REMOVING CONC (PAV)
|
SY
|
180.000
|
$20.000
|
$21.000
|
$43.000
|
$25.000
|
$21.000
|
$40.000
|
$60.630
|
$30.000
|
$33.760
|
|
|
REMOVING CONC (RIPRAP)
|
CY
|
4.000
|
$250.000
|
$302.000
|
$825.000
|
$550.000
|
$315.000
|
$200.000
|
$1,127.640
|
$100.000
|
$158.750
|
|
|
REMOVING STAB BASE AND ASPH PAV (4")
|
SY
|
200.000
|
$10.000
|
$51.000
|
$17.000
|
$15.000
|
$21.000
|
$16.000
|
$22.510
|
$15.000
|
$23.500
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
32.000
|
$50.000
|
$50.000
|
$200.000
|
$45.000
|
$105.000
|
$50.000
|
$576.610
|
$50.000
|
$35.730
|
|
|
BLOCK SODDING
|
SY
|
7,098.000
|
$4.000
|
$2.600
|
$3.350
|
$3.000
|
$3.000
|
$3.000
|
$3.410
|
$4.000
|
$4.260
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
3,550.000
|
$1.000
|
$0.540
|
$0.110
|
$0.600
|
$0.100
|
$0.550
|
$0.100
|
$0.600
|
$0.610
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
3,550.000
|
$1.000
|
$0.550
|
$0.110
|
$0.600
|
$0.100
|
$0.560
|
$0.100
|
$0.600
|
$0.610
|
|
|
VEGETATIVE WATERING
|
MG
|
498.000
|
$12.000
|
$19.730
|
$30.000
|
$20.000
|
$25.000
|
$29.000
|
$20.980
|
$60.000
|
$188.240
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
64.000
|
$120.000
|
$220.000
|
$230.000
|
$225.000
|
$210.000
|
$210.000
|
$233.140
|
$250.000
|
$241.760
|
|
|
CONC PVMT (CONT REINF - CRCP) (11")
|
SY
|
254.000
|
$80.000
|
$161.000
|
$150.000
|
$125.000
|
$105.000
|
$160.000
|
$182.640
|
$150.000
|
$135.730
|
|
|
FLOWABLE BACKFILL
|
CY
|
2.000
|
$200.000
|
$600.000
|
$710.000
|
$350.000
|
$840.000
|
$150.000
|
$1,299.180
|
$250.000
|
$698.500
|
|
|
CL C CONC (VEH DEFL WALL)(HPC)
|
CY
|
97.000
|
$700.000
|
$534.000
|
$600.000
|
$850.000
|
$840.000
|
$850.000
|
$703.310
|
$650.000
|
$871.490
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
45,334.000
|
$18.000
|
$18.150
|
$23.900
|
$23.750
|
$20.550
|
$21.000
|
$11.230
|
$28.000
|
$33.670
|
|
|
APPROACH SLAB (HPC)
|
CY
|
92.500
|
$450.000
|
$500.000
|
$600.000
|
$450.000
|
$420.000
|
$734.000
|
$416.760
|
$650.000
|
$776.860
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
5,963.000
|
$3.000
|
$3.270
|
$3.350
|
$4.000
|
$4.200
|
$3.600
|
$4.460
|
$4.000
|
$5.120
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
268.000
|
$125.000
|
$82.000
|
$48.000
|
$125.000
|
$68.250
|
$181.000
|
$82.470
|
$80.000
|
$104.140
|
|
|
CONC STR REPAIR (VERTICAL & OVERHEAD)
|
SF
|
601.000
|
$200.000
|
$141.000
|
$60.000
|
$130.000
|
$193.200
|
$181.000
|
$86.210
|
$200.000
|
$179.070
|
|
|
CONC STR REPR(REMOV AND REPL BACKWALL)
|
CY
|
8.000
|
$6,000.000
|
$2,500.000
|
$3,800.000
|
$6,500.000
|
$2,100.000
|
$2,400.000
|
$1,031.230
|
$2,500.000
|
$2,540.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
4.000
|
$500.000
|
$800.000
|
$1,500.000
|
$800.000
|
$1,365.000
|
$600.000
|
$932.460
|
$650.000
|
$946.150
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
103.000
|
$500.000
|
$450.000
|
$790.000
|
$400.000
|
$630.000
|
$611.000
|
$480.150
|
$500.000
|
$621.110
|
|
|
MULTI-LAYER POLYMER OVERLAY
|
SY
|
5,177.000
|
$40.000
|
$42.200
|
$30.000
|
$28.000
|
$34.130
|
$30.000
|
$24.510
|
$40.000
|
$46.370
|
|
|
RAIL (TY T551)(HPC)
|
LF
|
2,313.000
|
$60.000
|
$100.000
|
$65.000
|
$50.000
|
$55.000
|
$72.000
|
$57.660
|
$40.000
|
$61.260
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
383.000
|
$90.000
|
$93.000
|
$95.000
|
$120.000
|
$63.000
|
$120.000
|
$73.400
|
$100.000
|
$118.060
|
|
|
SHOT BLASTING
|
SY
|
5,177.000
|
$7.000
|
$3.100
|
$1.850
|
$5.000
|
$4.730
|
$2.800
|
$17.950
|
$5.350
|
$2.300
|
|
|
REMOV STR (BRIDGE SLAB)
|
EA
|
1.000
|
$348,600.000
|
$386,000.000
|
$360,000.000
|
$328,000.000
|
$469,000.000
|
$600,000.000
|
$1,453,801.390
|
$650,000.000
|
$318,770.000
|
|
|
REMOV STR (APPROACH SLAB)
|
EA
|
2.000
|
$8,000.000
|
$2,995.000
|
$6,500.000
|
$2,700.000
|
$3,150.000
|
$10,000.000
|
$3,560.490
|
$15,000.000
|
$3,238.500
|
|
|
REMOVE STR (RAIL)
|
LF
|
46.000
|
$50.000
|
$170.000
|
$60.000
|
$125.000
|
$84.000
|
$120.000
|
$42.150
|
$80.000
|
$140.840
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$273,735.000
|
$314,000.000
|
$300,000.000
|
$377,000.000
|
$340,000.000
|
$222,000.000
|
$379,675.990
|
$400,000.000
|
$470,535.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
11.000
|
$4,000.000
|
$1,685.000
|
$6,000.000
|
$3,000.000
|
$13,650.000
|
$10,000.000
|
$11,298.850
|
$3,000.000
|
$4,820.240
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
40.000
|
$30.000
|
$29.260
|
$24.000
|
$45.000
|
$21.000
|
$32.000
|
$23.610
|
$45.000
|
$50.800
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$10.000
|
$20.880
|
$10.000
|
$25.000
|
$9.450
|
$23.000
|
$9.180
|
$15.000
|
$19.050
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,370.000
|
$2.500
|
$1.780
|
$1.750
|
$2.000
|
$1.520
|
$2.000
|
$1.570
|
$2.130
|
$2.290
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,370.000
|
$1.000
|
$1.090
|
$0.750
|
$0.600
|
$0.160
|
$1.200
|
$0.520
|
$0.800
|
$0.640
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
250.000
|
$5.000
|
$4.290
|
$4.550
|
$5.000
|
$4.150
|
$4.700
|
$4.460
|
$5.000
|
$5.080
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
250.000
|
$1.000
|
$0.760
|
$0.800
|
$1.250
|
$1.050
|
$1.000
|
$0.790
|
$2.000
|
$2.230
|
|
|
CONSTRUCTING DETOURS
|
SY
|
3,421.000
|
$60.000
|
$102.000
|
$90.000
|
$90.000
|
$55.000
|
$95.000
|
$71.320
|
$80.000
|
$157.420
|
|
|
PORT CTB (DES SOURCE)(F-SHAPE)(TY 1)
|
LF
|
3,270.000
|
$14.000
|
$11.000
|
$15.000
|
$16.000
|
$21.000
|
$16.000
|
$7.220
|
$20.000
|
$16.540
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
2,730.000
|
$10.000
|
$6.000
|
$11.000
|
$15.000
|
$2.100
|
$15.500
|
$4.190
|
$5.000
|
$16.080
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
3,270.000
|
$8.000
|
$7.000
|
$5.000
|
$5.000
|
$6.300
|
$14.000
|
$6.930
|
$8.000
|
$16.540
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,800.500
|
$20.000
|
$19.000
|
$17.250
|
$25.000
|
$23.360
|
$20.900
|
$23.340
|
$22.000
|
$24.130
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
6.000
|
$2,000.000
|
$1,250.000
|
$1,400.000
|
$1,500.000
|
$1,838.370
|
$1,375.000
|
$1,521.210
|
$1,500.000
|
$1,587.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
4.000
|
$1,100.000
|
$1,050.000
|
$950.000
|
$1,200.000
|
$1,296.750
|
$1,155.000
|
$1,295.650
|
$850.000
|
$1,333.500
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
4.000
|
$850.000
|
$500.000
|
$540.000
|
$600.000
|
$892.500
|
$550.000
|
$891.750
|
$650.000
|
$635.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,800.000
|
$4.000
|
$2.250
|
$2.050
|
$3.000
|
$4.200
|
$2.500
|
$4.200
|
$3.000
|
$2.860
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$250.000
|
$200.000
|
$210.000
|
$225.000
|
$131.250
|
$220.000
|
$131.140
|
$300.000
|
$254.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
6.000
|
$3,000.000
|
$2,250.000
|
$2,200.000
|
$2,500.000
|
$2,205.000
|
$2,475.000
|
$2,203.130
|
$2,500.000
|
$2,857.500
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$500.000
|
$200.000
|
$210.000
|
$200.000
|
$262.500
|
$220.000
|
$262.280
|
$350.000
|
$254.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
3.000
|
$3,000.000
|
$2,500.000
|
$2,600.000
|
$3,000.000
|
$525.000
|
$2,750.000
|
$1,538.480
|
$3,500.000
|
$3,175.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
3.000
|
$900.000
|
$1,000.000
|
$1,250.000
|
$1,200.000
|
$525.000
|
$1,100.000
|
$1,078.540
|
$1,500.000
|
$1,270.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
3.000
|
$15,000.000
|
$9,475.000
|
$11,500.000
|
$10,000.000
|
$8,400.000
|
$10,423.000
|
$9,058.610
|
$10,000.000
|
$12,033.250
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$400.000
|
$396.830
|
$520.000
|
$600.000
|
$347.490
|
$650.000
|
$629.470
|
$600.000
|
$317.500
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
23.000
|
$25.000
|
$15.000
|
$25.000
|
$20.000
|
$27.300
|
$16.500
|
$27.280
|
$10.000
|
$19.050
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
|
EA
|
23.000
|
$25.000
|
$18.000
|
$25.000
|
$20.000
|
$27.300
|
$19.800
|
$27.280
|
$10.000
|
$22.860
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
16.000
|
$38.000
|
$20.000
|
$28.000
|
$400.000
|
$44.100
|
$22.000
|
$44.060
|
$25.000
|
$25.400
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
6.000
|
$32.000
|
$25.000
|
$28.000
|
$30.000
|
$44.100
|
$27.500
|
$44.060
|
$25.000
|
$31.750
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
6.000
|
$30.000
|
$20.000
|
$28.000
|
$25.000
|
$44.100
|
$22.000
|
$44.060
|
$25.000
|
$25.400
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-C-R
|
EA
|
11.000
|
$5.000
|
$2.700
|
$2.800
|
$6.000
|
$2.840
|
$5.500
|
$2.900
|
$3.100
|
$6.350
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
10,065.000
|
$0.700
|
$0.600
|
$0.600
|
$1.100
|
$0.630
|
$1.100
|
$0.650
|
$0.700
|
$1.270
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
220.000
|
$1.250
|
$1.200
|
$1.250
|
$1.500
|
$1.260
|
$1.430
|
$1.290
|
$1.500
|
$1.660
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
13,465.000
|
$0.700
|
$0.600
|
$0.600
|
$1.100
|
$0.630
|
$1.100
|
$0.650
|
$0.700
|
$1.270
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,907.000
|
$2.000
|
$0.770
|
$0.800
|
$1.250
|
$0.810
|
$1.010
|
$0.830
|
$0.900
|
$1.170
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
55.000
|
$5.900
|
$2.900
|
$3.000
|
$5.000
|
$3.050
|
$4.400
|
$3.120
|
$4.000
|
$5.080
|
|
|
PAVEMENT SEALER 4"
|
LF
|
5,600.000
|
$0.200
|
$0.360
|
$0.350
|
$0.200
|
$0.380
|
$0.170
|
$0.390
|
$0.450
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
1,730.000
|
$1.000
|
$0.570
|
$0.600
|
$1.250
|
$0.600
|
$1.100
|
$0.610
|
$0.700
|
$1.270
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,725.000
|
$1.000
|
$0.510
|
$0.550
|
$1.000
|
$0.540
|
$0.830
|
$0.550
|
$0.600
|
$0.970
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,602.000
|
$1.000
|
$0.510
|
$0.550
|
$1.000
|
$0.540
|
$0.830
|
$0.550
|
$0.600
|
$0.970
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
199.000
|
$6.000
|
$3.100
|
$3.200
|
$5.000
|
$3.260
|
$4.400
|
$3.340
|
$4.200
|
$5.080
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,170.000
|
$0.400
|
$0.430
|
$0.450
|
$0.350
|
$0.450
|
$0.330
|
$0.460
|
$0.600
|
$0.390
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
100.000
|
$0.600
|
$0.800
|
$0.800
|
$1.200
|
$0.840
|
$1.100
|
$0.860
|
$1.000
|
$1.270
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
20.000
|
$1.300
|
$1.200
|
$1.250
|
$2.500
|
$1.260
|
$2.200
|
$1.290
|
$2.000
|
$2.540
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
15,815.000
|
$0.150
|
$0.200
|
$0.200
|
$0.070
|
$0.210
|
$0.060
|
$0.220
|
$0.250
|
$0.080
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
1,907.000
|
$0.200
|
$0.270
|
$0.300
|
$0.150
|
$0.280
|
$0.110
|
$0.290
|
$0.400
|
$0.140
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
55.000
|
$0.500
|
$0.910
|
$0.950
|
$1.000
|
$0.960
|
$0.830
|
$0.980
|
$1.200
|
$0.980
|
|
|
CONCRETE RAIL REPLACEMENT (TYPE 501)
|
LF
|
72.000
|
$200.000
|
$540.000
|
$450.000
|
$1,000.000
|
$1,065.750
|
$300.000
|
$266.050
|
$1,200.000
|
$127.000
|
|
|
BRIDGE JOINT REPLACEMENT (SEJ)
|
LF
|
383.000
|
$400.000
|
$490.000
|
$275.000
|
$650.000
|
$819.000
|
$565.000
|
$82.740
|
$900.000
|
$758.970
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
100.000
|
$100.000
|
$45.000
|
$25.000
|
$100.000
|
$189.000
|
$125.000
|
$97.250
|
$120.000
|
$222.250
|
|
MULTIPOLYMER PAV MRK (W)(4")(SLD)
|
LF
|
1,235.000
|
$1.000
|
$2.000
|
$2.050
|
$5.000
|
$2.100
|
$4.400
|
$2.150
|
$2.500
|
$5.080
|
|
MULTIPOLYMER PAV MRK (W)(4")(BRK)
|
LF
|
310.000
|
$1.000
|
$2.000
|
$2.050
|
$5.000
|
$2.100
|
$4.400
|
$2.150
|
$2.500
|
$5.080
|
|
MULTIPOLYMER PAV MRK (Y)(4")(SLD)
|
LF
|
1,213.000
|
$1.000
|
$2.000
|
$2.050
|
$5.000
|
$2.100
|
$4.400
|
$2.150
|
$2.500
|
$5.080
|
|
Totals: |
$3,061,036.650
|
$3,268,105.610
|
$3,297,091.325
|
$3,565,001.350
|
$3,565,101.290
|
$3,717,261.050
|
$3,796,759.930
|
$4,248,037.000
|
$4,652,363.135
|