WISE COUNTY ROAD 1590 (0902-20-238)

Items: 56

County: WISE
Length: 0.0000 MILES (0.1605 MILES)
Highway: COUNTY ROAD 1590
District: FORT WORTH
Control Number: 0902-20-238
DBE Goal: 0.0%
Project: BR 2026(019)
Guaranty: $16,000.00
Time: 76 WORKING DAYS
Engineer's Estimate: $854,301.50
Date: 08/06/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263239
Type: BRIDGE REPLACEMENT
Project ID: A00214454
Contract Type: FEDERAL
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (8)
E
Engineer's Estimate
$854,301.50
Over/Under Est: 12.6% $107,610.50
Over/Under Est: 13.27% $113,329.30
Amt Left: 0.59% $5,718.80
Over/Under Est: 17.04% $145,552.58
Amt Left: 3.94% $37,942.08
Delta: -3.33% -$32,223.28
Over/Under Est: 18.6% $158,939.35
Amt Left: 5.34% $51,328.85
Delta: -1.34% -$13,386.77
Over/Under Est: 33.53% $286,449.20
Amt Left: 18.59% $178,838.70
Delta: -12.58% -$127,509.85
Over/Under Est: 48.07% $410,698.50
Amt Left: 31.51% $303,088.00
Delta: -10.89% -$124,249.30
$1,372,183.75
Over/Under Est: 60.62% $517,882.25
Amt Left: 42.65% $410,271.75
Delta: -8.47% -$107,183.75
$1,590,868.31
Over/Under Est: 86.22% $736,566.81
Amt Left: 65.39% $628,956.31
Delta: -15.94% -$218,684.56

Bid Items & Bid Tabulations

56 Total 0 of 56
WISE  |  COUNTY ROAD 1590  |  FORT WORTH  |  0902-20-238  |  08/06/2026 1:00 PM CDT  |  $854,301.50  |  BR 2026(019)  |  BRIDGE REPL  |  76 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
HODGES AND SON CONSTRUCTION COMPANY, INC.
GARRET SHIELDS INFRASTRUCTURE
TEXAS STEEL INDUSTRIAL PLACING, LLC
SCOTT TUCKER CONSTRUCTION COMPANY, LLC
COPPELL CONSTRUCTION CO., INC.
ED BELL CONSTRUCTION COMPANY
EARTH BUILDERS, L.P.
THK CONSTRUCTION LLC
PREPARING ROW
STA 4.000 $7,000.000 $9,000.000 $1,000.000 $1,000.000 $4,013.000 $3,500.000 $5,000.000 $10,000.000 $2,500.000
OBLITERATING ABANDONED ROAD
SY 956.000 $8.000 $15.000 $40.000 $18.080 $14.000 $29.000 $16.000 $70.000 $100.000
EXCAV (ROADWAY)
CY 35.000 $37.000 $35.000 $30.000 $50.000 $14.000 $59.000 $175.000 $50.000 $25.000
EXCAV (CHANNEL)
CY 928.000 $28.000 $20.000 $30.000 $17.000 $8.000 $29.000 $65.000 $50.000 $25.000
EMBANK (FNL)(DC)(TY B)
CY 1,560.000 $30.000 $30.000 $30.000 $22.000 $56.000 $30.000 $50.000 $50.000 $25.000
COMPOST MANUF TOPSOIL (4")
SY 2,677.000 $3.000 $10.000 $5.000 $2.300 $9.000 $2.500 $1.360 $5.000 $20.000
STRAW/HAY MLCH SEED(PERM_RURAL_SAND)
SY 2,677.000 $3.000 $3.000 $0.100 $1.780 $0.700 $1.800 $0.650 $2.000 $5.000
STRAW/HAY MLCH SEED (TEMP_WARM)
SY 1,339.000 $1.000 $3.000 $0.100 $2.330 $0.700 $2.500 $0.600 $1.500 $5.000
STRAW/HAY MLCH SEED (TEMP_WARM_COOL)
SY 1,339.000 $1.800 $3.000 $0.100 $2.330 $0.700 $2.500 $0.610 $1.500 $5.000
VEGETATIVE WATERING
TGL 21.000 $10.000 $1.000 $10.000 $103.590 $452.000 $50.000 $365.210 $100.000 $100.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 900.000 $43.000 $48.000 $25.000 $29.000 $23.000 $37.000 $50.000 $38.000 $55.000
PRIME COAT(MC-30 OR AE-P)
GAL 270.000 $15.000 $10.000 $8.000 $30.470 $33.000 $15.000 $7.630 $30.000 $30.000
SP MIXES SP-C PG70-28
TON 95.500 $160.000 $450.000 $450.000 $699.000 $745.000 $433.000 $471.970 $350.000 $300.000
TACK COAT
GAL 88.000 $4.000 $5.000 $6.000 $5.000 $9.000 $5.000 $5.450 $25.000 $20.000
CEM STABIL BKFL
CY 66.000 $300.000 $300.000 $200.000 $150.000 $218.000 $330.000 $575.000 $250.000 $400.000
DRILL SHAFT (36 IN)
LF 300.000 $290.000 $310.000 $350.000 $340.000 $376.000 $350.000 $375.000 $450.000 $440.000
CL C CONC (ABUT)(HPC)
CY 31.000 $1,210.000 $1,900.000 $1,200.000 $1,100.000 $1,131.000 $1,350.000 $2,000.000 $2,600.000 $1,300.000
REINF CONC SLAB (HPC)
SF 1,820.000 $18.000 $32.000 $30.000 $22.000 $33.000 $39.000 $40.000 $45.000 $40.000
APPROACH SLAB (HPC)
CY 38.500 $810.000 $1,000.000 $1,200.000 $700.000 $886.000 $920.000 $1,500.000 $1,600.000 $1,000.000
PRESTR CONC GIRDER (TX28)
LF 278.000 $55.000 $65.000 $250.000 $300.000 $137.000 $330.000 $200.000 $400.000 $179.860
RIPRAP (MOW STRIP)(4 IN)
CY 24.000 $745.000 $750.000 $600.000 $550.000 $786.000 $750.000 $1,250.000 $650.000 $1,000.000
RIPRAP (STONE PROTECTION)(24 IN)
CY 320.000 $196.000 $180.000 $180.000 $140.000 $122.000 $160.000 $275.000 $220.000 $200.000
RAIL (TY T631)
LF 172.000 $122.000 $90.000 $150.000 $99.250 $112.000 $100.000 $108.180 $150.000 $122.940
ARMOR JOINT (SEALED)
LF 48.000 $200.000 $150.000 $300.000 $120.000 $95.000 $225.000 $150.000 $230.000 $250.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $20,000.000 $30,000.000 $20,000.000 $10,000.000 $18,905.000 $30,000.000 $30,000.000 $30,000.000 $50,000.000
MOBILIZATION
LS 1.000 $78,000.000 $85,000.000 $100,000.000 $96,000.000 $100,000.000 $95,000.000 $103,939.210 $125,000.000 $130,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $3,265.000 $2,000.000 $5,000.000 $3,000.000 $2,191.000 $15,000.000 $8,500.000 $4,000.000 $5,131.050
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 75.000 $91.000 $95.000 $100.000 $115.000 $98.000 $55.000 $275.000 $200.000 $100.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $45.000 $1.000 $20.000 $58.570 $47.000 $59.000 $72.660 $85.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 100.000 $11.000 $1.000 $5.000 $20.200 $15.000 $21.000 $14.990 $10.000 $5.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,864.000 $4.000 $1.000 $5.000 $5.400 $3.700 $5.500 $4.150 $6.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,864.000 $1.200 $1.000 $1.000 $1.030 $1.100 $1.100 $1.270 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 100.000 $8.000 $5.000 $5.000 $10.840 $7.000 $11.000 $8.070 $12.000 $20.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $1.000 $1.000 $1.030 $1.300 $1.000 $1.500 $2.000 $10.000
CONSTRUCTING DETOURS
SY 1,094.000 $125.000 $100.000 $60.000 $175.000 $103.000 $105.000 $94.000 $80.000 $250.000
DRIVEWAYS (ACP)
SY 131.000 $75.000 $90.000 $120.000 $112.000 $125.000 $66.000 $265.000 $75.000 $80.000
MTL W-BEAM GD FEN (TIM POST)
LF 225.000 $25.000 $26.000 $40.000 $26.900 $31.000 $27.000 $29.320 $40.000 $26.400
MTL BEAM GD FEN TRANS (T6)
EA 4.000 $500.000 $1,500.000 $500.000 $1,199.000 $1,335.000 $1,200.000 $1,306.910 $1,500.000 $480.000
MTL THRIE-BEAM GD FEN ADJUSTMENT
LF 25.000 $12.000 $20.000 $40.000 $29.550 $34.000 $30.000 $32.210 $45.000 $1,440.000
SHORT RADIUS (28")
LF 43.750 $42.000 $40.000 $30.000 $59.450 $67.000 $60.000 $64.800 $65.000 $46.800
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,400.000 $1,600.000 $1,500.000 $1,678.000 $1,896.000 $1,700.000 $1,829.020 $1,500.000 $1,533.600
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,200.000 $3,300.000 $3,500.000 $3,398.000 $3,761.000 $3,400.000 $3,703.820 $4,000.000 $3,840.000
GATE (REMOVE)
EA 1.000 $500.000 $50.000 $500.000 $500.000 $40.000 $500.000 $545.000 $150.000 $500.000
WIRE FENCE (TY C)
LF 96.000 $23.000 $35.000 $10.000 $23.000 $54.000 $23.000 $25.070 $25.000 $50.000
GATE (TY 1)
EA 1.000 $1,781.000 $2,000.000 $1,000.000 $1,800.000 $1,049.000 $1,800.000 $1,962.000 $1,800.000 $10,000.000
REMOVE SM RD SN SUP&AM
EA 4.000 $100.000 $50.000 $100.000 $100.000 $63.000 $250.000 $163.500 $150.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 6.000 $49.000 $500.000 $40.000 $79.000 $79.000 $79.000 $86.110 $75.000 $100.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $48.000 $25.000 $40.000 $30.000 $30.000 $30.000 $32.700 $75.000 $37.200
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 2,684.000 $1.000 $1.000 $0.700 $0.550 $3.100 $0.550 $1.090 $2.000 $3.600
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 6,210.000 $1.000 $1.000 $0.700 $0.550 $3.100 $0.550 $1.090 $2.000 $3.600
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 220.000 $1.600 $5.000 $1.250 $1.000 $2.400 $15.000 $1.090 $3.000 $1.000
PAVEMENT SLER 6"
LF 140.000 $1.500 $1.000 $1.250 $1.000 $3.800 $1.000 $2.180 $2.000 $3.600
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 140.000 $2.500 $5.000 $5.000 $4.000 $3.800 $4.000 $2.180 $3.000 $3.600
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 740.000 $2.500 $5.000 $5.000 $4.000 $3.200 $4.000 $2.180 $3.000 $3.600
TREE REMOVAL (18" - 24" DIA)
EA 54.000 $150.000 $370.000 $750.000 $565.000 $413.000 $1,210.000 $615.850 $1,000.000 $2,500.000
POST AND CABLE FENCE (REMOVAL)
LF 123.000 $7.000 $8.000 $5.000 $4.500 $4.000 $15.000 $4.910 $6.000 $20.000
Totals: $854,301.500 $961,912.000 $967,630.800 $999,854.078 $1,013,240.850 $1,140,750.700 $1,264,999.995 $1,372,183.750 $1,590,868.310
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $10,000.00