|
|
PREPARING ROW
|
STA
|
18.000
|
$650.000
|
$626.720
|
$1,378.620
|
$1,000.000
|
$1,560.000
|
$3,093.260
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
12.000
|
$16.110
|
$72.400
|
$37.620
|
$50.000
|
$59.400
|
$10.500
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
262.000
|
$12.200
|
$23.970
|
$37.620
|
$15.000
|
$19.730
|
$10.500
|
|
|
REMOVING STAB BASE AND ASPH PAV (2"-8")
|
SY
|
2,289.000
|
$10.000
|
$9.030
|
$13.680
|
$15.000
|
$10.300
|
$20.880
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
516.000
|
$16.910
|
$26.610
|
$46.980
|
$35.000
|
$50.100
|
$52.260
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
203.000
|
$38.000
|
$34.710
|
$46.980
|
$45.000
|
$42.960
|
$61.550
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,014.000
|
$2.000
|
$3.330
|
$5.540
|
$5.000
|
$4.550
|
$12.650
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
3,014.000
|
$0.140
|
$0.310
|
$0.450
|
$0.500
|
$0.270
|
$2.000
|
|
|
VEGETATIVE WATERING
|
MG
|
51.000
|
$208.360
|
$53.870
|
$27.360
|
$45.000
|
$89.300
|
$26.303
|
|
|
PROOF ROLLING
|
HR
|
4.000
|
$60.020
|
$82.280
|
$152.100
|
$100.000
|
$108.000
|
$104.420
|
|
|
AGGR(TY-PD GR-4 SAC-B)
|
CY
|
117.000
|
$87.210
|
$205.430
|
$204.480
|
$250.000
|
$279.000
|
$169.640
|
|
|
ASPH(AC-15P,AC-20-5TR,AC-20XP,AC10-2TR)
|
GAL
|
4,049.000
|
$3.410
|
$5.840
|
$6.660
|
$6.000
|
$6.700
|
$6.200
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
712.000
|
$1.840
|
$21.300
|
$24.230
|
$12.000
|
$26.800
|
$13.010
|
|
|
CEM STABIL BKFL
|
CY
|
8.000
|
$132.430
|
$193.180
|
$300.000
|
$300.000
|
$331.000
|
$300.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
6.000
|
$114.630
|
$475.310
|
$350.000
|
$125.000
|
$277.000
|
$300.000
|
|
|
RC PIPE (CL IV)(18 IN)
|
LF
|
126.000
|
$95.490
|
$111.330
|
$100.000
|
$155.000
|
$130.000
|
$85.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
$1,680.000
|
$1,827.230
|
$3,000.000
|
$2,500.000
|
$2,930.000
|
$1,400.000
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$410.450
|
$353.200
|
$350.000
|
$1,500.000
|
$302.000
|
$800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
123.000
|
$14.200
|
$19.670
|
$20.000
|
$35.000
|
$25.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$66,755.730
|
$85,120.360
|
$96,172.820
|
$125,000.000
|
$87,000.000
|
$110,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$2,522.140
|
$858.830
|
$8,750.000
|
$7,500.000
|
$9,350.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
140.000
|
$39.140
|
$35.930
|
$40.500
|
$30.000
|
$29.000
|
$50.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
140.000
|
$10.510
|
$8.980
|
$8.600
|
$10.000
|
$8.900
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
111.000
|
$20.750
|
$25.670
|
$21.200
|
$15.000
|
$16.800
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
111.000
|
$6.330
|
$9.170
|
$7.350
|
$2.000
|
$2.250
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,119.000
|
$3.520
|
$3.940
|
$3.500
|
$3.250
|
$3.050
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,119.000
|
$0.520
|
$0.920
|
$0.500
|
$1.250
|
$1.000
|
$2.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
229.000
|
$68.510
|
$137.120
|
$125.000
|
$175.000
|
$105.000
|
$90.000
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
886.000
|
$38.760
|
$59.670
|
$67.500
|
$45.000
|
$45.850
|
$61.470
|
|
|
DRIVEWAYS (ACP) (TYPE 2)
|
SY
|
516.000
|
$38.930
|
$119.180
|
$67.500
|
$115.000
|
$120.000
|
$67.630
|
|
|
RELOCATE EXISTING MAILBOX
|
EA
|
1.000
|
$800.000
|
$431.610
|
$500.000
|
$350.000
|
$559.000
|
$400.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(P)
|
EA
|
1.000
|
$721.430
|
$651.610
|
$1,000.000
|
$600.000
|
$1,120.000
|
$600.000
|
|
|
RELOCATE SM RD SN SUP&AM TY S80
|
EA
|
5.000
|
$626.370
|
$460.320
|
$750.000
|
$700.000
|
$391.000
|
$300.000
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
236.000
|
$2.930
|
$9.230
|
$8.000
|
$8.000
|
$8.900
|
$6.820
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
3,523.000
|
$3.070
|
$1.020
|
$0.900
|
$1.500
|
$1.000
|
$1.310
|
|
|
WK ZN PAV MRK REMOV (W)6"(SLD)
|
LF
|
3,549.000
|
$1.150
|
$1.730
|
$1.550
|
$1.500
|
$1.750
|
$1.310
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
175.000
|
$1.050
|
$2.560
|
$1.800
|
$3.000
|
$2.000
|
$2.620
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
782.000
|
$0.480
|
$1.100
|
$0.880
|
$2.500
|
$0.980
|
$2.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
13,219.000
|
$0.450
|
$1.050
|
$0.950
|
$1.500
|
$1.050
|
$1.310
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
175.000
|
$1.030
|
$2.010
|
$1.300
|
$2.250
|
$1.450
|
$2.100
|
|
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
|
LF
|
58.000
|
$4.340
|
$7.250
|
$5.000
|
$11.000
|
$5.600
|
$10.500
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
30.000
|
$6.110
|
$19.890
|
$15.000
|
$11.000
|
$16.800
|
$10.500
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
8.000
|
$115.560
|
$216.200
|
$185.000
|
$225.000
|
$207.000
|
$210.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$155.820
|
$259.810
|
$190.000
|
$250.000
|
$212.000
|
$236.250
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
20.000
|
$20.000
|
$21.580
|
$15.000
|
$11.000
|
$16.800
|
$10.500
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$500.000
|
$600.810
|
$500.000
|
$500.000
|
$559.000
|
$472.500
|
|
REFL PAV MRK TY II (W) 6" (SLD)
|
LF
|
3,549.000
|
$0.130
|
$0.390
|
$0.330
|
$1.100
|
$0.370
|
$1.050
|
|
REFL PAV MRK TY II (W) 8" (SLD)
|
LF
|
175.000
|
$0.190
|
$1.330
|
$0.680
|
$1.100
|
$0.760
|
$1.050
|
|
REFL PAV MRK TY II (W) 18" (SLD)
|
LF
|
58.000
|
$1.080
|
$5.600
|
$3.500
|
$4.500
|
$3.900
|
$4.200
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
30.000
|
$2.390
|
$8.580
|
$4.720
|
$5.500
|
$5.300
|
$5.250
|
|
REFL PAV MRK TY II (W) (ARROW)
|
EA
|
6.000
|
$81.940
|
$141.240
|
$113.000
|
$85.000
|
$126.000
|
$78.750
|
|
REFL PAV MRK TY II (W) (WORD)
|
EA
|
2.000
|
$110.000
|
$233.410
|
$166.000
|
$85.000
|
$185.000
|
$78.750
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
782.000
|
$0.100
|
$0.560
|
$0.390
|
$1.750
|
$0.440
|
$1.570
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
4,110.000
|
$4.000
|
$0.280
|
$0.230
|
$0.850
|
$0.260
|
$0.780
|
|
REFL PAV MRK TY II (Y) 24" (SLD)
|
LF
|
20.000
|
$2.720
|
$8.710
|
$3.300
|
$5.500
|
$3.700
|
$5.250
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$167.050
|
$380.810
|
$300.000
|
$170.000
|
$335.000
|
$157.500
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
3,549.000
|
$0.620
|
$1.130
|
$1.000
|
$2.250
|
$1.100
|
$2.100
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
782.000
|
$0.500
|
$0.840
|
$0.650
|
$2.250
|
$0.730
|
$2.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
4,110.000
|
$0.440
|
$0.680
|
$0.600
|
$1.700
|
$0.670
|
$1.570
|
|
REFL PAV MRKR TY I-C
|
EA
|
9.000
|
$3.050
|
$22.290
|
$10.000
|
$8.500
|
$11.200
|
$7.870
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
142.000
|
$3.100
|
$11.720
|
$10.000
|
$8.500
|
$11.200
|
$7.870
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
7,640.000
|
$0.810
|
$0.290
|
$0.250
|
$0.550
|
$0.280
|
$0.520
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
204.000
|
$1.370
|
$0.940
|
$0.400
|
$1.100
|
$0.450
|
$1.050
|
|
|
ELIM EXT PAV MRK & MRKS (18")
|
LF
|
42.000
|
$2.250
|
$3.520
|
$1.000
|
$3.250
|
$1.100
|
$3.150
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$19.220
|
$5.590
|
$2.000
|
$5.500
|
$2.250
|
$5.250
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
2.000
|
$122.500
|
$127.810
|
$70.000
|
$110.000
|
$78.210
|
$105.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$60.890
|
$127.810
|
$70.000
|
$110.000
|
$78.210
|
$105.000
|
|
|
ELIM EXT PAV MRK & MRKS (MED NOSE)
|
EA
|
3.000
|
$30.000
|
$363.870
|
$300.000
|
$275.000
|
$335.000
|
$262.500
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
1.000
|
$1,299.000
|
$7,251.610
|
$8,500.000
|
$7,000.000
|
$7,260.000
|
$30,000.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
2,188.000
|
$100.000
|
$106.270
|
$116.100
|
$125.000
|
$156.000
|
$145.131
|
|
|
TACK COAT
|
GAL
|
660.000
|
$7.300
|
$7.080
|
$5.870
|
$6.250
|
$5.000
|
$5.940
|
|
|
D-GR HMA TY-D PG70-22(LEVEL-UP)(EXEMPT)
|
TON
|
966.000
|
$159.000
|
$124.970
|
$143.280
|
$175.000
|
$190.000
|
$165.350
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
22.000
|
$215.040
|
$553.110
|
$1,000.000
|
$300.000
|
$300.000
|
$300.000
|
|
Totals: |
$730,517.780
|
$853,370.480
|
$973,202.720
|
$1,062,146.300
|
$1,091,380.740
|
$1,144,210.211
|