|
|
REMOVING CONC (RIPRAP)
|
SY
|
145.000
|
$50.000
|
$40.000
|
$100.000
|
$80.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
195.000
|
$10.000
|
$50.000
|
$100.000
|
$70.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
135.000
|
$20.000
|
$40.000
|
$250.000
|
$70.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
5,505.000
|
$2.000
|
$0.615
|
$2.000
|
$0.550
|
|
|
VEGETATIVE WATERING
|
MG
|
111.000
|
$14.000
|
$12.560
|
$12.000
|
$25.000
|
|
|
REWORK BS MTL (TY B)(12")(DENS CONT)
|
SY
|
85.000
|
$12.000
|
$54.000
|
$100.000
|
$40.000
|
|
|
REWORK BS MTL (TY C)(12")(DENS CONT)
|
SY
|
445.000
|
$12.000
|
$64.000
|
$100.000
|
$31.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
90.000
|
$8.000
|
$14.313
|
$40.000
|
$23.100
|
|
|
AGGR(TY-PE GR-4 SAC-B)
|
CY
|
58.000
|
$300.000
|
$229.237
|
$450.000
|
$495.000
|
|
|
ASPH (AC-15P OR AC-10-2TR OR CRS-2P)
|
GAL
|
2,750.000
|
$10.000
|
$11.518
|
$8.000
|
$6.330
|
|
|
D-GR HMA(SQ) TY-C SAC-A PG64-22
|
TON
|
49.000
|
$250.000
|
$348.888
|
$800.000
|
$495.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
6,100.000
|
$5.000
|
$2.740
|
$8.000
|
$3.690
|
|
|
CEM STABIL BKFL
|
CY
|
195.000
|
$200.000
|
$170.850
|
$150.000
|
$206.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
254.000
|
$20.000
|
$40.000
|
$200.000
|
$35.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
229.000
|
$180.000
|
$420.000
|
$1,000.000
|
$205.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
20.000
|
$600.000
|
$450.000
|
$1,000.000
|
$1,150.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
52.000
|
$300.000
|
$150.000
|
$250.000
|
$155.000
|
|
|
CLEAN & PAINT EXIST STR (SYSTEM II)
|
LS
|
1.000
|
$240,000.000
|
$285,000.000
|
$150,000.000
|
$725,895.000
|
|
|
HEADER TYPE EXPANSION JOINT
|
CF
|
288.000
|
$350.000
|
$339.860
|
$500.000
|
$435.000
|
|
|
JOINT SEALANT
|
LF
|
1,170.000
|
$15.000
|
$14.350
|
$40.000
|
$28.500
|
|
|
RAISING EXIST STRUCT
|
LS
|
1.000
|
$300,000.000
|
$106,736.670
|
$150,000.000
|
$420,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$129,720.000
|
$189,900.000
|
$180,000.000
|
$205,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
5.000
|
$8,000.000
|
$1,264.901
|
$10,000.000
|
$10,500.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$24.000
|
$18.450
|
$25.000
|
$16.500
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$10.000
|
$12.300
|
$10.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
3,150.000
|
$4.000
|
$2.460
|
$3.500
|
$2.200
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
3,150.000
|
$1.000
|
$0.308
|
$0.500
|
$0.280
|
|
|
PTB(FRN&INSTL)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
270.000
|
$45.000
|
$40.810
|
$80.000
|
$30.000
|
|
|
PTB(MOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
270.000
|
$20.000
|
$25.338
|
$15.000
|
$12.500
|
|
|
PTB(REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
270.000
|
$15.000
|
$22.089
|
$10.000
|
$18.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$12,000.000
|
$11,625.694
|
$15,000.000
|
$10,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
2.000
|
$1,800.000
|
$1,453.212
|
$2,500.000
|
$2,500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$1,453.212
|
$2,500.000
|
$2,500.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
180.000
|
$5.000
|
$12.300
|
$4.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$12.000
|
$12.300
|
$10.000
|
$11.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
8,280.000
|
$1.000
|
$0.615
|
$0.800
|
$0.550
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
95.000
|
$2.000
|
$1.200
|
$10.000
|
$5.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
875.000
|
$2.000
|
$1.000
|
$5.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
430.000
|
$0.600
|
$1.845
|
$5.000
|
$1.650
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
3,600.000
|
$0.500
|
$0.615
|
$1.000
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
10,800.000
|
$0.500
|
$0.615
|
$0.500
|
$0.550
|
|
REFL PAV MRKR TY I-C
|
EA
|
22.000
|
$4.000
|
$12.300
|
$10.000
|
$11.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
118.000
|
$4.000
|
$12.300
|
$10.000
|
$11.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,960.000
|
$0.400
|
$0.824
|
$1.000
|
$0.740
|
|
|
TREE TRIMMING / BRUSH REMOVAL(CHANNELS)
|
AC
|
0.150
|
$12,000.000
|
$2,704.020
|
$40,000.000
|
$63,000.000
|
|
|
CONCRETE RAIL REPAIR (IN-KIND)
|
LF
|
12.000
|
$500.000
|
$170.000
|
$2,000.000
|
$1,250.000
|
|
|
REP STL BRIDGE MEMBER (BEARINGS)
|
EA
|
90.000
|
$1,400.000
|
$1,000.000
|
$2,000.000
|
$66.000
|
|
|
BRIDGE JOINT REPLACEMENT (ARMOR)
|
LF
|
84.000
|
$275.000
|
$308.510
|
$500.000
|
$485.000
|
|
|
CARBON FIBER REINF POLYMER PROTECTION
|
SF
|
160.000
|
$80.000
|
$511.000
|
$200.000
|
$65.000
|
|
|
REPLACE ELASTOMERIC BEARING PADS
|
EA
|
1.000
|
$3,000.000
|
$900.000
|
$10,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$12,000.000
|
$9,329.030
|
$12,500.000
|
$13,200.000
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$30,000.000
|
$9,375.140
|
$20,000.000
|
$24,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
56.000
|
$150.000
|
$55.000
|
$150.000
|
$50.000
|
|
Totals: |
$1,426,920.000
|
$1,339,951.967
|
$1,831,571.000
|
$2,096,642.150
|