PREPARING ROW
|
STA
|
6.500
|
$4,000.000
|
$5,000.000
|
$4,000.000
|
$14,500.000
|
$30,000.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
300.000
|
$15.000
|
$18.000
|
$60.000
|
$30.000
|
$20.000
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
245.000
|
$20.000
|
$18.000
|
$65.000
|
$35.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
300.000
|
$15.000
|
$22.000
|
$55.000
|
$44.000
|
$35.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY B)
|
CY
|
1,143.000
|
$50.000
|
$18.000
|
$65.000
|
$40.000
|
$35.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
12,597.000
|
$2.000
|
$0.700
|
$0.750
|
$0.520
|
$1.000
|
|
|
VEGETATIVE WATERING
|
MG
|
116.200
|
$20.000
|
$50.000
|
$10.000
|
$65.270
|
$50.000
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$100.000
|
$100.000
|
$90.000
|
$99.620
|
$150.000
|
|
|
D-GR HMA(SQ) TY-B PG64-22
|
TON
|
767.000
|
$95.000
|
$159.000
|
$120.000
|
$95.000
|
$130.000
|
|
|
TACK COAT
|
GAL
|
125.000
|
$2.000
|
$20.000
|
$15.000
|
$4.460
|
$6.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
704.000
|
$30.000
|
$10.000
|
$24.000
|
$23.060
|
$10.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
3,340.000
|
$30.000
|
$52.000
|
$52.000
|
$51.880
|
$55.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
148.300
|
$500.000
|
$600.000
|
$520.000
|
$569.050
|
$550.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
26.900
|
$300.000
|
$165.000
|
$240.000
|
$298.640
|
$185.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
64.000
|
$600.000
|
$550.000
|
$430.000
|
$432.330
|
$450.000
|
|
|
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
|
LF
|
6.000
|
$550.000
|
$550.000
|
$510.000
|
$507.270
|
$550.000
|
|
|
CONC BOX CULV (4 FT X 2 FT)(EXTEND)
|
LF
|
6.000
|
$600.000
|
$600.000
|
$510.000
|
$507.270
|
$550.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
121.000
|
$700.000
|
$625.000
|
$640.000
|
$639.860
|
$650.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)(EXTEND)
|
LF
|
20.000
|
$500.000
|
$685.000
|
$580.000
|
$576.450
|
$600.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
116.000
|
$800.000
|
$800.000
|
$780.000
|
$778.200
|
$700.000
|
|
|
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
|
LF
|
181.500
|
$1,000.000
|
$825.000
|
$930.000
|
$922.310
|
$750.000
|
|
|
CONC BOX CULV (8 FT X 2 FT)(EXTEND)
|
LF
|
9.000
|
$1,000.000
|
$875.000
|
$870.000
|
$870.430
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
20.000
|
$75.000
|
$125.000
|
$120.000
|
$115.290
|
$95.000
|
|
|
WINGWALL (FW - 0) (HW=3 FT)
|
EA
|
1.000
|
$4,500.000
|
$6,500.000
|
$6,400.000
|
$6,340.910
|
$8,500.000
|
|
|
WINGWALL (FW - 0) (HW=7 FT)
|
EA
|
2.000
|
$20,000.000
|
$12,000.000
|
$16,000.000
|
$16,140.500
|
$16,000.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
2.000
|
$12,000.000
|
$21,000.000
|
$22,000.000
|
$21,616.740
|
$20,000.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(3:1)(C)
|
EA
|
13.000
|
$5,000.000
|
$7,700.000
|
$6,600.000
|
$6,225.620
|
$7,500.000
|
|
|
SET (TY I)(S=3 FT)(HW= 4 FT)(3:1)(C)
|
EA
|
3.000
|
$4,500.000
|
$9,400.000
|
$9,000.000
|
$9,015.620
|
$9,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$4,500.000
|
$9,000.000
|
$7,000.000
|
$6,225.620
|
$7,500.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(3:1) (P)
|
EA
|
11.000
|
$5,500.000
|
$9,200.000
|
$9,900.000
|
$9,453.720
|
$10,000.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
4.000
|
$9,000.000
|
$9,600.000
|
$9,000.000
|
$6,485.020
|
$8,500.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
8.000
|
$16,000.000
|
$12,200.000
|
$11,500.000
|
$9,914.880
|
$12,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 7 FT)(3:1) (C)
|
EA
|
6.000
|
$20,000.000
|
$12,500.000
|
$13,100.000
|
$12,105.380
|
$15,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 3 FT)(3:1) (C)
|
EA
|
2.000
|
$5,000.000
|
$11,500.000
|
$14,500.000
|
$12,681.820
|
$15,000.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,000.000
|
$675.000
|
$950.000
|
$922.320
|
$1,000.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
24.000
|
$1,500.000
|
$1,025.000
|
$1,200.000
|
$1,152.890
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
25.000
|
$1,400.000
|
$1,025.000
|
$1,200.000
|
$1,152.890
|
$1,500.000
|
|
|
SET (TY II) (24 IN) (CMP) (4: 1) (P)
|
EA
|
1.000
|
$2,000.000
|
$1,250.000
|
$1,300.000
|
$1,268.180
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
26.000
|
$1,500.000
|
$1,500.000
|
$1,500.000
|
$1,498.760
|
$1,850.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,550.000
|
$1,300.000
|
$1,268.180
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,500.000
|
$6,400.000
|
$4,700.000
|
$4,611.570
|
$3,000.000
|
|
|
SET (TY II) (DES 1) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$3,500.000
|
$1,200.000
|
$1,152.900
|
$3,000.000
|
|
|
SET (TY II) (DES 2) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$4,000.000
|
$1,400.000
|
$1,383.470
|
$3,000.000
|
|
|
SET (TY II) (DES 3) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,500.000
|
$4,500.000
|
$2,400.000
|
$2,305.790
|
$5,000.000
|
|
|
SET (TY II) (DES 6) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$2,000.000
|
$16,000.000
|
$5,200.000
|
$5,188.020
|
$6,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
4.000
|
$2,500.000
|
$1,400.000
|
$2,900.000
|
$2,882.230
|
$3,000.000
|
|
|
CLEAN EXIST CULVERTS
|
CY
|
21.230
|
$90.000
|
$350.000
|
$175.000
|
$172.930
|
$200.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$325.000
|
$150.000
|
$600.000
|
$576.450
|
$1,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
55.000
|
$1,600.000
|
$250.000
|
$600.000
|
$576.450
|
$1,000.000
|
|
|
REMOV STR (PIPE)
|
LF
|
66.000
|
$16.000
|
$25.000
|
$18.000
|
$17.290
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
15.000
|
$1,600.000
|
$200.000
|
$75.000
|
$74.940
|
$150.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$239,265.700
|
$229,000.000
|
$200,000.000
|
$240,000.000
|
$265,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
15.000
|
$8,000.000
|
$5,000.000
|
$8,780.000
|
$15,000.000
|
$8,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
725.000
|
$40.000
|
$33.000
|
$35.000
|
$41.500
|
$30.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
725.000
|
$10.000
|
$10.000
|
$15.000
|
$14.990
|
$15.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,600.000
|
$3.500
|
$3.500
|
$3.500
|
$2.880
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,600.000
|
$1.000
|
$1.150
|
$1.200
|
$1.150
|
$2.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
1,350.000
|
$3.000
|
$3.050
|
$3.250
|
$4.040
|
$18.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
1,350.000
|
$1.000
|
$1.000
|
$1.000
|
$1.150
|
$9.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
120.000
|
$30.000
|
$55.000
|
$200.000
|
$45.000
|
$25.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
2,625.000
|
$0.500
|
$2.500
|
$3.500
|
$3.120
|
$1.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
250.000
|
$25.000
|
$30.000
|
$26.000
|
$23.460
|
$25.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
50.000
|
$30.000
|
$29.000
|
$33.000
|
$40.350
|
$35.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
200.000
|
$3.000
|
$3.500
|
$4.000
|
$3.460
|
$3.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$16,000.000
|
$2,860.000
|
$3,400.000
|
$3,401.030
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$220.150
|
$340.000
|
$288.220
|
$1,500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$1,000.000
|
$638.000
|
$670.000
|
$668.680
|
$850.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
29.000
|
$1,000.000
|
$473.000
|
$500.000
|
$495.740
|
$850.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
59.000
|
$85.000
|
$88.000
|
$140.000
|
$138.350
|
$100.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y
|
EA
|
67.000
|
$1.000
|
$7.000
|
$6.000
|
$1.350
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
5,250.000
|
$0.500
|
$1.150
|
$0.700
|
$0.750
|
$1.000
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
5,250.000
|
$0.500
|
$1.150
|
$0.700
|
$0.750
|
$1.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
67.000
|
$3.000
|
$8.000
|
$12.000
|
$0.580
|
$15.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
10,500.000
|
$0.500
|
$1.000
|
$0.900
|
$0.580
|
$1.000
|
|
|
HIGH FRICTION SURFACE COURSE
|
SY
|
7,000.000
|
$25.650
|
$25.000
|
$23.000
|
$24.000
|
$30.000
|
|
|
TMA (STATIONARY)
|
DAY
|
316.000
|
$175.000
|
$225.000
|
$235.000
|
$270.810
|
$350.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
2.000
|
$200.000
|
$1,000.000
|
$1,000.000
|
$998.450
|
$850.000
|
|
Totals: |
$2,378,350.900
|
$2,299,229.000
|
$2,388,977.000
|
$2,481,500.044
|
$2,740,464.500
|