PREPARING ROW
|
STA
|
81.200
|
$2,000.000
|
$1,000.000
|
$910.200
|
$3,914.010
|
$3,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
46.000
|
$22.000
|
$45.000
|
$31.500
|
$98.500
|
$60.000
|
|
|
REMOVING STAB BASE & ASPH PAV (9")
|
SY
|
4,212.000
|
$7.000
|
$4.000
|
$7.000
|
$6.170
|
$16.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
4,251.000
|
$15.000
|
$25.000
|
$23.600
|
$37.600
|
$27.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
3,659.000
|
$20.000
|
$17.000
|
$23.600
|
$24.700
|
$21.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
23,699.000
|
$2.000
|
$1.300
|
$1.960
|
$6.250
|
$6.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
23,699.000
|
$0.300
|
$0.400
|
$0.320
|
$0.520
|
$0.400
|
|
|
BROADCAST SEED (TEMP)(WARM OR COOL)
|
SY
|
23,699.000
|
$0.350
|
$0.280
|
$0.320
|
$0.200
|
$0.400
|
|
|
VEGETATIVE WATERING
|
MG
|
40.100
|
$25.000
|
$90.000
|
$27.600
|
$100.000
|
$35.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
23,699.000
|
$1.150
|
$1.250
|
$1.190
|
$1.780
|
$1.500
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
|
CY
|
3,679.000
|
$65.000
|
$91.000
|
$91.880
|
$67.000
|
$100.000
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
3,063.000
|
$5.000
|
$10.000
|
$7.900
|
$4.250
|
$6.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,500.000
|
$75.000
|
$123.000
|
$71.500
|
$71.000
|
$98.000
|
|
|
CEM STABIL BKFL
|
CY
|
375.000
|
$150.000
|
$180.000
|
$259.220
|
$225.000
|
$320.000
|
|
|
CUT & RESTORING PAV
|
SY
|
190.000
|
$100.000
|
$60.000
|
$324.030
|
$225.000
|
$260.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
21.600
|
$250.000
|
$380.000
|
$299.190
|
$415.000
|
$315.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
166.000
|
$6.000
|
$25.000
|
$58.320
|
$15.500
|
$42.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
616.000
|
$30.000
|
$30.000
|
$31.310
|
$45.000
|
$45.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
100.000
|
$300.000
|
$380.000
|
$238.250
|
$200.000
|
$315.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
100.000
|
$500.000
|
$885.000
|
$712.860
|
$668.000
|
$770.000
|
|
|
CONC BOX CULV (5 FT X 4 FT)
|
LF
|
50.000
|
$900.000
|
$1,000.000
|
$863.010
|
$726.200
|
$860.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
22.100
|
$1,500.000
|
$1,800.000
|
$3,332.140
|
$1,699.550
|
$3,600.000
|
|
|
CONC BOX CULV (6 FT X 2 FT)
|
LF
|
190.000
|
$550.000
|
$820.000
|
$807.170
|
$726.200
|
$760.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 3)
|
LF
|
110.000
|
$190.000
|
$245.000
|
$294.550
|
$288.000
|
$325.000
|
|
|
RC PIPE (ARCH)(CL IV)(DES 1)
|
LF
|
365.000
|
$190.000
|
$205.000
|
$248.410
|
$298.000
|
$270.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
5.000
|
$11,750.000
|
$16,000.000
|
$9,278.150
|
$8,430.000
|
$21,000.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
2.000
|
$13,500.000
|
$27,000.000
|
$18,891.130
|
$19,537.500
|
$37,300.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
3.000
|
$15,000.000
|
$30,000.000
|
$19,431.190
|
$23,542.500
|
$39,200.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$20,000.000
|
$40,000.000
|
$27,532.010
|
$27,690.000
|
$50,300.000
|
|
|
SET (TY II) (DES 1) (RCP) (6: 1) (P)
|
EA
|
14.000
|
$1,900.000
|
$2,200.000
|
$2,545.820
|
$2,427.650
|
$2,900.000
|
|
|
SET (TY II) (DES 3) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$3,500.000
|
$3,200.000
|
$4,967.430
|
$5,702.750
|
$3,200.000
|
|
|
REMOV STR (SET)
|
EA
|
8.000
|
$650.000
|
$700.000
|
$403.960
|
$525.000
|
$805.000
|
|
|
REMOV STR (HEADWALL)
|
EA
|
10.000
|
$2,500.000
|
$750.000
|
$1,825.390
|
$1,250.000
|
$1,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
448.000
|
$28.000
|
$20.000
|
$21.590
|
$37.000
|
$33.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
42.000
|
$100.000
|
$130.000
|
$171.740
|
$125.000
|
$90.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
480.000
|
$4.500
|
$6.000
|
$32.590
|
$10.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$275,000.000
|
$290,000.000
|
$394,453.210
|
$330,000.000
|
$450,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$6,000.000
|
$7,000.000
|
$9,500.000
|
$19,490.670
|
$1,600.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
372.000
|
$40.000
|
$43.000
|
$46.810
|
$44.000
|
$60.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
495.000
|
$46.000
|
$48.000
|
$55.340
|
$57.940
|
$70.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
975.000
|
$20.000
|
$6.000
|
$31.790
|
$18.000
|
$40.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
78.000
|
$25.000
|
$88.000
|
$52.060
|
$42.000
|
$67.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
78.000
|
$10.000
|
$8.000
|
$21.600
|
$18.750
|
$28.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,710.000
|
$4.000
|
$3.200
|
$4.320
|
$3.600
|
$6.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,710.000
|
$0.500
|
$0.300
|
$1.080
|
$0.500
|
$1.400
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
100.000
|
$7.000
|
$11.500
|
$4.320
|
$8.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
100.000
|
$2.000
|
$1.150
|
$1.080
|
$2.000
|
$1.400
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
108.000
|
$50.000
|
$73.000
|
$76.150
|
$57.000
|
$97.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
622.000
|
$85.000
|
$100.000
|
$50.600
|
$238.550
|
$115.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
94.000
|
$115.000
|
$178.000
|
$126.370
|
$112.420
|
$175.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
954.000
|
$65.000
|
$90.000
|
$50.600
|
$187.100
|
$91.000
|
|
|
TURNOUTS (ACP)
|
SY
|
86.000
|
$150.000
|
$200.000
|
$101.200
|
$308.600
|
$120.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
480.000
|
$23.000
|
$3.500
|
$54.010
|
$32.000
|
$19.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
4.000
|
$350.000
|
$350.000
|
$372.640
|
$435.000
|
$430.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$950.000
|
$800.000
|
$664.270
|
$1,168.750
|
$770.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$650.000
|
$775.000
|
$775.520
|
$1,085.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$800.000
|
$850.000
|
$856.530
|
$1,200.000
|
$992.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
8.000
|
$115.000
|
$35.000
|
$162.020
|
$125.000
|
$190.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
24.000
|
$85.000
|
$90.000
|
$77.770
|
$115.000
|
$90.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
14.000
|
$25.000
|
$35.000
|
$16.200
|
$10.000
|
$19.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
36,100.000
|
$0.850
|
$0.500
|
$0.460
|
$0.430
|
$0.900
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
36,100.000
|
$0.850
|
$0.500
|
$0.460
|
$0.430
|
$0.900
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
42.000
|
$18.000
|
$17.000
|
$16.200
|
$15.000
|
$8.500
|
|
|
PAVEMENT SEALER 6"
|
LF
|
28,556.000
|
$0.400
|
$0.310
|
$0.290
|
$0.270
|
$0.400
|
|
|
PAVEMENT SEALER 24"
|
LF
|
42.000
|
$11.000
|
$5.250
|
$4.860
|
$4.500
|
$4.600
|
|
|
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
|
LF
|
17,561.000
|
$1.000
|
$1.400
|
$1.190
|
$1.100
|
$1.200
|
|
|
REF PROF PAV MRK TY I(Y)6"(BRK)(100MIL)
|
LF
|
2,170.000
|
$1.200
|
$1.400
|
$1.240
|
$1.150
|
$1.400
|
|
|
REF PROF PAV MRK TY I(Y)6"(SLD)(100MIL)
|
LF
|
8,825.000
|
$1.000
|
$1.400
|
$1.190
|
$1.100
|
$1.200
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
175.000
|
$10.000
|
$7.000
|
$5.780
|
$5.350
|
$5.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,785.000
|
$1.000
|
$2.850
|
$1.620
|
$1.500
|
$1.000
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
2,526.000
|
$115.000
|
$125.000
|
$126.100
|
$114.250
|
$146.000
|
|
|
D-GR HMA TY-D PG76-22
|
TON
|
3,612.000
|
$135.000
|
$136.000
|
$141.500
|
$119.000
|
$165.000
|
|
|
TOM-C PG76-22 SAC-B
|
TON
|
1,840.000
|
$165.000
|
$175.000
|
$165.700
|
$152.000
|
$210.000
|
|
|
BONDING COURSE
|
GAL
|
2,955.000
|
$5.000
|
$5.000
|
$4.090
|
$4.250
|
$6.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
6,508.000
|
$5.000
|
$5.000
|
$5.740
|
$4.250
|
$6.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$13,000.000
|
$14,000.000
|
$8,100.830
|
$0.010
|
$12,500.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$225.000
|
$125.000
|
$237.560
|
$0.010
|
$315.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
256.000
|
$80.000
|
$30.000
|
$135.010
|
$0.010
|
$110.000
|
|
|
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
|
EA
|
10.000
|
$1,000.000
|
$2,000.000
|
$3,780.390
|
$1,500.000
|
$2,700.000
|
|
Totals: |
$3,432,985.100
|
$3,853,599.280
|
$4,000,196.188
|
$4,251,237.457
|
$4,951,135.500
|