PREPARING ROW
|
STA
|
28.700
|
$3,000.000
|
$2,500.000
|
$870.000
|
$1,343.000
|
$1,428.980
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
2.000
|
$77.000
|
$500.000
|
$650.000
|
$3,637.000
|
$94.690
|
|
|
REMOVING STAB BASE AND ASPH PAV(0"-16")
|
SY
|
4,935.000
|
$6.630
|
$3.500
|
$9.400
|
$2.500
|
$12.550
|
|
|
OBLITERATING ABANDONED ROAD
|
SY
|
1,989.000
|
$4.780
|
$3.500
|
$7.100
|
$6.000
|
$14.380
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
3,900.000
|
$10.080
|
$10.000
|
$15.000
|
$9.000
|
$17.450
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
4,602.000
|
$4.250
|
$12.000
|
$30.000
|
$16.000
|
$18.620
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
14,713.000
|
$1.970
|
$3.000
|
$3.500
|
$1.500
|
$0.310
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
14,713.000
|
$0.280
|
$0.410
|
$0.600
|
$0.450
|
$0.660
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
14,713.000
|
$0.320
|
$0.400
|
$0.550
|
$0.450
|
$0.660
|
|
|
VEGETATIVE WATERING
|
MG
|
24.800
|
$34.360
|
$100.000
|
$34.900
|
$656.000
|
$49.280
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
14,713.000
|
$1.100
|
$2.000
|
$2.150
|
$1.350
|
$2.760
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
4,785.000
|
$46.580
|
$52.000
|
$50.000
|
$75.000
|
$70.390
|
|
|
LIME TRT (EXST MATL)(10")
|
SY
|
9,951.000
|
$7.750
|
$3.000
|
$6.400
|
$11.000
|
$7.340
|
|
|
LIME (HYD, COM OR QK)(SLURRY)
|
TON
|
224.000
|
$290.800
|
$350.000
|
$310.000
|
$338.000
|
$409.250
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
1,544.000
|
$6.570
|
$4.500
|
$6.350
|
$6.000
|
$8.810
|
|
|
CEM STABIL BKFL
|
CY
|
141.000
|
$125.840
|
$165.000
|
$183.000
|
$136.000
|
$257.350
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
32.000
|
$6.900
|
$40.000
|
$55.100
|
$122.000
|
$190.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
261.000
|
$435.340
|
$260.000
|
$260.000
|
$372.000
|
$360.020
|
|
|
CL C CONC (ABUT)
|
CY
|
47.400
|
$1,216.170
|
$1,029.000
|
$1,220.000
|
$1,156.000
|
$1,381.660
|
|
|
CL C CONC (CAP)
|
CY
|
32.000
|
$2,275.650
|
$1,402.800
|
$1,660.000
|
$1,364.000
|
$1,661.280
|
|
|
CL C CONC (COLUMN)
|
CY
|
5.600
|
$2,406.050
|
$3,500.000
|
$4,070.000
|
$2,372.000
|
$5,443.830
|
|
|
REINF CONC SLAB
|
SF
|
9,000.000
|
$20.000
|
$24.000
|
$28.000
|
$33.500
|
$40.290
|
|
|
APPROACH SLAB
|
CY
|
67.000
|
$600.000
|
$685.000
|
$710.000
|
$895.000
|
$813.780
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
1,236.700
|
$150.760
|
$195.000
|
$165.000
|
$258.000
|
$247.950
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
798.000
|
$115.000
|
$160.000
|
$165.000
|
$236.000
|
$159.780
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
23.300
|
$505.170
|
$475.000
|
$870.000
|
$687.000
|
$793.160
|
|
|
RAIL (TY T223)
|
LF
|
540.000
|
$149.560
|
$75.000
|
$168.000
|
$191.000
|
$114.560
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
73.000
|
$225.000
|
$100.000
|
$260.000
|
$305.000
|
$318.750
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
192.000
|
$70.130
|
$95.200
|
$75.100
|
$95.000
|
$156.030
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
125.000
|
$90.490
|
$126.000
|
$119.000
|
$131.000
|
$181.830
|
|
|
SET (TY I)(S=12 FT)(HW=6FT)(4:1)(C)
|
EA
|
1.000
|
$18,000.000
|
$27,468.000
|
$19,000.000
|
$31,188.000
|
$35,147.650
|
|
|
SET (TY I)(S=12 FT)(HW=7FT)(4:1)(C)
|
EA
|
1.000
|
$20,000.000
|
$33,068.000
|
$24,900.000
|
$52,221.000
|
$36,506.540
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,369.830
|
$2,086.000
|
$2,110.000
|
$3,690.000
|
$1,737.720
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
8.000
|
$2,104.720
|
$2,366.000
|
$2,370.000
|
$4,264.000
|
$2,053.970
|
|
|
REMOV STR (WINGWALL)
|
EA
|
2.000
|
$3,436.020
|
$950.000
|
$5,500.000
|
$8,720.000
|
$2,007.640
|
|
|
REMOV STR (PIPE)
|
LF
|
89.000
|
$21.700
|
$20.000
|
$16.250
|
$54.000
|
$25.690
|
|
|
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
|
EA
|
1.000
|
$18,332.670
|
$35,000.000
|
$16,400.000
|
$30,000.000
|
$22,054.670
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$208,942.890
|
$255,000.000
|
$235,000.000
|
$112,000.000
|
$181,703.020
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
13.000
|
$5,000.000
|
$5,500.000
|
$2,800.000
|
$1,553.000
|
$4,928.680
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
226.000
|
$34.670
|
$39.990
|
$40.550
|
$46.000
|
$65.680
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
348.000
|
$93.090
|
$96.800
|
$91.900
|
$110.000
|
$102.160
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
320.000
|
$34.100
|
$51.390
|
$81.100
|
$59.000
|
$94.860
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,120.000
|
$16.110
|
$26.040
|
$35.100
|
$29.000
|
$21.890
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
445.000
|
$3.840
|
$387.000
|
$4.050
|
$6.000
|
$8.760
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
445.000
|
$0.400
|
$0.530
|
$0.550
|
$0.600
|
$2.920
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$4.680
|
$3.920
|
$8.100
|
$4.000
|
$13.140
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$4.080
|
$0.810
|
$4.850
|
$1.000
|
$1.470
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
226.000
|
$42.500
|
$80.620
|
$81.100
|
$158.000
|
$110.150
|
|
|
DRIVEWAYS (ACP)
|
SY
|
903.000
|
$93.060
|
$50.000
|
$110.000
|
$85.000
|
$124.250
|
|
|
TURNOUTS (ACP)
|
SY
|
66.000
|
$150.000
|
$50.000
|
$117.000
|
$85.000
|
$203.610
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$27.300
|
$23.130
|
$27.850
|
$32.000
|
$44.140
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$2,224.330
|
$2,042.500
|
$2,130.000
|
$2,400.000
|
$2,869.180
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$3,824.510
|
$3,063.750
|
$3,670.000
|
$4,126.000
|
$3,457.720
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$330.000
|
$376.250
|
$370.000
|
$1,338.000
|
$514.980
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
5.000
|
$568.240
|
$806.250
|
$790.000
|
$945.000
|
$1,103.530
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$659.670
|
$913.750
|
$900.000
|
$945.000
|
$1,240.540
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
14.000
|
$104.630
|
$107.500
|
$105.000
|
$243.000
|
$145.950
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
8.000
|
$25.400
|
$26.870
|
$26.350
|
$17.000
|
$36.490
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
4.000
|
$64.000
|
$69.870
|
$68.500
|
$63.000
|
$94.870
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
6.000
|
$11.760
|
$21.500
|
$21.100
|
$15.000
|
$29.190
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
13.000
|
$29.000
|
$25.800
|
$36.900
|
$52.130
|
$51.080
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
26.000
|
$16.090
|
$33.000
|
$27.000
|
$36.000
|
$36.490
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
5,660.000
|
$0.610
|
$1.620
|
$1.900
|
$1.800
|
$2.570
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
5,478.000
|
$0.600
|
$1.620
|
$1.900
|
$1.800
|
$2.570
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
67.000
|
$3.910
|
$33.000
|
$27.000
|
$36.000
|
$36.490
|
|
|
D-GR HMA TY-D PG 76-22 SAC-B (EXEMPT)
|
TON
|
925.000
|
$159.040
|
$120.000
|
$185.000
|
$225.000
|
$257.010
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,000.000
|
$14,500.000
|
$10,400.000
|
$9,000.000
|
$2,614.870
|
|
|
DEAD END ROADWAY BARRICADE
|
LF
|
20.000
|
$70.310
|
$165.000
|
$158.000
|
$250.000
|
$218.920
|
|
Totals: |
$2,298,371.819
|
$2,578,218.990
|
$2,675,622.920
|
$2,951,569.540
|
$3,128,899.995
|