PREPARING ROW
|
STA
|
335.000
|
$550.000
|
$450.000
|
$1,213.000
|
$1,800.000
|
$1,000.000
|
$1,630.000
|
$500.000
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
4.550
|
$115.000
|
$38.000
|
$120.000
|
$85.000
|
$220.000
|
$85.000
|
$360.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
95.000
|
$17.500
|
$15.000
|
$56.000
|
$35.000
|
$105.000
|
$25.000
|
$35.000
|
|
|
REMOVING STAB BASE & ASPH PAV (10"-12")
|
SY
|
106,297.000
|
$4.000
|
$3.500
|
$5.350
|
$1.850
|
$8.000
|
$5.250
|
$2.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
44,557.000
|
$8.000
|
$6.750
|
$11.000
|
$16.750
|
$17.000
|
$15.000
|
$24.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
10,932.000
|
$9.000
|
$3.300
|
$30.000
|
$24.000
|
$14.500
|
$15.000
|
$60.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
101,907.000
|
$1.000
|
$1.350
|
$1.000
|
$1.450
|
$2.000
|
$1.750
|
$1.700
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
50,954.000
|
$0.110
|
$0.140
|
$0.200
|
$0.160
|
$0.200
|
$0.160
|
$0.200
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
50,954.000
|
$0.110
|
$0.140
|
$0.200
|
$0.160
|
$0.200
|
$0.160
|
$0.200
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
132,021.000
|
$0.300
|
$0.280
|
$0.300
|
$0.280
|
$0.300
|
$0.280
|
$0.300
|
|
|
VEGETATIVE WATERING
|
MG
|
2,038.000
|
$16.500
|
$34.000
|
$13.000
|
$26.000
|
$20.000
|
$18.000
|
$32.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
101,907.000
|
$0.900
|
$1.350
|
$1.000
|
$1.000
|
$1.000
|
$0.900
|
$1.000
|
|
|
FL BS (RDWY DEL)(TY A GR 5)
|
TON
|
1,820.000
|
$25.000
|
$25.000
|
$16.000
|
$13.000
|
$10.000
|
$27.000
|
$63.000
|
|
|
CEMENT
|
TON
|
2,552.000
|
$140.000
|
$155.000
|
$133.000
|
$132.000
|
$135.000
|
$145.000
|
$152.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
128,862.000
|
$1.850
|
$1.600
|
$3.250
|
$2.250
|
$2.750
|
$2.500
|
$4.600
|
|
|
ASPH (TIER II)
|
GAL
|
48,978.000
|
$3.500
|
$3.520
|
$3.500
|
$3.100
|
$3.200
|
$3.500
|
$3.300
|
|
|
ASPH (RC-250)
|
GAL
|
32,216.000
|
$3.850
|
$4.250
|
$4.000
|
$3.750
|
$3.800
|
$4.000
|
$3.900
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
1,074.000
|
$105.000
|
$108.000
|
$102.000
|
$110.000
|
$100.000
|
$150.000
|
$150.000
|
|
|
AGGR(TY-PD GR-5 SAC-B)
|
CY
|
859.000
|
$110.000
|
$142.000
|
$135.000
|
$145.000
|
$130.000
|
$145.000
|
$165.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
17,715.000
|
$62.500
|
$73.800
|
$70.000
|
$75.000
|
$66.000
|
$80.000
|
$75.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
10,630.000
|
$70.000
|
$85.000
|
$80.000
|
$82.000
|
$76.000
|
$85.000
|
$85.000
|
|
|
D-GR HMA TY-C PG70-22 (LEVEL-UP)
|
TON
|
20.000
|
$200.000
|
$284.000
|
$269.000
|
$300.000
|
$300.000
|
$145.000
|
$330.000
|
|
|
CUT & RESTORING PAV
|
SY
|
861.000
|
$95.000
|
$58.000
|
$69.000
|
$100.000
|
$126.000
|
$75.000
|
$135.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
182.000
|
$200.000
|
$152.000
|
$190.000
|
$125.000
|
$200.000
|
$165.000
|
$170.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,120.000
|
$23.500
|
$31.000
|
$80.000
|
$18.000
|
$45.000
|
$68.000
|
$60.000
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
28.000
|
$189.000
|
$150.000
|
$900.000
|
$350.000
|
$450.000
|
$425.000
|
$165.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
420.000
|
$400.000
|
$355.000
|
$350.000
|
$385.000
|
$550.000
|
$475.000
|
$540.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
182.000
|
$125.000
|
$143.000
|
$140.000
|
$175.000
|
$275.000
|
$152.000
|
$150.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
127.000
|
$475.000
|
$310.000
|
$521.000
|
$450.000
|
$650.000
|
$475.000
|
$460.000
|
|
|
CONC BOX CULV (10 FT X 5 FT)(EXTEND)
|
LF
|
30.000
|
$980.000
|
$1,725.000
|
$706.000
|
$1,300.000
|
$2,000.000
|
$2,600.000
|
$1,400.000
|
|
|
CONC BOX CULV (10 FT X 6 FT)(EXTEND)
|
LF
|
77.000
|
$950.000
|
$930.000
|
$735.000
|
$1,350.000
|
$2,100.000
|
$2,000.000
|
$1,600.000
|
|
|
CONC BOX CULVERT (2 FT X 2 FT) (EXTEND)
|
LF
|
15.000
|
$600.000
|
$435.000
|
$432.000
|
$375.000
|
$1,100.000
|
$700.000
|
$1,100.000
|
|
|
CONC BOX CULVERT (10 FT X 4 FT)(EXTEND)
|
LF
|
14.000
|
$850.000
|
$915.000
|
$985.000
|
$1,400.000
|
$3,000.000
|
$1,700.000
|
$1,700.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
676.000
|
$60.000
|
$83.000
|
$54.000
|
$70.000
|
$65.000
|
$85.000
|
$103.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
244.000
|
$80.000
|
$124.000
|
$69.000
|
$90.000
|
$90.000
|
$95.000
|
$118.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
56.000
|
$130.000
|
$200.000
|
$145.000
|
$140.000
|
$175.000
|
$135.000
|
$216.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 1)
|
LF
|
916.000
|
$100.000
|
$165.000
|
$104.000
|
$135.000
|
$135.000
|
$165.000
|
$165.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 2)
|
LF
|
88.000
|
$175.000
|
$190.000
|
$179.000
|
$185.000
|
$220.000
|
$172.000
|
$256.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 3)
|
LF
|
204.000
|
$150.000
|
$230.000
|
$162.000
|
$210.000
|
$170.000
|
$178.000
|
$220.000
|
|
|
RC PIPE (ARCH)(CL III)(DES 4)
|
LF
|
96.000
|
$200.000
|
$300.000
|
$230.000
|
$275.000
|
$300.000
|
$215.000
|
$330.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$4,800.000
|
$1,725.000
|
$3,700.000
|
$6,200.000
|
$6,000.000
|
$7,500.000
|
$11,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$6,200.000
|
$4,600.000
|
$6,600.000
|
$12,000.000
|
$10,000.000
|
$12,500.000
|
$16,000.000
|
|
|
HEADWALL (CH - PW - A - 0) (DES= 4)
|
EA
|
6.000
|
$4,000.000
|
$4,600.000
|
$3,000.000
|
$6,700.000
|
$6,000.000
|
$6,800.000
|
$11,000.000
|
|
|
WINGWALL (FW - 0) (HW=6 FT)
|
EA
|
2.000
|
$7,950.000
|
$8,500.000
|
$5,400.000
|
$4,100.000
|
$4,000.000
|
$4,600.000
|
$29,000.000
|
|
|
WINGWALL (FW - 0) (HW=9 FT)
|
EA
|
2.000
|
$14,100.000
|
$15,000.000
|
$13,400.000
|
$14,000.000
|
$12,000.000
|
$28,000.000
|
$65,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$8,500.000
|
$5,500.000
|
$4,500.000
|
$4,100.000
|
$4,000.000
|
$6,000.000
|
$26,000.000
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
6.000
|
$18,000.000
|
$18,500.000
|
$20,500.000
|
$25,000.000
|
$18,000.000
|
$41,000.000
|
$65,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
38.000
|
$910.000
|
$970.000
|
$1,400.000
|
$900.000
|
$1,600.000
|
$2,000.000
|
$2,100.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$900.000
|
$1,110.000
|
$1,940.000
|
$1,200.000
|
$1,700.000
|
$2,300.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
12.000
|
$1,150.000
|
$1,180.000
|
$2,200.000
|
$1,400.000
|
$1,700.000
|
$2,300.000
|
$2,100.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$1,000.000
|
$1,220.000
|
$2,100.000
|
$1,500.000
|
$2,000.000
|
$4,200.000
|
$1,800.000
|
|
|
SET (TY II) (DES 2) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$2,000.000
|
$1,650.000
|
$2,700.000
|
$2,200.000
|
$2,100.000
|
$4,200.000
|
$1,600.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
18.000
|
$2,100.000
|
$2,325.000
|
$4,000.000
|
$2,900.000
|
$2,300.000
|
$4,800.000
|
$2,400.000
|
|
|
SET (TY II) (DES 4) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$3,500.000
|
$4,600.000
|
$8,700.000
|
$3,200.000
|
$6,000.000
|
$6,800.000
|
$2,800.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
12.000
|
$1,100.000
|
$1,150.000
|
$3,300.000
|
$1,300.000
|
$2,500.000
|
$2,500.000
|
$3,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,977.400
|
$12.000
|
$18.000
|
$11.000
|
$20.000
|
$30.000
|
$18.000
|
$35.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$620,500.000
|
$420,000.000
|
$641,500.000
|
$820,000.000
|
$750,000.000
|
$920,000.000
|
$400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
22.000
|
$5,000.000
|
$14,800.000
|
$10,000.000
|
$3,250.000
|
$1,500.000
|
$2,500.000
|
$1,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
530.000
|
$22.000
|
$26.500
|
$26.000
|
$28.000
|
$25.000
|
$24.500
|
$27.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
530.000
|
$9.000
|
$6.800
|
$13.000
|
$15.000
|
$13.000
|
$12.000
|
$13.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,070.000
|
$2.500
|
$3.000
|
$2.500
|
$2.500
|
$2.200
|
$2.500
|
$2.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,070.000
|
$0.600
|
$0.400
|
$0.500
|
$0.750
|
$0.500
|
$0.500
|
$0.600
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,614.000
|
$50.000
|
$20.000
|
$36.000
|
$40.000
|
$40.000
|
$70.000
|
$15.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,567.800
|
$30.000
|
$35.000
|
$27.000
|
$35.000
|
$30.000
|
$42.000
|
$63.000
|
|
|
TURNOUTS (ACP)
|
SY
|
290.100
|
$37.000
|
$75.000
|
$62.000
|
$54.000
|
$70.000
|
$42.000
|
$150.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,610.500
|
$19.500
|
$28.190
|
$21.000
|
$27.000
|
$25.000
|
$25.000
|
$27.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
13.000
|
$965.000
|
$1,165.000
|
$1,000.000
|
$985.000
|
$900.000
|
$900.000
|
$1,000.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
250.000
|
$22.500
|
$22.800
|
$24.000
|
$21.000
|
$20.000
|
$19.500
|
$21.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
50.000
|
$50.000
|
$65.000
|
$56.000
|
$50.000
|
$50.000
|
$48.000
|
$52.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
10.000
|
$2,250.000
|
$3,100.000
|
$1,600.000
|
$2,900.000
|
$2,700.000
|
$2,650.000
|
$2,900.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
22.000
|
$225.000
|
$212.000
|
$200.000
|
$205.000
|
$190.000
|
$190.000
|
$202.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
6.000
|
$325.000
|
$255.000
|
$210.000
|
$218.000
|
$200.000
|
$225.000
|
$213.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
1.000
|
$573.000
|
$615.000
|
$520.000
|
$535.000
|
$500.000
|
$540.000
|
$530.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
3.000
|
$600.000
|
$915.000
|
$970.000
|
$995.000
|
$1,000.000
|
$1,515.000
|
$980.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
46.000
|
$490.000
|
$405.000
|
$490.000
|
$510.000
|
$500.000
|
$450.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
6.000
|
$550.000
|
$521.000
|
$620.000
|
$640.000
|
$600.000
|
$555.000
|
$630.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
1.000
|
$740.000
|
$860.000
|
$835.000
|
$860.000
|
$600.000
|
$760.000
|
$850.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
53.000
|
$75.000
|
$85.000
|
$108.000
|
$112.000
|
$100.000
|
$75.000
|
$110.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
34.000
|
$40.000
|
$45.000
|
$50.000
|
$50.000
|
$50.000
|
$39.000
|
$48.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
71.000
|
$25.000
|
$17.000
|
$18.000
|
$19.000
|
$20.000
|
$14.750
|
$18.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,624.000
|
$1.000
|
$1.500
|
$1.000
|
$1.000
|
$1.000
|
$1.000
|
$1.700
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,290.000
|
$1.000
|
$0.680
|
$1.000
|
$1.000
|
$0.600
|
$0.600
|
$0.700
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
114.000
|
$6.750
|
$9.100
|
$9.000
|
$8.000
|
$10.000
|
$0.800
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
7.000
|
$130.000
|
$136.000
|
$130.000
|
$150.000
|
$150.000
|
$120.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
7.000
|
$150.000
|
$159.000
|
$150.000
|
$200.000
|
$150.000
|
$140.000
|
$190.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
10.000
|
$40.000
|
$51.000
|
$48.000
|
$20.000
|
$50.000
|
$45.000
|
$20.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
66,753.000
|
$0.400
|
$0.340
|
$0.300
|
$0.400
|
$0.400
|
$0.300
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
3,053.000
|
$0.400
|
$0.360
|
$0.300
|
$0.400
|
$0.400
|
$0.320
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
50,300.000
|
$0.400
|
$0.350
|
$0.300
|
$0.400
|
$0.400
|
$0.320
|
$0.400
|
|
REFL PAV MRKR TY I-C
|
EA
|
65.000
|
$3.300
|
$4.850
|
$4.500
|
$3.600
|
$5.000
|
$4.250
|
$3.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
801.000
|
$3.600
|
$4.250
|
$4.000
|
$3.600
|
$5.000
|
$3.750
|
$3.500
|
|
|
TMA (STATIONARY)
|
DAY
|
66.000
|
$335.000
|
$220.000
|
$255.000
|
$350.000
|
$300.000
|
$300.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
120.000
|
$50.000
|
$65.000
|
$55.000
|
$90.000
|
$200.000
|
$105.000
|
$91.000
|
|
Totals: |
$6,825,458.280
|
$7,208,328.305
|
$8,229,783.350
|
$8,421,331.960
|
$8,791,095.700
|
$9,610,412.520
|
$9,795,232.900
|