|
|
EXCAVATION (ROADWAY)
|
CY
|
5,000.000
|
$20.000
|
$9.610
|
$15.300
|
$21.000
|
$21.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
33.000
|
$2,000.000
|
$780.690
|
$2,200.000
|
$1,350.000
|
$4,500.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
5,000.000
|
$16.500
|
$13.360
|
$13.500
|
$21.000
|
$21.000
|
|
|
BLADING
|
HR
|
20.000
|
$450.000
|
$173.900
|
$200.000
|
$450.000
|
$300.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$200.000
|
$151.880
|
$115.000
|
$175.000
|
$400.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
5,531.000
|
$25.000
|
$22.160
|
$13.000
|
$27.750
|
$45.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
17,121.000
|
$4.500
|
$5.210
|
$3.750
|
$4.500
|
$5.000
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
35,685.000
|
$4.250
|
$4.750
|
$6.000
|
$4.050
|
$6.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
32,531.000
|
$6.000
|
$5.380
|
$6.000
|
$4.700
|
$5.500
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
722.000
|
$140.000
|
$244.080
|
$240.000
|
$167.000
|
$200.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
3,000.000
|
$50.000
|
$58.410
|
$45.000
|
$46.000
|
$70.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
112.000
|
$350.000
|
$551.250
|
$660.000
|
$577.500
|
$340.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
7.000
|
$600.000
|
$5,344.930
|
$2,415.000
|
$5,500.000
|
$1,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$837,628.680
|
$650,297.830
|
$834,000.000
|
$900,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
6.000
|
$25,000.000
|
$26,559.300
|
$65,000.000
|
$20,000.000
|
$75,000.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
216.000
|
$10.000
|
$18.590
|
$12.500
|
$25.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
216.000
|
$3.000
|
$10.000
|
$5.100
|
$10.000
|
$5.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
679.000
|
$130.000
|
$56.610
|
$25.000
|
$110.000
|
$160.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
34,242.000
|
$0.250
|
$0.160
|
$0.250
|
$0.170
|
$0.450
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
16,280.000
|
$0.300
|
$0.260
|
$0.250
|
$0.280
|
$0.450
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
14.000
|
$8,000.000
|
$8,400.000
|
$10,017.000
|
$8,800.000
|
$6,975.000
|
|
|
CONDT (HDPE) (2")
|
LF
|
3,376.000
|
$12.000
|
$12.600
|
$15.000
|
$13.200
|
$25.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
3,645.000
|
$3.000
|
$2.630
|
$3.150
|
$2.750
|
$2.750
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
7,290.000
|
$3.000
|
$2.890
|
$3.450
|
$3.030
|
$3.350
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
1.000
|
$2,500.000
|
$1,837.500
|
$2,191.000
|
$1,925.000
|
$1,676.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$10,000.000
|
$13,125.000
|
$15,650.000
|
$13,750.000
|
$7,800.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
26.000
|
$1,200.000
|
$862.050
|
$1,190.000
|
$903.100
|
$825.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
15.000
|
$1,200.000
|
$1,025.850
|
$1,350.000
|
$1,074.700
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$1,900.000
|
$1,253.700
|
$1,610.000
|
$1,313.400
|
$1,375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
28.000
|
$275.000
|
$153.910
|
$150.000
|
$150.000
|
$168.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
97,680.000
|
$0.300
|
$0.150
|
$0.200
|
$0.150
|
$0.140
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
97,680.000
|
$0.300
|
$0.150
|
$0.200
|
$0.150
|
$0.140
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
2,444.000
|
$1.750
|
$4.240
|
$0.700
|
$2.280
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
2,444.000
|
$2.650
|
$4.240
|
$0.700
|
$2.280
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
2,444.000
|
$2.100
|
$4.240
|
$0.700
|
$2.280
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
890.000
|
$2.500
|
$1.120
|
$1.350
|
$1.180
|
$1.070
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
1,410.000
|
$2.500
|
$1.120
|
$1.350
|
$1.180
|
$1.070
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,768.000
|
$2.000
|
$1.120
|
$1.350
|
$1.180
|
$1.070
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,710.000
|
$4.500
|
$4.730
|
$5.650
|
$4.950
|
$4.500
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
34,161.000
|
$0.750
|
$0.540
|
$0.650
|
$0.560
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,112.000
|
$1.000
|
$0.540
|
$0.650
|
$0.560
|
$0.510
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
27,269.000
|
$1.750
|
$0.540
|
$0.650
|
$0.560
|
$0.510
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
42.000
|
$30.000
|
$20.210
|
$24.000
|
$21.180
|
$19.250
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
14.000
|
$390.000
|
$262.500
|
$315.000
|
$275.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
9.000
|
$630.000
|
$682.500
|
$820.000
|
$715.000
|
$650.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
8.000
|
$400.000
|
$367.500
|
$440.000
|
$385.000
|
$350.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
925.000
|
$5.500
|
$4.200
|
$5.000
|
$4.400
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
971.000
|
$5.250
|
$4.200
|
$5.000
|
$4.400
|
$4.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
19,775.000
|
$129.570
|
$124.750
|
$105.000
|
$116.000
|
$160.000
|
|
|
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
|
TON
|
9,421.000
|
$160.000
|
$156.100
|
$200.000
|
$157.000
|
$170.000
|
|
|
BONDING COURSE
|
GAL
|
8,564.000
|
$5.000
|
$5.270
|
$6.500
|
$4.500
|
$7.500
|
|
|
CEMENT
|
TON
|
343.000
|
$400.000
|
$300.000
|
$265.000
|
$345.000
|
$250.000
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
937.000
|
$1,300.000
|
$1,037.000
|
$877.000
|
$1,140.700
|
$850.000
|
|
|
FOAMED ASPHALT TREAT (8") (DC)
|
SY
|
85,587.000
|
$10.000
|
$6.000
|
$5.000
|
$9.200
|
$17.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$25,000.000
|
$13,356.030
|
$11,000.000
|
$19,250.000
|
$19,200.000
|
|
|
TMA (STATIONARY)
|
DAY
|
240.000
|
$95.000
|
$391.020
|
$195.000
|
$137.500
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
105.000
|
$300.000
|
$460.270
|
$655.000
|
$935.000
|
$450.000
|
|
Totals: |
$9,249,915.430
|
$8,225,180.160
|
$8,425,329.100
|
$8,728,599.270
|
$10,980,012.230
|