|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
37.000
|
$40.000
|
$60.000
|
$65.000
|
$60.000
|
$50.000
|
$140.000
|
$200.000
|
|
|
BACKFILL (TY A)
|
STA
|
331.000
|
$360.000
|
$275.000
|
$585.000
|
$400.000
|
$600.000
|
$485.000
|
$650.000
|
|
|
BLADING
|
STA
|
82.000
|
$250.000
|
$140.000
|
$200.000
|
$350.000
|
$400.000
|
$350.000
|
$450.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
35,970.000
|
$0.300
|
$0.130
|
$0.120
|
$0.150
|
$0.130
|
$0.250
|
$1.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
71,939.000
|
$0.750
|
$0.680
|
$0.650
|
$0.750
|
$0.650
|
$1.000
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
35,970.000
|
$0.700
|
$0.600
|
$0.600
|
$0.720
|
$0.580
|
$0.800
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
35,970.000
|
$0.700
|
$0.600
|
$0.580
|
$0.700
|
$0.580
|
$0.800
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
791.000
|
$20.000
|
$10.000
|
$20.000
|
$25.000
|
$8.000
|
$32.000
|
$50.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
4,413.000
|
$7.000
|
$5.250
|
$5.000
|
$4.500
|
$6.000
|
$7.000
|
$10.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
61,720.000
|
$10.000
|
$5.450
|
$4.500
|
$5.000
|
$4.650
|
$5.000
|
$10.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
1,319.000
|
$250.000
|
$184.000
|
$195.000
|
$215.000
|
$150.000
|
$145.000
|
$500.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
5,000.000
|
$74.650
|
$65.000
|
$70.000
|
$120.000
|
$70.000
|
$65.000
|
$80.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
2,162.000
|
$5.450
|
$4.000
|
$5.000
|
$10.000
|
$5.000
|
$4.000
|
$20.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
9,856.000
|
$10.000
|
$3.000
|
$4.000
|
$6.000
|
$5.000
|
$3.500
|
$20.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
3.000
|
$1,350.000
|
$1,300.000
|
$1,000.000
|
$2,000.000
|
$2,000.000
|
$4,400.000
|
$2,500.000
|
|
|
RIPRAP (STONE PROTECTION)(24 IN)
|
CY
|
8.000
|
$215.000
|
$475.000
|
$400.000
|
$375.000
|
$350.000
|
$560.000
|
$650.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
13.000
|
$750.000
|
$745.000
|
$785.000
|
$900.000
|
$800.000
|
$660.000
|
$550.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
1,991.000
|
$75.000
|
$60.000
|
$65.000
|
$80.000
|
$70.000
|
$53.000
|
$85.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
236.000
|
$105.000
|
$82.000
|
$85.000
|
$110.000
|
$100.000
|
$84.000
|
$105.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
4.000
|
$200.000
|
$400.000
|
$275.000
|
$700.000
|
$150.000
|
$525.000
|
$150.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
149.000
|
$1,175.000
|
$700.000
|
$1,600.000
|
$1,050.000
|
$900.000
|
$805.000
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
$1,500.000
|
$1,500.000
|
$2,400.000
|
$1,700.000
|
$1,350.000
|
$1,120.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
17.000
|
$1,800.000
|
$1,200.000
|
$2,400.000
|
$1,700.000
|
$1,350.000
|
$1,360.000
|
$2,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,500.000
|
$3,300.000
|
$4,000.000
|
$2,400.000
|
$2,500.000
|
$2,525.000
|
$5,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
75.000
|
$535.000
|
$400.000
|
$750.000
|
$600.000
|
$800.000
|
$385.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$880,000.000
|
$570,000.000
|
$307,000.000
|
$770,000.000
|
$695,000.000
|
$846,000.000
|
$1,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
8.000
|
$10,000.000
|
$2,000.000
|
$10,000.000
|
$10,000.000
|
$15,000.000
|
$40,000.000
|
$8,500.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
50.000
|
$40.000
|
$75.000
|
$19.000
|
$50.000
|
$35.000
|
$45.000
|
$50.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
15.000
|
$140.000
|
$125.000
|
$55.000
|
$150.000
|
$100.000
|
$115.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$4.000
|
$4.250
|
$4.500
|
$5.500
|
$4.500
|
$5.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.000
|
$1.100
|
$1.000
|
$3.000
|
$1.100
|
$2.000
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
15.000
|
$175.000
|
$125.000
|
$91.000
|
$210.000
|
$150.000
|
$135.000
|
$150.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,740.000
|
$65.000
|
$45.000
|
$62.000
|
$70.000
|
$55.000
|
$60.000
|
$55.000
|
|
|
TURNOUTS (ACP)
|
SY
|
299.000
|
$125.000
|
$60.000
|
$75.000
|
$90.000
|
$80.000
|
$125.000
|
$55.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
436.000
|
$150.000
|
$100.000
|
$200.000
|
$180.000
|
$140.000
|
$260.000
|
$150.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
50,050.000
|
$0.250
|
$0.350
|
$0.250
|
$0.300
|
$0.400
|
$0.250
|
$0.500
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
25,301.000
|
$0.250
|
$0.250
|
$0.250
|
$0.300
|
$0.400
|
$0.250
|
$0.500
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
50.000
|
$32.000
|
$33.000
|
$33.000
|
$40.000
|
$35.000
|
$48.000
|
$100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
50.000
|
$3.000
|
$3.300
|
$3.300
|
$4.000
|
$4.000
|
$15.000
|
$10.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$3,000.000
|
$3,400.000
|
$3,500.000
|
$4,000.000
|
$3,500.000
|
$5,000.000
|
$3,250.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$250.000
|
$220.000
|
$220.000
|
$265.000
|
$225.000
|
$1,600.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
48.000
|
$350.000
|
$335.000
|
$320.000
|
$375.000
|
$350.000
|
$350.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
4.000
|
$400.000
|
$374.000
|
$365.000
|
$430.000
|
$375.000
|
$400.000
|
$1,000.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
3.000
|
$700.000
|
$555.000
|
$725.000
|
$840.000
|
$700.000
|
$580.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
81.000
|
$700.000
|
$690.000
|
$650.000
|
$760.000
|
$640.000
|
$725.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
25.000
|
$875.000
|
$780.000
|
$750.000
|
$880.000
|
$740.000
|
$817.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
3.000
|
$1,000.000
|
$1,025.000
|
$900.000
|
$1,000.000
|
$900.000
|
$1,070.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
1.000
|
$590.000
|
$820.000
|
$850.000
|
$950.000
|
$800.000
|
$860.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
12.000
|
$1,150.000
|
$995.000
|
$1,100.000
|
$1,300.000
|
$1,075.000
|
$1,040.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,200.000
|
$1,170.000
|
$1,100.000
|
$1,300.000
|
$1,065.000
|
$1,225.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
1.000
|
$1,300.000
|
$1,270.000
|
$1,100.000
|
$1,300.000
|
$1,025.000
|
$1,330.000
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
1.000
|
$2,100.000
|
$2,050.000
|
$1,800.000
|
$2,000.000
|
$1,700.000
|
$2,150.000
|
$1,500.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
22.000
|
$600.000
|
$620.000
|
$525.000
|
$600.000
|
$500.000
|
$650.000
|
$800.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
127.000
|
$118.000
|
$115.000
|
$110.000
|
$130.000
|
$110.000
|
$121.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(BRF)GF2
|
EA
|
5.000
|
$30.000
|
$19.000
|
$30.000
|
$33.000
|
$30.000
|
$20.000
|
$100.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
40.000
|
$75.000
|
$90.000
|
$90.000
|
$100.000
|
$85.000
|
$95.000
|
$100.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
123,115.000
|
$0.500
|
$0.220
|
$0.220
|
$0.260
|
$0.220
|
$0.250
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
2,025.000
|
$1.500
|
$0.440
|
$0.440
|
$0.530
|
$0.450
|
$0.500
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
835.000
|
$8.750
|
$3.300
|
$3.300
|
$4.000
|
$3.300
|
$3.750
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
2,437.000
|
$0.550
|
$0.280
|
$0.300
|
$0.330
|
$0.300
|
$0.300
|
$0.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
75,747.000
|
$0.500
|
$0.220
|
$0.220
|
$0.250
|
$0.220
|
$0.250
|
$0.500
|
|
|
WK ZN PAV MRK REMOV (W)6"(BRK)
|
LF
|
560.000
|
$3.000
|
$1.380
|
$1.400
|
$2.750
|
$3.000
|
$2.500
|
$5.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(BRK)
|
LF
|
17,675.000
|
$1.500
|
$1.380
|
$1.400
|
$2.750
|
$3.000
|
$3.750
|
$2.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
150.000
|
$1.500
|
$1.100
|
$1.100
|
$2.000
|
$2.000
|
$2.500
|
$6.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,536.000
|
$2.000
|
$1.100
|
$1.100
|
$2.000
|
$2.000
|
$2.500
|
$6.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
|
LF
|
900.000
|
$3.750
|
$2.200
|
$2.200
|
$2.200
|
$2.200
|
$2.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
1,492.000
|
$1.750
|
$1.650
|
$1.650
|
$1.650
|
$1.650
|
$1.900
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
731.000
|
$8.000
|
$6.600
|
$6.600
|
$8.000
|
$6.500
|
$7.500
|
$10.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
70,207.000
|
$1.000
|
$0.770
|
$0.770
|
$0.900
|
$0.770
|
$0.900
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
2,307.000
|
$1.000
|
$1.100
|
$1.100
|
$1.300
|
$1.100
|
$1.250
|
$1.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
74,714.000
|
$1.000
|
$0.770
|
$0.770
|
$0.900
|
$0.770
|
$0.900
|
$1.000
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
13.000
|
$250.000
|
$230.000
|
$230.000
|
$280.000
|
$230.000
|
$263.000
|
$250.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
13.000
|
$300.000
|
$285.000
|
$285.000
|
$350.000
|
$290.000
|
$325.000
|
$300.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
324.000
|
$5.500
|
$4.400
|
$4.500
|
$5.300
|
$4.500
|
$5.000
|
$6.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
75.000
|
$6.250
|
$5.500
|
$5.500
|
$6.600
|
$5.500
|
$6.250
|
$6.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
3,460.000
|
$5.000
|
$4.400
|
$4.500
|
$5.300
|
$4.500
|
$5.000
|
$6.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
2.000
|
$5,900.000
|
$4,000.000
|
$7,500.000
|
$7,000.000
|
$5,000.000
|
$10,000.000
|
$3,000.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
18,859.000
|
$190.000
|
$132.000
|
$181.000
|
$145.000
|
$175.000
|
$182.000
|
$180.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
7,144.000
|
$215.000
|
$136.000
|
$176.000
|
$148.000
|
$180.000
|
$177.000
|
$180.000
|
|
|
TACK COAT
|
GAL
|
17,145.000
|
$4.000
|
$5.000
|
$3.000
|
$4.750
|
$4.500
|
$0.200
|
$8.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$155.000
|
$80.000
|
$105.000
|
$200.000
|
$300.000
|
$188.000
|
$150.000
|
|
|
TMA (STATIONARY)
|
DAY
|
114.000
|
$200.000
|
$150.000
|
$150.000
|
$250.000
|
$300.000
|
$315.000
|
$250.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
36.000
|
$200.000
|
$150.000
|
$120.000
|
$300.000
|
$400.000
|
$375.000
|
$550.000
|
|
Totals: |
$9,303,468.250
|
$6,350,678.390
|
$7,744,215.710
|
$7,748,658.060
|
$7,997,398.710
|
$8,467,225.550
|
$10,052,357.000
|