PREPARING ROW
|
STA
|
111.000
|
$2,500.000
|
$700.000
|
$2,000.000
|
$900.000
|
$4,050.000
|
$1,931.910
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
200.000
|
$25.000
|
$20.000
|
$25.000
|
$23.700
|
$20.000
|
$29.890
|
|
|
REMOVING UNTREATED BASE (8")
|
SY
|
1,041.000
|
$15.000
|
$8.000
|
$9.000
|
$22.650
|
$1.000
|
$3.420
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
17,492.000
|
$15.000
|
$11.000
|
$18.000
|
$15.000
|
$18.000
|
$12.710
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY A)
|
CY
|
5,931.000
|
$15.000
|
$28.000
|
$13.000
|
$16.000
|
$31.500
|
$18.610
|
|
|
BACKFILL (TY A OR B)
|
STA
|
111.000
|
$160.000
|
$200.000
|
$400.000
|
$350.000
|
$126.000
|
$395.090
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
84,663.000
|
$1.500
|
$0.720
|
$1.100
|
$1.000
|
$1.000
|
$2.910
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
42,337.000
|
$0.150
|
$0.080
|
$0.120
|
$0.090
|
$0.100
|
$0.120
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
42,337.000
|
$0.150
|
$0.080
|
$0.120
|
$0.090
|
$0.100
|
$0.120
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
84,674.000
|
$0.750
|
$0.230
|
$0.370
|
$0.250
|
$0.300
|
$0.410
|
|
|
VEGETATIVE WATERING
|
MG
|
2,962.000
|
$25.000
|
$28.220
|
$20.000
|
$36.000
|
$31.360
|
$24.230
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(FNAL POS)
|
CY
|
3,259.000
|
$55.000
|
$80.000
|
$62.000
|
$73.000
|
$73.500
|
$81.050
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
787.000
|
$125.000
|
$170.000
|
$185.000
|
$220.000
|
$189.000
|
$243.210
|
|
|
LIME TRT (EXIST MATL)(18")
|
SY
|
19,591.000
|
$5.000
|
$12.000
|
$9.000
|
$14.000
|
$12.600
|
$10.600
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
10,854.000
|
$2.250
|
$4.000
|
$4.500
|
$4.000
|
$4.010
|
$4.630
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
5,900.000
|
$78.000
|
$73.000
|
$95.000
|
$77.000
|
$73.830
|
$171.400
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG70-28
|
TON
|
4,669.000
|
$95.000
|
$95.000
|
$105.000
|
$101.000
|
$104.860
|
$197.720
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
1,087.000
|
$70.000
|
$51.000
|
$46.000
|
$56.490
|
$41.330
|
$89.440
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
81.000
|
$60.000
|
$80.000
|
$45.000
|
$86.540
|
$83.460
|
$70.220
|
|
|
PLANE ASPH CONC PAV (2.5" TO 4.5")
|
SY
|
333.000
|
$10.000
|
$20.000
|
$6.000
|
$23.600
|
$11.770
|
$11.730
|
|
|
PLANE ASPH CONC PAV (0"-2.75")
|
SY
|
1,887.000
|
$10.000
|
$5.000
|
$3.000
|
$13.410
|
$10.700
|
$5.170
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
125.000
|
$160.000
|
$240.000
|
$230.000
|
$99.000
|
$125.000
|
$161.520
|
|
|
FLOWABLE BACKFILL
|
CY
|
500.000
|
$140.000
|
$175.000
|
$170.000
|
$214.570
|
$190.000
|
$282.360
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
115.000
|
$32.000
|
$18.000
|
$17.000
|
$21.460
|
$15.000
|
$4.880
|
|
|
RIPRAP (STONE COMMON)(DRY)(6 IN)
|
CY
|
106.000
|
$152.000
|
$105.000
|
$100.000
|
$170.760
|
$150.000
|
$220.500
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
866.000
|
$75.000
|
$116.000
|
$105.000
|
$85.830
|
$70.000
|
$132.280
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
285.000
|
$85.000
|
$168.000
|
$150.000
|
$107.280
|
$100.000
|
$193.860
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
94.000
|
$150.000
|
$209.000
|
$185.000
|
$166.290
|
$200.000
|
$256.450
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
34.000
|
$170.000
|
$232.000
|
$205.000
|
$225.300
|
$210.000
|
$314.820
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
71.000
|
$200.000
|
$290.000
|
$260.000
|
$268.210
|
$275.000
|
$356.840
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
1.000
|
$5,300.000
|
$3,500.000
|
$3,200.000
|
$7,509.900
|
$6,300.000
|
$7,027.340
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
$8,000.000
|
$8,750.000
|
$8,000.000
|
$15,019.810
|
$11,550.000
|
$9,886.630
|
|
|
HEADWALL (CH - PW - 0) (DIA= 48 IN)
|
EA
|
2.000
|
$8,500.000
|
$10,500.000
|
$9,500.000
|
$22,529.710
|
$17,850.000
|
$11,285.140
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,700.000
|
$875.000
|
$850.000
|
$1,072.850
|
$735.000
|
$2,152.910
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,600.000
|
$1,100.000
|
$1,000.000
|
$1,180.130
|
$840.000
|
$3,397.590
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
28.000
|
$1,400.000
|
$2,900.000
|
$1,100.000
|
$1,180.130
|
$840.000
|
$1,685.260
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$2,500.000
|
$2,325.000
|
$2,800.000
|
$3,218.530
|
$1,890.000
|
$3,347.750
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$1,300.000
|
$1,310.000
|
$2,300.000
|
$5,676.290
|
$2,100.000
|
$5,378.470
|
|
|
REMOV STR (SET)
|
EA
|
6.000
|
$300.000
|
$1,162.000
|
$1,200.000
|
$804.630
|
$315.000
|
$577.310
|
|
|
REMOV STR (HEADWALL)
|
EA
|
2.000
|
$900.000
|
$1,750.000
|
$1,700.000
|
$804.640
|
$945.000
|
$1,404.940
|
|
|
REMOV STR (PIPE)
|
LF
|
607.000
|
$16.000
|
$35.000
|
$32.000
|
$12.870
|
$10.500
|
$23.190
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$250,491.500
|
$170,000.000
|
$350,000.000
|
$390,000.000
|
$430,000.000
|
$540,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$8,000.000
|
$17,000.000
|
$17,000.000
|
$5,500.000
|
$31,500.000
|
$12,866.680
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
312.000
|
$15.000
|
$16.000
|
$18.000
|
$17.060
|
$16.700
|
$25.540
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
312.000
|
$8.000
|
$8.500
|
$2.000
|
$9.080
|
$8.880
|
$8.980
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
5,569.000
|
$2.500
|
$1.600
|
$3.000
|
$1.720
|
$1.680
|
$3.560
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
5,569.000
|
$0.750
|
$0.350
|
$1.000
|
$0.380
|
$0.370
|
$0.940
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
1,620.000
|
$4.000
|
$3.000
|
$5.000
|
$3.210
|
$3.140
|
$6.040
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,620.000
|
$1.250
|
$0.600
|
$1.000
|
$0.630
|
$0.620
|
$1.260
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
270.000
|
$30.000
|
$52.000
|
$90.000
|
$111.730
|
$75.000
|
$33.620
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
1,890.000
|
$10.000
|
$8.000
|
$15.000
|
$24.590
|
$10.000
|
$10.460
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
270.000
|
$10.000
|
$26.000
|
$15.000
|
$33.760
|
$10.000
|
$17.670
|
|
|
DRIVEWAYS (CONC)
|
SY
|
189.000
|
$85.000
|
$163.500
|
$170.000
|
$91.190
|
$100.000
|
$133.890
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,011.000
|
$50.000
|
$38.000
|
$31.000
|
$42.910
|
$50.000
|
$56.860
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
12,221.000
|
$0.300
|
$0.400
|
$0.430
|
$0.590
|
$0.580
|
$0.450
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
6,263.000
|
$0.250
|
$0.500
|
$0.750
|
$0.270
|
$0.260
|
$0.840
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
14.000
|
$1,500.000
|
$1,040.000
|
$1,500.000
|
$1,421.520
|
$1,260.000
|
$2,219.920
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$700.000
|
$745.000
|
$1,000.000
|
$777.810
|
$735.000
|
$1,538.680
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
$7,000.000
|
$7,510.000
|
$15,000.000
|
$8,582.750
|
$9,450.000
|
$12,981.510
|
|
|
WIRE FENCE (TY C)
|
LF
|
50.000
|
$15.000
|
$160.000
|
$50.000
|
$75.400
|
$52.500
|
$44.540
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
2.000
|
$500.000
|
$210.000
|
$230.000
|
$241.390
|
$236.250
|
$373.210
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
34.000
|
$500.000
|
$485.000
|
$540.000
|
$472.050
|
$462.000
|
$842.890
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$550.000
|
$620.000
|
$700.000
|
$627.610
|
$614.250
|
$1,129.510
|
|
|
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
|
EA
|
1.000
|
$1,200.000
|
$1,425.000
|
$1,600.000
|
$1,046.020
|
$1,023.750
|
$2,015.990
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(U)
|
EA
|
1.000
|
$750.000
|
$935.000
|
$1,000.000
|
$1,024.570
|
$1,002.750
|
$2,400.230
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
36.000
|
$125.000
|
$100.000
|
$120.000
|
$69.730
|
$68.250
|
$149.910
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
26.000
|
$70.000
|
$100.000
|
$120.000
|
$80.460
|
$78.750
|
$279.230
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
48.000
|
$100.000
|
$105.000
|
$120.000
|
$85.830
|
$84.000
|
$154.050
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
22,264.000
|
$0.250
|
$0.150
|
$0.260
|
$0.160
|
$0.260
|
$0.330
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
22,319.000
|
$0.250
|
$0.150
|
$0.260
|
$0.160
|
$0.260
|
$0.270
|
|
|
WK ZN PAV MRK REMOV (REFL) TY II-A-A
|
EA
|
554.000
|
$5.000
|
$4.000
|
$4.000
|
$4.290
|
$4.200
|
$6.100
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
96.000
|
$15.000
|
$8.000
|
$15.000
|
$8.580
|
$15.750
|
$13.220
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
100.000
|
$1.000
|
$2.150
|
$0.600
|
$6.730
|
$1.910
|
$1.470
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,114.000
|
$1.000
|
$1.400
|
$0.600
|
$3.780
|
$1.990
|
$1.260
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
45.000
|
$20.000
|
$6.100
|
$17.000
|
$6.540
|
$15.750
|
$8.340
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
19,840.000
|
$0.100
|
$0.150
|
$0.230
|
$0.160
|
$0.230
|
$0.220
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
45.000
|
$1.250
|
$2.150
|
$6.000
|
$2.310
|
$5.250
|
$5.290
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
19,840.000
|
$0.100
|
$0.150
|
$0.230
|
$0.160
|
$0.230
|
$0.220
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(090MIL)
|
LF
|
19,840.000
|
$1.250
|
$0.700
|
$1.000
|
$0.750
|
$0.890
|
$0.970
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
19,840.000
|
$0.750
|
$0.700
|
$1.000
|
$0.750
|
$0.890
|
$0.810
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
277.000
|
$5.000
|
$4.300
|
$8.000
|
$4.610
|
$7.350
|
$4.370
|
|
|
TEMP TRAF SIGNALS
|
EA
|
1.000
|
$35,000.000
|
$38,000.000
|
$31,000.000
|
$37,915.480
|
$21,000.000
|
$48,588.430
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
2.000
|
$3,200.000
|
$2,000.000
|
$6,700.000
|
$10,728.440
|
$12,500.000
|
$7,953.220
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$1,300.000
|
$28,000.000
|
$7,500.000
|
$22,551.180
|
$15,750.000
|
$13,803.870
|
|
|
TMA (STATIONARY)
|
EA
|
2.000
|
$3,000.000
|
$50,000.000
|
$20,000.000
|
$62,642.170
|
$10,000.000
|
$30,156.730
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
24.000
|
$300.000
|
$100.000
|
$85.000
|
$92.290
|
$31.500
|
$137.800
|
|
Totals: |
$3,383,029.400
|
$3,592,305.290
|
$3,961,735.220
|
$3,980,239.060
|
$4,388,571.640
|
$5,531,737.410
|