|
|
PREPARING ROW
|
STA
|
100.000
|
$2,700.000
|
$1,500.000
|
$2,865.000
|
|
|
REMOVING CONC (MEDIANS)
|
SY
|
104.000
|
$20.000
|
$30.000
|
$67.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
27.000
|
$20.120
|
$30.000
|
$205.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
414.000
|
$7.770
|
$15.000
|
$11.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
60.000
|
$20.240
|
$50.000
|
$72.750
|
|
|
BACKFILL (TY A)
|
STA
|
59.000
|
$230.000
|
$600.000
|
$512.000
|
|
|
BLADING
|
STA
|
59.000
|
$173.500
|
$350.000
|
$245.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
134.000
|
$1.070
|
$10.000
|
$28.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
15,789.000
|
$0.130
|
$0.150
|
$0.200
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
15,789.000
|
$0.520
|
$0.750
|
$0.900
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
15,789.000
|
$0.700
|
$0.700
|
$0.600
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
15,789.000
|
$0.690
|
$0.700
|
$0.600
|
|
|
VEGETATIVE WATERING
|
MG
|
174.000
|
$9.700
|
$10.000
|
$10.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,104.000
|
$56.670
|
$70.000
|
$110.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
4,558.000
|
$4.990
|
$6.000
|
$6.600
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
1,370.000
|
$6.510
|
$8.000
|
$15.400
|
|
|
CL C CONC (COLLAR)
|
EA
|
2.000
|
$1,462.000
|
$2,000.000
|
$1,875.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,064.000
|
$54.510
|
$60.000
|
$55.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
196.000
|
$75.990
|
$77.000
|
$89.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
116.000
|
$871.000
|
$800.000
|
$904.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$1,100.000
|
$4,345.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
10.000
|
$1,251.000
|
$1,300.000
|
$2,375.000
|
|
|
REMOV STR (DRIVEWAY CULVERT)
|
EA
|
71.000
|
$623.000
|
$400.000
|
$255.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$216,405.000
|
$250,000.000
|
$391,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$4,000.000
|
$15,000.000
|
$2,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
40.000
|
$32.000
|
$40.000
|
$38.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
40.000
|
$8.110
|
$11.000
|
$11.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$72.000
|
$125.000
|
$112.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
400.000
|
$2.900
|
$5.000
|
$4.400
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
400.000
|
$0.650
|
$2.200
|
$2.200
|
|
|
DRIVEWAYS (ACP)
|
SY
|
4,085.000
|
$52.160
|
$40.000
|
$64.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
27.000
|
$99.200
|
$150.000
|
$275.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
33,868.000
|
$0.320
|
$0.500
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
16,934.000
|
$0.380
|
$0.500
|
$0.300
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
16.000
|
$150.000
|
$100.000
|
$72.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
1,972.000
|
$0.310
|
$1.650
|
$1.650
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
1,972.000
|
$0.320
|
$1.650
|
$1.650
|
|
|
WK ZN PAV MRK REMOV (W)4"(BRK)
|
LF
|
2,022.000
|
$1.400
|
$2.000
|
$1.100
|
|
|
WK ZN PAV MRK REMOV (Y)4"(BRK)
|
LF
|
9,308.000
|
$1.020
|
$2.000
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
43,708.000
|
$0.540
|
$0.550
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,524.000
|
$0.690
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
21,729.000
|
$0.590
|
$0.550
|
$0.550
|
|
PREFAB PAV MRK TY B (W)(8")(SLD)
|
LF
|
360.000
|
$10.000
|
$5.500
|
$5.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
595.000
|
$3.940
|
$4.500
|
$4.400
|
|
|
D-GR HMA TY-D PG 64-22 (EXEMPT)
|
TON
|
337.000
|
$204.000
|
$175.000
|
$400.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
501.000
|
$150.000
|
$185.000
|
$231.000
|
|
|
TACK COAT
|
GAL
|
456.000
|
$3.210
|
$6.000
|
$11.550
|
|
|
TBPFC (MEMBRANE)
|
GAL
|
5,406.000
|
$5.660
|
$5.000
|
$4.750
|
|
|
TBPFC PG76-22 SAC-A
|
TON
|
4,055.000
|
$217.910
|
$260.000
|
$299.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,050.000
|
$25,000.000
|
$21,250.000
|
|
|
TMA (STATIONARY)
|
DAY
|
52.000
|
$244.000
|
$250.000
|
$188.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
12.000
|
$419.000
|
$360.000
|
$500.000
|
|
Totals: |
$2,407,434.600
|
$2,614,763.550
|
$3,278,125.750
|