|
|
PREPARING ROW
|
STA
|
5.000
|
$6,000.000
|
$1,000.000
|
$6,500.000
|
$2,000.000
|
$2,100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
466.000
|
$11.000
|
$10.000
|
$30.000
|
$23.500
|
$43.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY A)
|
CY
|
60.000
|
$11.000
|
$15.000
|
$50.000
|
$53.000
|
$80.000
|
|
|
EMBANKMENT (VEHICLE)(DENS CONT)(TY B)
|
CY
|
9,240.000
|
$11.000
|
$8.850
|
$25.000
|
$22.250
|
$26.500
|
|
|
BACKFILL (TY A OR B)
|
STA
|
207.000
|
$210.000
|
$145.000
|
$100.000
|
$100.000
|
$315.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
7,294.000
|
$0.120
|
$0.250
|
$0.220
|
$0.050
|
$0.210
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
7,294.000
|
$0.120
|
$0.250
|
$0.220
|
$0.050
|
$0.210
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
14,586.000
|
$0.120
|
$0.250
|
$0.220
|
$0.250
|
$0.750
|
|
|
VEGETATIVE WATERING
|
MG
|
129.000
|
$25.000
|
$25.000
|
$10.000
|
$50.000
|
$26.500
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY C)
|
SY
|
390.000
|
$1.500
|
$3.540
|
$3.200
|
$3.200
|
$3.050
|
|
|
CEMENT
|
TON
|
262.000
|
$175.000
|
$200.600
|
$170.000
|
$169.000
|
$175.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
24,278.000
|
$4.250
|
$2.350
|
$2.500
|
$2.600
|
$3.150
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,071.000
|
$3.750
|
$3.540
|
$3.500
|
$2.500
|
$4.300
|
|
|
EMULS ASPH (EROSN CONT)(MULTI)
|
GAL
|
14,586.000
|
$4.000
|
$2.480
|
$3.000
|
$2.750
|
$3.850
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(8")
|
SY
|
11,156.000
|
$42.000
|
$56.300
|
$48.000
|
$41.500
|
$52.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 2")
|
SY
|
3,334.000
|
$4.850
|
$2.500
|
$3.500
|
$3.700
|
$4.050
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
61.000
|
$30.000
|
$35.400
|
$1.100
|
$1.000
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
492.000
|
$30.000
|
$76.700
|
$65.000
|
$63.500
|
$61.500
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
50.000
|
$120.000
|
$65.250
|
$200.000
|
$212.000
|
$205.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
45.280
|
$400.000
|
$708.000
|
$650.000
|
$636.000
|
$615.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
8.000
|
$550.000
|
$690.300
|
$530.000
|
$550.000
|
$520.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
13.000
|
$575.000
|
$914.500
|
$640.000
|
$650.000
|
$615.000
|
|
|
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$700.000
|
$1,014.800
|
$950.000
|
$1,000.000
|
$920.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
|
LF
|
3.000
|
$700.000
|
$1,150.500
|
$1,300.000
|
$1,300.000
|
$1,200.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)(EXTEND)
|
LF
|
18.000
|
$1,000.000
|
$1,180.000
|
$1,000.000
|
$1,000.000
|
$930.000
|
|
|
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
|
LF
|
7.000
|
$1,200.000
|
$1,357.000
|
$1,400.000
|
$1,500.000
|
$1,300.000
|
|
|
WINGWALL (PW - 2) (HW=5 FT)
|
EA
|
2.000
|
$9,000.000
|
$15,104.000
|
$8,600.000
|
$8,800.000
|
$8,400.000
|
|
|
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
|
EA
|
2.000
|
$8,500.000
|
$6,490.000
|
$3,700.000
|
$3,800.000
|
$3,600.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
3.000
|
$9,000.000
|
$10,885.500
|
$6,500.000
|
$6,600.000
|
$6,300.000
|
|
|
SET (TY I)(S= 4 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$10,915.000
|
$8,200.000
|
$8,300.000
|
$8,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
1.000
|
$8,200.000
|
$20,296.000
|
$13,000.000
|
$13,000.000
|
$12,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
4.000
|
$10,500.000
|
$12,714.500
|
$8,600.000
|
$9,000.000
|
$8,400.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
15.000
|
$1,600.000
|
$1,180.000
|
$850.000
|
$900.000
|
$820.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$390,853.410
|
$241,890.000
|
$280,000.000
|
$400,000.000
|
$425,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$6,000.000
|
$4,897.000
|
$6,500.000
|
$12,000.000
|
$17,000.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
77.000
|
$10.000
|
$10.000
|
$10.000
|
$8.700
|
$10.000
|
|
|
TEMP PAVED FLUME (INSTALL)
|
SY
|
216.000
|
$35.000
|
$22.420
|
$20.000
|
$20.250
|
$19.500
|
|
|
TEMP PAVED FLUME (REMOVE)
|
SY
|
216.000
|
$15.000
|
$10.000
|
$10.000
|
$47.750
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
330.000
|
$3.500
|
$3.540
|
$3.500
|
$3.200
|
$3.050
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
330.000
|
$1.500
|
$1.180
|
$1.100
|
$1.100
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
780.000
|
$4.000
|
$3.780
|
$3.400
|
$3.400
|
$3.250
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
780.000
|
$1.000
|
$1.060
|
$1.000
|
$0.950
|
$0.920
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2) (6:1)
|
LF
|
77.000
|
$35.000
|
$35.400
|
$43.000
|
$42.500
|
$48.500
|
|
|
INTERSECTIONS (ACP)
|
SY
|
621.000
|
$32.000
|
$24.660
|
$11.000
|
$44.000
|
$100.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
71.000
|
$30.000
|
$24.660
|
$46.000
|
$46.000
|
$100.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
532.000
|
$23.000
|
$10.500
|
$12.000
|
$23.250
|
$22.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
69,620.000
|
$0.180
|
$0.130
|
$0.210
|
$0.080
|
$0.110
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
34,785.000
|
$0.180
|
$0.130
|
$0.210
|
$0.080
|
$0.120
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
500.000
|
$25.000
|
$36.580
|
$25.000
|
$30.000
|
$24.500
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.500
|
$4.720
|
$5.500
|
$2.000
|
$5.100
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,700.000
|
$4,130.000
|
$2,800.000
|
$3,500.000
|
$2,700.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$300.000
|
$472.000
|
$320.000
|
$215.000
|
$305.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
6.000
|
$750.000
|
$1,062.000
|
$790.000
|
$600.000
|
$665.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
6.000
|
$400.000
|
$590.000
|
$790.000
|
$550.000
|
$565.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
12.000
|
$35.000
|
$41.300
|
$25.000
|
$28.000
|
$24.500
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
13.000
|
$85.000
|
$165.200
|
$220.000
|
$68.000
|
$71.500
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
915.000
|
$2.500
|
$1.000
|
$0.550
|
$1.500
|
$1.150
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
732.000
|
$1.000
|
$3.480
|
$0.480
|
$1.300
|
$1.300
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
2,799.000
|
$0.450
|
$0.460
|
$0.450
|
$0.400
|
$0.360
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
73,180.000
|
$0.450
|
$0.410
|
$0.350
|
$0.400
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,922.000
|
$0.300
|
$0.460
|
$0.350
|
$0.400
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
56,940.000
|
$0.300
|
$0.410
|
$0.350
|
$0.400
|
$0.380
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$450.000
|
$572.300
|
$500.000
|
$500.000
|
$455.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
70.000
|
$3.500
|
$4.720
|
$4.500
|
$4.000
|
$3.600
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
915.000
|
$3.000
|
$4.310
|
$4.500
|
$4.000
|
$3.600
|
|
|
D-GR HMA TY-B SAC-B PG64-22
|
TON
|
6,232.000
|
$81.000
|
$76.000
|
$76.000
|
$70.000
|
$79.000
|
|
|
D-GR HMA TY-D SAC-B PG70-28
|
TON
|
16,362.000
|
$95.000
|
$85.500
|
$84.000
|
$88.000
|
$90.000
|
|
|
D-GR HMA TY-D PG70-28 (LEVEL-UP)
|
TON
|
4,800.000
|
$100.000
|
$90.000
|
$88.000
|
$85.000
|
$105.000
|
|
|
BONDING COURSE
|
GAL
|
11,900.000
|
$3.000
|
$2.750
|
$4.000
|
$2.250
|
$2.800
|
|
|
TMA (STATIONARY)
|
DAY
|
150.000
|
$200.000
|
$25.000
|
$265.000
|
$75.000
|
$245.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
15.000
|
$225.000
|
$1.000
|
$630.000
|
$85.000
|
$970.000
|
|
Totals: |
$4,359,387.490
|
$4,045,567.020
|
$4,120,612.290
|
$4,155,775.880
|
$4,739,339.890
|