
REMOV STR (PIPE)
|
LF
|
611.000
|
$10.000
|
$15.000
|
$10.000
|
$20.000
|
$46.330
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$320,454.780
|
$225,000.000
|
$210,000.000
|
$330,000.000
|
$195,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
12.000
|
$5,300.000
|
$3,400.000
|
$3,550.000
|
$2,500.000
|
$7,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 2)
|
SY
|
312.000
|
$22.000
|
$28.000
|
$22.000
|
$25.000
|
$37.480
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$12.000
|
$10.000
|
$5.000
|
$11.910
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,160.000
|
$5.000
|
$3.000
|
$3.000
|
$4.500
|
$5.320
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,160.000
|
$1.250
|
$1.500
|
$2.000
|
$1.000
|
$1.800
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,160.000
|
$6.000
|
$7.000
|
$11.000
|
$5.000
|
$7.630
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,160.000
|
$1.600
|
$1.500
|
$2.000
|
$1.000
|
$3.280
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
600.000
|
$44.000
|
$30.000
|
$59.000
|
$30.000
|
$87.450
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$6.300
|
$4.000
|
$12.000
|
$10.000
|
$18.080
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
600.000
|
$11.000
|
$12.000
|
$22.000
|
$15.000
|
$26.130
|
|
|
DRIVEWAYS (CONC)
|
SY
|
69.000
|
$80.000
|
$110.000
|
$120.000
|
$100.000
|
$123.310
|
|
|
DRIVEWAYS (ACP)
|
SY
|
967.000
|
$40.000
|
$50.000
|
$42.000
|
$45.000
|
$89.550
|
|
|
TURNOUTS (ACP)
|
SY
|
1,284.000
|
$90.000
|
$108.000
|
$44.000
|
$50.000
|
$120.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
775.000
|
$25.500
|
$29.000
|
$26.000
|
$26.550
|
$29.220
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,260.000
|
$2,100.000
|
$1,480.000
|
$2,065.000
|
$2,403.720
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
450.000
|
$8.000
|
$4.000
|
$12.000
|
$3.500
|
$4.250
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$240.000
|
$270.000
|
$200.000
|
$352.780
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,350.000
|
$3,100.000
|
$2,590.000
|
$3,165.000
|
$3,490.950
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$250.000
|
$410.000
|
$270.000
|
$200.000
|
$901.140
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$1,520.000
|
$1,700.000
|
$3,280.000
|
$1,000.000
|
$449.420
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
1.000
|
$800.750
|
$1,000.000
|
$1,840.000
|
$825.000
|
$1,566.620
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,800.000
|
$9,100.000
|
$7,610.000
|
$8,650.000
|
$9,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 4
|
EA
|
5.000
|
$629.930
|
$310.000
|
$530.000
|
$699.000
|
$632.500
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
167.000
|
$33.000
|
$30.000
|
$66.000
|
$35.000
|
$38.520
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
12.000
|
$800.000
|
$780.000
|
$920.000
|
$817.000
|
$1,027.480
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
11.000
|
$940.000
|
$995.000
|
$1,090.000
|
$460.000
|
$1,182.520
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
23.000
|
$110.000
|
$110.000
|
$110.000
|
$23.000
|
$168.800
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$25.000
|
$25.000
|
$20.000
|
$15.000
|
$25.440
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
16.000
|
$34.000
|
$30.000
|
$37.000
|
$25.000
|
$41.140
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
2.000
|
$85.000
|
$55.000
|
$100.000
|
$50.000
|
$109.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
19,838.000
|
$0.630
|
$0.500
|
$1.000
|
$0.500
|
$0.420
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,500.000
|
$0.700
|
$1.200
|
$3.000
|
$2.270
|
$2.230
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
72.000
|
$3.180
|
$6.800
|
$7.000
|
$7.130
|
$4.360
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,380.000
|
$0.690
|
$0.750
|
$1.000
|
$0.760
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
5,038.000
|
$0.640
|
$0.750
|
$1.000
|
$0.760
|
$1.400
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
19,560.000
|
$0.850
|
$1.200
|
$1.000
|
$1.260
|
$1.070
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
213.000
|
$4.010
|
$4.200
|
$4.000
|
$4.410
|
$8.000
|
|
TRAFFIC BUTTON TY Y
|
EA
|
1,012.000
|
$2.160
|
$2.200
|
$2.000
|
$2.310
|
$4.420
|
|
TRAFFIC BUTTON TY B
|
EA
|
2,988.000
|
$2.120
|
$2.200
|
$2.000
|
$2.310
|
$4.400
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
14,415.000
|
$0.350
|
$0.660
|
$1.000
|
$0.630
|
$1.290
|
|
|
SP MIXES SP-D SAC-A PG76-22
|
TON
|
6,100.000
|
$122.000
|
$121.500
|
$130.000
|
$140.000
|
$155.690
|
|
|
BONDING COURSE
|
GAL
|
2,497.000
|
$5.270
|
$3.000
|
$8.000
|
$3.500
|
$7.520
|
|
|
THERMOPLASTIC PIPE (PP) (18")
|
LF
|
428.000
|
$46.910
|
$66.000
|
$50.000
|
$122.450
|
$100.000
|
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
296.000
|
$60.000
|
$144.000
|
$67.000
|
$147.750
|
$120.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$20,000.000
|
$8,000.000
|
$250.000
|
$1,000.000
|
$21,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
184.000
|
$73.900
|
$45.000
|
$50.000
|
$1.000
|
$332.350
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
184.000
|
$355.760
|
$1.000
|
$50.000
|
$10.000
|
$388.470
|
|
Totals: |
$3,523,021.313
|
$3,015,724.300
|
$3,311,550.000
|
$3,481,372.330
|
$4,144,042.177
|