|
|
REMOVING CONC (MEDIANS)
|
SY
|
150.000
|
$9.000
|
$31.000
|
$22.000
|
$37.640
|
|
|
REMOVING STAB BASE AND ASPH PAV(8")
|
SY
|
45,376.000
|
$3.150
|
$3.750
|
$3.300
|
$5.070
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
40,379.000
|
$9.400
|
$6.700
|
$9.500
|
$11.330
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
17,211.000
|
$7.480
|
$7.400
|
$8.500
|
$6.410
|
|
|
BLADING
|
HR
|
40.000
|
$142.150
|
$350.000
|
$200.000
|
$268.080
|
|
|
PROOF ROLLING
|
HR
|
100.000
|
$125.000
|
$125.000
|
$150.000
|
$207.770
|
|
|
FL BS (CMP IN PLC)(TY A GR 4) (8")
|
SY
|
90,752.000
|
$14.640
|
$9.000
|
$10.500
|
$12.370
|
|
|
PRIME COAT (AE-P)
|
GAL
|
31,138.000
|
$3.990
|
$4.250
|
$5.000
|
$4.990
|
|
|
PRIME COAT (MC-30)
|
GAL
|
45,376.000
|
$4.340
|
$5.100
|
$4.350
|
$5.760
|
|
|
FOG SEAL (CSS-1H)
|
GAL
|
51,571.000
|
$3.280
|
$3.500
|
$3.500
|
$3.310
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
164,476.000
|
$3.070
|
$3.950
|
$3.450
|
$4.960
|
|
|
AGGR(TY-B GR-4 SAC-B)
|
CY
|
2,117.000
|
$67.770
|
$100.000
|
$122.000
|
$142.560
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
4,233.000
|
$99.280
|
$92.000
|
$123.000
|
$182.480
|
|
|
ASPH (AC-15P, CHFRS2P OR CRS2P)
|
GAL
|
58,486.000
|
$3.000
|
$3.900
|
$4.200
|
$4.520
|
|
|
TOM-C (AGGREGATE) SAC-A
|
TON
|
12,900.000
|
$102.960
|
$47.250
|
$75.750
|
$90.270
|
|
|
TOM (ASPHALT) PG 70-22
|
TON
|
1,025.000
|
$403.430
|
$817.000
|
$955.000
|
$1,008.400
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
|
SY
|
5,000.000
|
$13.190
|
$35.600
|
$24.000
|
$38.850
|
|
|
CURB (TYPE II - A)
|
LF
|
92.000
|
$19.000
|
$89.250
|
$90.000
|
$97.590
|
|
|
CEM STABIL BKFL
|
CY
|
6.000
|
$105.390
|
$262.500
|
$425.000
|
$287.020
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
40.000
|
$210.000
|
$315.000
|
$350.000
|
$344.420
|
|
|
CL K CONC (MISC)
|
CY
|
20.000
|
$800.000
|
$787.500
|
$3,000.000
|
$861.050
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2.500
|
$507.880
|
$630.000
|
$2,500.000
|
$688.840
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,125,236.730
|
$920,000.000
|
$1,665,000.000
|
$2,282,725.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
14.000
|
$16,000.000
|
$8,600.000
|
$25,550.000
|
$23,123.630
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
480.000
|
$8.000
|
$21.000
|
$10.000
|
$8.500
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
480.000
|
$1.750
|
$7.500
|
$2.000
|
$2.300
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,496.000
|
$81.030
|
$105.000
|
$95.000
|
$114.810
|
|
|
DRIVEWAYS (ACP)
|
SY
|
690.000
|
$63.150
|
$100.000
|
$71.000
|
$125.740
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
93,328.000
|
$0.120
|
$0.150
|
$0.100
|
$0.080
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
35,849.000
|
$0.170
|
$0.220
|
$0.150
|
$0.080
|
|
|
IN RD IL (TY SA) 50T-10 (400W EQ) LED
|
EA
|
5.000
|
$4,214.760
|
$7,875.000
|
$8,000.000
|
$8,610.550
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
857.000
|
$11.440
|
$12.600
|
$13.350
|
$13.780
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
194.000
|
$23.730
|
$47.250
|
$50.000
|
$51.660
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
1,150.000
|
$1.740
|
$2.360
|
$2.500
|
$2.580
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
2,300.000
|
$2.230
|
$2.630
|
$2.750
|
$2.870
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
5.000
|
$1,063.960
|
$1,575.000
|
$1,670.000
|
$1,722.110
|
|
|
ELC SRV TY A 240/480 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,396.980
|
$9,450.000
|
$10,000.000
|
$10,332.660
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
63.000
|
$559.830
|
$805.350
|
$800.000
|
$861.050
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
9.000
|
$706.650
|
$908.250
|
$900.000
|
$975.860
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$950.000
|
$1,100.400
|
$1,225.000
|
$1,262.880
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
77.000
|
$88.900
|
$76.000
|
$150.000
|
$114.810
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
383,048.000
|
$0.140
|
$0.120
|
$0.150
|
$0.130
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
383,048.000
|
$0.140
|
$0.120
|
$0.150
|
$0.130
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
9,576.000
|
$1.380
|
$1.500
|
$1.000
|
$2.320
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
9,576.000
|
$2.210
|
$1.500
|
$1.500
|
$2.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
9,576.000
|
$1.750
|
$1.500
|
$1.500
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
11,725.000
|
$0.860
|
$1.050
|
$1.050
|
$1.150
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
2,438.000
|
$3.000
|
$4.200
|
$4.050
|
$4.590
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
118,178.750
|
$0.850
|
$0.580
|
$0.550
|
$0.630
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
11,220.000
|
$0.850
|
$0.610
|
$0.600
|
$0.670
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
28,755.000
|
$0.850
|
$0.610
|
$0.600
|
$0.670
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
62.000
|
$14.910
|
$26.250
|
$30.000
|
$28.700
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
12.000
|
$194.290
|
$315.000
|
$350.000
|
$344.420
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$613.130
|
$866.250
|
$900.000
|
$947.160
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
12.000
|
$231.280
|
$420.000
|
$420.000
|
$459.230
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
66,519.000
|
$81.600
|
$84.500
|
$81.000
|
$129.570
|
|
|
TACK COAT
|
GAL
|
48,386.000
|
$3.550
|
$3.000
|
$3.500
|
$3.500
|
|
|
BONDING COURSE
|
GAL
|
24,193.000
|
$2.910
|
$2.200
|
$3.500
|
$3.500
|
|
|
CEMENT
|
TON
|
618.000
|
$188.850
|
$260.000
|
$248.000
|
$262.560
|
|
|
ASPHALT BINDER (PG 64-22)
|
TON
|
1,702.000
|
$490.910
|
$740.000
|
$790.000
|
$880.980
|
|
|
FOAMED ASPHALT TREAT (8") (DC)
|
SY
|
155,664.000
|
$3.520
|
$4.800
|
$5.000
|
$3.220
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$17,371.000
|
$8,250.000
|
$7,500.000
|
$25,482.610
|
|
|
TMA (STATIONARY)
|
DAY
|
279.000
|
$300.000
|
$75.000
|
$180.000
|
$295.710
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
604.000
|
$69.270
|
$20.000
|
$55.000
|
$94.960
|
|
Totals: |
$14,859,513.918
|
$14,858,747.275
|
$16,642,778.762
|
$21,698,936.362
|