|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
368.000
|
$12.000
|
$15.000
|
$20.000
|
$20.000
|
$10.000
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
448.000
|
$10.000
|
$15.000
|
$11.500
|
$9.000
|
$7.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
104.000
|
$22.000
|
$30.000
|
$50.000
|
$25.000
|
$10.000
|
|
|
BACKFILL (TY A)
|
STA
|
363.580
|
$275.000
|
$220.000
|
$145.000
|
$300.000
|
$225.000
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
50,478.000
|
$0.850
|
$0.650
|
$0.650
|
$0.850
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
25,238.000
|
$0.700
|
$0.650
|
$0.650
|
$0.700
|
$1.000
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
25,238.000
|
$0.700
|
$0.650
|
$0.630
|
$0.700
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
1,077.000
|
$10.000
|
$15.000
|
$1.000
|
$7.000
|
$30.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
79,898.000
|
$2.800
|
$3.250
|
$3.150
|
$3.500
|
$4.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
1,902.000
|
$120.000
|
$115.000
|
$129.000
|
$135.000
|
$175.000
|
|
|
D-GR HMA(SQ) TY-D PG64-22
|
TON
|
685.000
|
$150.000
|
$197.000
|
$140.000
|
$185.000
|
$100.000
|
|
|
PFC (ASPHALT) PG76-22
|
TON
|
388.000
|
$130.000
|
$144.000
|
$145.000
|
$140.000
|
$150.000
|
|
|
PFC-F (AGGR) PG76-22 SAC-A
|
TON
|
6,071.000
|
$135.000
|
$144.000
|
$145.000
|
$140.000
|
$150.000
|
|
|
SUPERPAVE MIXTURES SP-C PG70-22
|
TON
|
25,667.000
|
$100.000
|
$102.000
|
$102.000
|
$100.000
|
$101.500
|
|
|
SUPERPAVE MIXTURES SP-D PG70-22
|
TON
|
2,646.000
|
$110.000
|
$109.000
|
$114.000
|
$115.000
|
$100.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
4,000.000
|
$45.000
|
$44.000
|
$59.250
|
$55.000
|
$40.000
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
20,137.000
|
$2.000
|
$2.650
|
$3.000
|
$3.000
|
$2.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
3,330.000
|
$2.250
|
$3.200
|
$3.550
|
$3.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (0" TO 5")
|
SY
|
6,209.000
|
$7.000
|
$4.000
|
$4.200
|
$5.000
|
$3.500
|
|
|
PLAN & TEXT ASPH CONC PAV (0" TO 2.75")
|
SY
|
7,853.000
|
$2.300
|
$3.500
|
$3.450
|
$5.000
|
$3.000
|
|
|
PLANE ASPH CONC PAV (2.75")
|
SY
|
2,738.000
|
$2.500
|
$4.000
|
$3.600
|
$5.000
|
$3.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
12.000
|
$350.000
|
$650.000
|
$1,200.000
|
$500.000
|
$500.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
40.000
|
$500.000
|
$650.000
|
$545.000
|
$450.000
|
$500.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$530,000.000
|
$251,000.000
|
$338,000.000
|
$300,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$4,800.000
|
$5,000.000
|
$3,000.000
|
$8,000.000
|
$6,500.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
50.000
|
$22.000
|
$15.000
|
$60.000
|
$50.000
|
$100.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$80.000
|
$50.000
|
$100.000
|
$125.000
|
$100.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,000.000
|
$2.600
|
$3.000
|
$3.000
|
$4.000
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,000.000
|
$0.850
|
$1.000
|
$1.200
|
$1.000
|
$2.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
50.000
|
$125.000
|
$85.000
|
$100.000
|
$150.000
|
$175.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
368.000
|
$92.000
|
$85.000
|
$110.000
|
$100.000
|
$85.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
20,068.000
|
$0.180
|
$0.170
|
$0.250
|
$0.500
|
$0.300
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
10,034.000
|
$0.200
|
$0.170
|
$0.500
|
$0.800
|
$0.350
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
450.000
|
$22.000
|
$20.000
|
$25.000
|
$21.000
|
$22.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,750.000
|
$1,530.000
|
$1,760.000
|
$1,800.000
|
$1,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.500
|
$2.250
|
$4.400
|
$3.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$250.000
|
$167.000
|
$248.000
|
$200.000
|
$175.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,500.000
|
$2,950.000
|
$2,900.000
|
$3,000.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$222.000
|
$275.000
|
$220.000
|
$250.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
5,000.000
|
$41.000
|
$43.000
|
$30.000
|
$10.000
|
$25.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
26.000
|
$35.000
|
$28.000
|
$49.500
|
$35.000
|
$35.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
116.000
|
$0.230
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
83,804.000
|
$0.200
|
$0.110
|
$0.110
|
$0.120
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
16,138.000
|
$0.350
|
$0.280
|
$0.280
|
$0.270
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
791.000
|
$2.350
|
$2.750
|
$2.750
|
$3.000
|
$2.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
3,683.000
|
$0.220
|
$0.110
|
$0.110
|
$0.120
|
$0.150
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
70,824.000
|
$0.170
|
$0.110
|
$0.110
|
$0.120
|
$0.150
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
842.000
|
$1.000
|
$0.950
|
$1.250
|
$1.750
|
$1.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
5,102.000
|
$1.250
|
$0.950
|
$1.250
|
$1.750
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (W)(4")
|
LF
|
1,624.000
|
$1.050
|
$1.100
|
$1.450
|
$1.750
|
$1.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
14,412.000
|
$1.100
|
$1.100
|
$1.450
|
$1.750
|
$1.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
16,136.000
|
$0.750
|
$0.900
|
$0.880
|
$0.880
|
$1.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
1,268.000
|
$5.000
|
$5.500
|
$5.500
|
$5.500
|
$5.500
|
|
REFL PAV MRK TY II (W) 4" (SLD)
|
LF
|
970.000
|
$0.280
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
970.000
|
$0.280
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
116.000
|
$0.350
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
67,454.000
|
$0.250
|
$0.450
|
$0.440
|
$0.450
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,434.000
|
$0.320
|
$0.500
|
$0.500
|
$0.500
|
$0.500
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
59,698.000
|
$0.250
|
$0.450
|
$0.450
|
$0.450
|
$0.500
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
19,430.000
|
$0.820
|
$0.700
|
$0.700
|
$0.700
|
$0.750
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
1,249.000
|
$1.700
|
$0.800
|
$0.800
|
$0.800
|
$0.750
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
9,620.000
|
$1.000
|
$0.800
|
$0.800
|
$0.800
|
$0.750
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
49.000
|
$195.000
|
$206.000
|
$200.000
|
$200.000
|
$200.000
|
|
PREFAB PAV MRK TY C (W) (DBL ARROW)
|
EA
|
5.000
|
$340.000
|
$278.000
|
$275.000
|
$300.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
49.000
|
$260.000
|
$250.000
|
$250.000
|
$250.000
|
$275.000
|
|
PREFAB PAV MRK TY C (W) (18")(YLD TRI)
|
EA
|
128.000
|
$25.000
|
$39.000
|
$38.500
|
$45.000
|
$40.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
608.000
|
$3.000
|
$3.750
|
$3.750
|
$4.000
|
$4.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
4,634.000
|
$2.650
|
$3.500
|
$3.500
|
$4.000
|
$4.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
1,940.000
|
$0.300
|
$1.100
|
$1.100
|
$1.100
|
$1.000
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,940.000
|
$0.150
|
$0.550
|
$0.550
|
$0.550
|
$0.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$90.000
|
$80.000
|
$65.000
|
$200.000
|
$700.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$9,500.000
|
$3,500.000
|
$6,000.000
|
$15,000.000
|
$20,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
625.000
|
$3.500
|
$9.000
|
$8.800
|
$9.000
|
$9.000
|
|
|
TMA (STATIONARY)
|
EA
|
1.000
|
$5,000.000
|
$9,200.000
|
$6,500.000
|
$30,000.000
|
$12,000.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
40.000
|
$23.000
|
$105.000
|
$110.000
|
$300.000
|
$125.000
|
|
Totals: |
$5,870,279.890
|
$5,773,806.790
|
$5,844,679.330
|
$5,865,375.760
|
$6,250,538.200
|