|
|
SALV,HAUL & STKPL RCL APH PV (2" TO 3")
|
SY
|
48,365.877
|
$1.000
|
$2.700
|
$3.000
|
$2.550
|
|
|
D-GR HMA(SQ) TY-C PG64-22 (LEVEL-UP)
|
TON
|
1,000.000
|
$95.000
|
$100.000
|
$80.000
|
$117.000
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
5,562.085
|
$97.000
|
$97.000
|
$97.000
|
$114.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
666.660
|
$45.000
|
$49.000
|
$76.590
|
$65.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
666.660
|
$28.000
|
$32.000
|
$39.780
|
$38.000
|
|
|
FLEX PAVEMENT STRUCTURE REPAIR (2.5")
|
SY
|
666.660
|
$23.000
|
$25.500
|
$35.300
|
$30.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$100,301.410
|
$85,000.000
|
$127,000.000
|
$95,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
3.000
|
$9,000.000
|
$5,000.000
|
$22,000.000
|
$20,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
100.000
|
$3.000
|
$2.750
|
$15.900
|
$8.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
100.000
|
$5.000
|
$0.550
|
$11.870
|
$4.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
50.000
|
$625.000
|
$447.360
|
$425.000
|
$465.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
40.000
|
$700.000
|
$510.520
|
$485.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
4.000
|
$900.000
|
$578.940
|
$550.000
|
$635.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
18.000
|
$1,100.000
|
$631.570
|
$600.000
|
$705.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
19.000
|
$1,300.000
|
$736.830
|
$700.000
|
$830.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
131.000
|
$150.000
|
$68.420
|
$65.000
|
$90.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
35.000
|
$52.000
|
$57.890
|
$55.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)SRF
|
EA
|
3.000
|
$45.000
|
$78.950
|
$75.000
|
$160.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
12.000
|
$55.000
|
$57.890
|
$55.000
|
$130.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
45.000
|
$60.000
|
$57.890
|
$55.000
|
$130.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
5.000
|
$45.000
|
$78.950
|
$75.000
|
$130.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
2,610.680
|
$0.600
|
$0.370
|
$0.350
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
200.750
|
$0.350
|
$1.050
|
$1.000
|
$1.040
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(BRK)
|
LF
|
78.000
|
$1.000
|
$1.050
|
$1.000
|
$1.040
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
4,934.570
|
$0.400
|
$0.630
|
$0.600
|
$0.620
|
|
|
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
|
LF
|
1,338.680
|
$1.250
|
$1.890
|
$1.800
|
$1.870
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
225.910
|
$4.250
|
$2.950
|
$2.800
|
$2.920
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ARROW)
|
EA
|
11.000
|
$53.000
|
$52.630
|
$50.000
|
$52.070
|
|
|
WK ZN PAV MRK NON-REMOV (W)(DBL ARW)
|
EA
|
10.000
|
$85.000
|
$105.260
|
$100.000
|
$104.140
|
|
|
WK ZN PAV MRK NON-REMOV (W)(TPL ARW)
|
EA
|
22.000
|
$110.000
|
$157.890
|
$150.000
|
$156.210
|
|
|
WK ZN PAV MRK NON-REMOV (W)(U-L ARR)
|
EA
|
7.000
|
$75.000
|
$157.890
|
$150.000
|
$156.210
|
|
|
WK ZN PAV MRK NON-REMOV(W)(WORD)
|
EA
|
36.000
|
$115.000
|
$52.630
|
$50.000
|
$52.070
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
910.240
|
$0.300
|
$0.370
|
$0.350
|
$0.360
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
15,358.760
|
$0.250
|
$0.370
|
$0.350
|
$0.360
|
|
|
WK ZN PAV MRK REMOV (W)12"(LNDP)
|
LF
|
75.000
|
$20.000
|
$5.260
|
$5.000
|
$5.210
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
1,178.000
|
$1.100
|
$0.900
|
$1.500
|
$2.310
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
491.000
|
$1.250
|
$0.900
|
$1.500
|
$2.320
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
200.750
|
$0.800
|
$1.050
|
$1.000
|
$2.000
|
|
REFL PAV MRK TY I (W)8"(BRK)(100MIL)
|
LF
|
78.000
|
$2.000
|
$1.050
|
$1.000
|
$1.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
4,934.570
|
$1.200
|
$1.050
|
$1.000
|
$1.040
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
75.000
|
$3.250
|
$3.680
|
$3.500
|
$3.640
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,338.680
|
$3.500
|
$3.680
|
$3.500
|
$3.640
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
225.910
|
$6.000
|
$5.790
|
$5.500
|
$5.730
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
11.000
|
$150.000
|
$142.100
|
$135.000
|
$140.590
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
|
EA
|
10.000
|
$220.000
|
$210.520
|
$200.000
|
$208.280
|
|
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
|
EA
|
22.000
|
$170.000
|
$299.990
|
$285.000
|
$296.790
|
|
REFL PAV MRK TY I(W)(U-LT ARW)(100 MIL)
|
EA
|
7.000
|
$225.000
|
$342.100
|
$325.000
|
$338.450
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
36.000
|
$180.000
|
$173.680
|
$165.000
|
$171.830
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,331.490
|
$0.400
|
$0.530
|
$0.500
|
$0.520
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
17,054.580
|
$0.320
|
$0.460
|
$0.440
|
$0.460
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
910.240
|
$0.500
|
$0.530
|
$0.500
|
$0.520
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
15,358.760
|
$0.450
|
$0.460
|
$0.440
|
$0.460
|
|
REFL PAV MRKR TY I-C
|
EA
|
347.000
|
$3.750
|
$4.210
|
$4.000
|
$4.170
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
123.000
|
$5.000
|
$4.210
|
$4.000
|
$4.170
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
63.000
|
$5.250
|
$4.210
|
$4.000
|
$4.170
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
806.870
|
$0.750
|
$1.050
|
$1.000
|
$1.040
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
1,711.500
|
$1.100
|
$0.530
|
$0.500
|
$0.520
|
|
|
ELIM EXT PAV MRK & MRKS (TPL ARROW)
|
EA
|
4.000
|
$100.000
|
$210.520
|
$200.000
|
$208.280
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
4.000
|
$100.000
|
$210.520
|
$200.000
|
$208.280
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
425.000
|
$0.250
|
$1.050
|
$1.000
|
$1.040
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
54.000
|
$1.000
|
$1.050
|
$1.000
|
$1.040
|
|
|
PAV SURF PREP FOR MRK (DBL ARROW)
|
EA
|
4.000
|
$85.000
|
$52.630
|
$50.000
|
$52.070
|
|
|
PAV SURF PREP FOR MRK (TPL ARROW)
|
EA
|
2.000
|
$120.000
|
$52.630
|
$50.000
|
$52.070
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
2.000
|
$50.000
|
$52.630
|
$50.000
|
$52.070
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
65.000
|
$225.000
|
$115.000
|
$150.000
|
$297.440
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$1,500.000
|
$23,000.000
|
$20,000.000
|
$15,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
100.000
|
$75.000
|
$122.000
|
$100.000
|
$120.000
|
|
Totals: |
$1,103,315.520
|
$1,170,226.850
|
$1,277,382.310
|
$1,359,271.336
|