|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
200.000
|
$10.750
|
$9.000
|
$16.000
|
$15.000
|
$15.000
|
|
|
SUBGRADE WIDENING (ORD COMP)
|
STA
|
138.800
|
$160.000
|
$300.000
|
$225.000
|
$357.610
|
$300.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
724.000
|
$22.500
|
$17.000
|
$20.000
|
$16.010
|
$15.000
|
|
|
BACKFILL (TY A)
|
STA
|
138.800
|
$770.000
|
$280.000
|
$250.000
|
$667.780
|
$300.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
16,134.000
|
$0.220
|
$0.150
|
$0.150
|
$0.190
|
$0.150
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
16,134.000
|
$0.220
|
$0.150
|
$0.130
|
$0.190
|
$0.150
|
|
|
STRAW/HAY MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
32,267.000
|
$0.700
|
$0.360
|
$0.380
|
$0.320
|
$0.500
|
|
|
VEGETATIVE WATERING
|
MG
|
710.000
|
$10.000
|
$18.000
|
$10.000
|
$7.990
|
$15.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 1-2) (6")
|
SY
|
37,013.000
|
$5.000
|
$4.000
|
$4.250
|
$4.690
|
$9.000
|
|
|
FL BS (RDWY DEL) (TY D GR 1-2) (IN VEH)
|
CY
|
2,000.000
|
$42.000
|
$63.000
|
$60.000
|
$106.710
|
$75.000
|
|
|
REWORK BS MATL (TY D)(7")(ORD COMP)
|
SY
|
37,013.000
|
$2.000
|
$1.000
|
$3.000
|
$3.960
|
$4.000
|
|
|
CEMENT
|
TON
|
605.000
|
$160.000
|
$152.000
|
$205.000
|
$144.000
|
$165.000
|
|
|
CEMENT TREAT (EXIST MATL)(7 IN)(DC)
|
SY
|
38,556.000
|
$2.500
|
$2.800
|
$2.250
|
$2.650
|
$5.000
|
|
|
EMULS ASPH (EROSN CONT)(SS-1)
|
GAL
|
1,851.000
|
$5.550
|
$4.500
|
$6.000
|
$5.860
|
$7.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
28,484.000
|
$3.000
|
$3.800
|
$3.600
|
$3.800
|
$4.000
|
|
|
ASPH (RC-250)
|
GAL
|
5,552.000
|
$4.500
|
$4.200
|
$5.050
|
$4.390
|
$6.000
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
370.000
|
$140.000
|
$150.000
|
$160.000
|
$168.870
|
$120.000
|
|
|
AGGR(TY-PD GR-4 OR TY-PL GR-4)
|
CY
|
340.000
|
$135.000
|
$150.000
|
$150.000
|
$174.230
|
$120.000
|
|
|
AGGR (TY-PD GR-5 OR TY-PL GR-5)
|
CY
|
296.000
|
$160.000
|
$150.000
|
$160.000
|
$156.300
|
$120.000
|
|
|
CUT & RESTORING PAV
|
SY
|
25.000
|
$195.000
|
$65.000
|
$115.000
|
$175.000
|
$100.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
28.000
|
$240.000
|
$160.000
|
$190.000
|
$250.000
|
$200.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
20.000
|
$1,300.000
|
$1,300.000
|
$1,000.000
|
$500.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
120.000
|
$60.000
|
$52.000
|
$136.000
|
$60.000
|
$60.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
26.000
|
$100.000
|
$158.000
|
$255.000
|
$110.000
|
$85.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$4,033.000
|
$4,800.000
|
$5,500.000
|
$6,000.000
|
$6,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
2.000
|
$650.000
|
$850.000
|
$725.000
|
$700.000
|
$660.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
12.000
|
$790.000
|
$900.000
|
$825.000
|
$800.000
|
$770.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
1.000
|
$2,640.000
|
$2,000.000
|
$1,500.000
|
$2,400.000
|
$2,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,420.000
|
$2,000.000
|
$1,480.000
|
$2,500.000
|
$3,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$2,600.000
|
$2,300.000
|
$1,900.000
|
$2,800.000
|
$4,000.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$2,500.000
|
$1,300.000
|
$3,200.000
|
$2,000.000
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
131.000
|
$17.800
|
$22.000
|
$75.000
|
$25.000
|
$15.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$61,572.450
|
$145,000.000
|
$40,000.000
|
$256,250.000
|
$150,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$2,500.000
|
$3,500.000
|
$4,600.000
|
$15,350.000
|
$21,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
720.000
|
$30.000
|
$26.000
|
$22.000
|
$30.000
|
$30.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
25.000
|
$125.000
|
$68.000
|
$225.000
|
$113.390
|
$200.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$3.000
|
$3.000
|
$3.050
|
$5.000
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$1.150
|
$1.000
|
$1.300
|
$2.000
|
$1.200
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
300.000
|
$8.000
|
$5.000
|
$5.150
|
$10.000
|
$6.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$0.650
|
$1.000
|
$3.150
|
$1.000
|
$3.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
845.000
|
$40.000
|
$34.000
|
$32.000
|
$57.750
|
$60.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
695.000
|
$29.400
|
$27.000
|
$40.000
|
$28.880
|
$30.000
|
|
|
TURNOUTS (ACP)
|
SY
|
440.000
|
$42.000
|
$29.000
|
$38.000
|
$28.880
|
$30.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
54.000
|
$85.000
|
$100.000
|
$140.000
|
$100.000
|
$125.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
20.000
|
$240.000
|
$220.000
|
$230.000
|
$400.000
|
$250.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
1.000
|
$364.000
|
$240.000
|
$250.000
|
$400.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
1.000
|
$363.000
|
$320.000
|
$335.000
|
$400.000
|
$400.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
22.000
|
$66.000
|
$60.000
|
$65.000
|
$75.000
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
140.000
|
$3.900
|
$4.000
|
$4.400
|
$4.000
|
$5.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
2,100.000
|
$0.550
|
$0.200
|
$0.220
|
$0.200
|
$0.250
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
19,170.000
|
$0.550
|
$0.200
|
$0.220
|
$0.200
|
$0.250
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
1,535.000
|
$1.000
|
$1.000
|
$1.000
|
$2.290
|
$2.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
140.000
|
$6.000
|
$5.800
|
$6.050
|
$5.500
|
$7.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
28,624.000
|
$0.450
|
$0.400
|
$0.400
|
$0.370
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,100.000
|
$0.500
|
$0.550
|
$0.550
|
$0.500
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
19,170.000
|
$0.470
|
$0.400
|
$0.410
|
$0.370
|
$0.400
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
336.000
|
$4.500
|
$4.000
|
$3.650
|
$3.300
|
$4.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$100.000
|
$125.000
|
$135.000
|
$939.290
|
$200.000
|
|
Totals: |
$1,293,021.360
|
$1,287,284.820
|
$1,298,128.330
|
$1,781,328.872
|
$1,811,111.800
|