PREPARING ROW
|
STA
|
37.000
|
$4,000.000
|
$8,072.020
|
$4,000.000
|
$3,000.000
|
$6,000.000
|
$13,246.220
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
2,905.000
|
$15.000
|
$25.000
|
$10.000
|
$10.000
|
$15.000
|
$10.970
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
1,595.000
|
$10.900
|
$22.000
|
$20.000
|
$33.000
|
$30.000
|
$11.110
|
|
|
EXCAVATION (CHANNEL)
|
CY
|
469.000
|
$16.000
|
$36.000
|
$20.000
|
$50.000
|
$30.000
|
$25.200
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
4,193.000
|
$12.000
|
$40.000
|
$25.000
|
$44.000
|
$30.000
|
$12.330
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
AC
|
1.352
|
$530.000
|
$5,000.000
|
$2,000.000
|
$1,465.000
|
$1,600.000
|
$1,149.300
|
|
|
DRILL SEEDING (TEMP)(WARM OR COOL)
|
AC
|
1.352
|
$430.000
|
$5,000.000
|
$2,000.000
|
$1,410.000
|
$1,600.000
|
$751.060
|
|
|
VEGETATIVE WATERING
|
MG
|
54.000
|
$27.000
|
$255.000
|
$1.000
|
$40.000
|
$100.000
|
$132.460
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
6,031.000
|
$1.750
|
$1.500
|
$3.000
|
$2.100
|
$3.000
|
$1.250
|
|
|
CEMENT
|
TON
|
108.000
|
$170.000
|
$300.000
|
$300.000
|
$285.000
|
$280.000
|
$264.050
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
9,836.000
|
$3.000
|
$5.000
|
$10.000
|
$10.000
|
$10.000
|
$3.140
|
|
|
PRIME COAT (MC-30)
|
GAL
|
2,460.000
|
$5.500
|
$8.000
|
$10.000
|
$7.000
|
$7.000
|
$9.270
|
|
|
CEM STABIL BKFL
|
CY
|
590.000
|
$162.000
|
$200.000
|
$250.000
|
$273.000
|
$240.000
|
$149.470
|
|
|
TEMPORARY SPL SHORING
|
SF
|
1,125.000
|
$23.000
|
$40.000
|
$45.000
|
$70.000
|
$25.000
|
$29.220
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
392.000
|
$140.000
|
$155.000
|
$145.000
|
$86.000
|
$120.000
|
$357.780
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,224.000
|
$250.000
|
$280.000
|
$275.000
|
$287.000
|
$280.000
|
$517.040
|
|
|
DRILL SHAFT (48 IN)
|
LF
|
465.000
|
$400.000
|
$500.000
|
$500.000
|
$532.000
|
$490.000
|
$991.020
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
199.600
|
$1,250.000
|
$800.000
|
$1,000.000
|
$1,450.000
|
$1,800.000
|
$1,433.780
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
105.500
|
$1,500.000
|
$1,300.000
|
$1,000.000
|
$1,550.000
|
$2,000.000
|
$2,339.160
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
154.000
|
$1,200.000
|
$1,100.000
|
$1,200.000
|
$1,300.000
|
$2,000.000
|
$1,372.530
|
|
|
CL C CONC (HEADWALL)
|
CY
|
44.000
|
$1,000.000
|
$1,000.000
|
$1,600.000
|
$1,550.000
|
$1,500.000
|
$1,252.700
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
36,040.000
|
$22.000
|
$24.000
|
$25.000
|
$32.250
|
$32.000
|
$45.460
|
|
|
BRIDGE SIDEWALK (HPC)
|
SF
|
3,249.000
|
$11.750
|
$12.000
|
$15.000
|
$17.500
|
$18.000
|
$13.640
|
|
|
APPROACH SLAB (HPC)
|
CY
|
203.300
|
$675.000
|
$700.000
|
$1,000.000
|
$700.000
|
$850.000
|
$3,597.800
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
4,309.660
|
$190.000
|
$265.000
|
$340.000
|
$420.000
|
$280.000
|
$323.800
|
|
|
PENETRATING CONCRETE SURFACE TREATMENT
|
SY
|
226.400
|
$9.000
|
$30.000
|
$40.000
|
$25.000
|
$30.000
|
$33.120
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
821.000
|
$93.490
|
$174.000
|
$145.000
|
$142.000
|
$110.000
|
$107.290
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
2,943.000
|
$147.000
|
$122.000
|
$145.000
|
$135.000
|
$135.000
|
$202.950
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
134.000
|
$525.000
|
$500.000
|
$600.000
|
$975.000
|
$550.000
|
$563.930
|
|
|
STR STEEL (MISCELLANEOUS BRIDGE)
|
LB
|
168.000
|
$15.000
|
$30.000
|
$100.000
|
$24.000
|
$18.000
|
$17.880
|
|
|
RAIL (TY T223)(HPC)
|
LF
|
1,733.000
|
$155.000
|
$165.000
|
$150.000
|
$200.000
|
$150.000
|
$174.890
|
|
|
RAIL (TY C223)(HPC)
|
LF
|
397.000
|
$200.000
|
$220.000
|
$150.000
|
$250.000
|
$180.000
|
$238.430
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
234.000
|
$175.000
|
$190.000
|
$170.000
|
$235.000
|
$220.000
|
$199.940
|
|
|
GABIONS (3' X 3')(GALV)
|
CY
|
20.000
|
$265.000
|
$365.000
|
$300.000
|
$400.000
|
$300.000
|
$365.720
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
45.000
|
$92.000
|
$155.000
|
$100.000
|
$160.000
|
$125.000
|
$132.340
|
|
|
HEADWALL (CH - PW - 0) (DIA= 42 IN)
|
EA
|
1.000
|
$9,000.000
|
$10,500.000
|
$70,000.000
|
$10,500.000
|
$6,000.000
|
$12,364.560
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,700.000
|
$2,500.000
|
$5,000.000
|
$3,200.000
|
$1,200.000
|
$2,318.090
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,400.000
|
$3,000.000
|
$5,000.000
|
$3,450.000
|
$1,500.000
|
$3,001.590
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$150,000.000
|
$84,000.000
|
$300,000.000
|
$220,000.000
|
$600,000.000
|
$249,348.960
|
|
|
REMOV STR (RAILROAD CROSSING)
|
EA
|
1.000
|
$5,000.000
|
$10,000.000
|
$2,000.000
|
$14,500.000
|
$1,500.000
|
$11,921.590
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$593,698.000
|
$780,000.000
|
$700,000.000
|
$842,000.000
|
$1,000,000.000
|
$1,072,943.430
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
$7,200.000
|
$12,000.000
|
$5,000.000
|
$2,200.000
|
$3,000.000
|
$15,895.460
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$35.000
|
$46.000
|
$1.000
|
$35.000
|
$50.000
|
$40.260
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$11.500
|
$17.000
|
$1.000
|
$20.000
|
$10.000
|
$13.260
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
6,769.000
|
$2.800
|
$5.000
|
$1.000
|
$3.400
|
$3.700
|
$4.070
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
6,769.000
|
$0.800
|
$1.000
|
$1.000
|
$1.250
|
$1.300
|
$0.970
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
160.000
|
$5.000
|
$7.000
|
$5.000
|
$8.500
|
$9.500
|
$6.030
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
160.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
$1.250
|
$1.800
|
|
|
DRIVEWAYS (BASE)
|
SY
|
414.000
|
$20.000
|
$150.000
|
$65.000
|
$45.000
|
$25.000
|
$27.780
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,826.000
|
$28.000
|
$32.000
|
$25.000
|
$22.000
|
$30.000
|
$31.950
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$1,900.000
|
$2,400.000
|
$1,600.000
|
$2,000.000
|
$1,800.000
|
$2,681.210
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,300.000
|
$2,100.000
|
$1,500.000
|
$1,450.000
|
$1,500.000
|
$1,738.860
|
|
|
MTL BM GD FEN TRANS (NON - SYM)
|
EA
|
3.000
|
$1,200.000
|
$1,200.000
|
$1,000.000
|
$950.000
|
$900.000
|
$1,238.680
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
775.000
|
$2.600
|
$5.000
|
$1.000
|
$2.500
|
$5.000
|
$2.890
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
12.000
|
$275.000
|
$200.000
|
$400.000
|
$150.000
|
$400.000
|
$285.080
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,250.000
|
$3,700.000
|
$3,000.000
|
$2,950.000
|
$3,000.000
|
$4,015.860
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
1.000
|
$9,375.000
|
$9,300.100
|
$12,000.000
|
$10,375.000
|
$11,000.000
|
$11,544.010
|
|
|
WIRE FENCE (TY C)
|
LF
|
155.000
|
$18.000
|
$30.000
|
$20.000
|
$20.000
|
$18.000
|
$19.660
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(P)
|
EA
|
9.000
|
$525.000
|
$776.000
|
$850.000
|
$725.000
|
$650.000
|
$761.660
|
|
|
IN SM RD SN SUP&AM TYTWT(1)UA(T)
|
EA
|
4.000
|
$580.000
|
$900.000
|
$850.000
|
$750.000
|
$800.000
|
$960.350
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$30.000
|
$29.000
|
$20.000
|
$15.000
|
$25.000
|
$33.120
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
12.000
|
$28.000
|
$38.000
|
$20.000
|
$20.000
|
$5.000
|
$196.870
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
34.000
|
$39.000
|
$89.000
|
$40.000
|
$40.000
|
$55.000
|
$99.350
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
7,572.000
|
$0.300
|
$1.000
|
$1.250
|
$1.000
|
$1.300
|
$1.180
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
7,572.000
|
$0.310
|
$1.000
|
$1.250
|
$1.000
|
$1.300
|
$1.180
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
96.000
|
$3.200
|
$8.000
|
$15.000
|
$5.000
|
$12.000
|
$7.950
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
4,324.000
|
$0.100
|
$0.740
|
$1.500
|
$1.000
|
$1.300
|
$0.730
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
3,246.000
|
$100.000
|
$180.000
|
$150.000
|
$128.000
|
$135.000
|
$169.550
|
|
|
D-GR HMA TY-D SAC-B PG64-22
|
TON
|
1,083.000
|
$300.000
|
$180.000
|
$160.000
|
$143.000
|
$145.000
|
$189.420
|
|
|
INSTALL BRIDGE IDENTIFICATION NUMBERS
|
EA
|
6.000
|
$350.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
$876.000
|
|
|
INSTALL FTB
|
LF
|
735.000
|
$100.000
|
$80.000
|
$60.000
|
$125.000
|
$80.000
|
$76.170
|
|
|
REMOVE FTB
|
LF
|
735.000
|
$16.000
|
$20.000
|
$20.000
|
$12.000
|
$5.000
|
$33.770
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$45,000.000
|
$50,000.000
|
$12,500.000
|
$20,000.000
|
$8,610.040
|
|
Totals: |
$6,563,411.130
|
$7,845,445.000
|
$8,424,229.400
|
$8,997,163.150
|
$9,737,977.600
|
$11,161,121.341
|