PREPARING ROW
|
STA
|
10.000
|
$2,500.000
|
$3,250.000
|
$1,200.000
|
$3,000.000
|
$1,100.000
|
$3,100.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
2,114.000
|
$20.000
|
$14.500
|
$39.000
|
$30.000
|
$16.000
|
$52.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY B)
|
CY
|
6,653.000
|
$15.000
|
$15.000
|
$29.000
|
$18.000
|
$30.000
|
$65.500
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
46,853.000
|
$0.120
|
$0.050
|
$0.050
|
$0.040
|
$0.090
|
$0.050
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
46,853.000
|
$0.120
|
$0.070
|
$0.060
|
$0.040
|
$0.090
|
$0.060
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
93,706.000
|
$0.180
|
$0.080
|
$0.070
|
$0.100
|
$0.120
|
$0.080
|
|
|
VEGETATIVE WATERING
|
MG
|
794.000
|
$20.000
|
$32.000
|
$32.000
|
$10.000
|
$20.000
|
$27.500
|
|
|
CEMENT
|
TON
|
338.000
|
$160.000
|
$138.750
|
$175.000
|
$160.000
|
$145.000
|
$170.000
|
|
|
CEMENT TREAT (SUBGRADE) (8")
|
SY
|
37,072.000
|
$3.000
|
$2.390
|
$5.500
|
$4.700
|
$3.500
|
$5.400
|
|
|
PRIME COAT (MC-30)
|
GAL
|
11,134.000
|
$5.000
|
$3.650
|
$3.400
|
$2.800
|
$4.000
|
$4.200
|
|
|
D-GR HMA TY-B PG64-22
|
TON
|
7,148.000
|
$60.000
|
$58.500
|
$55.000
|
$69.000
|
$72.000
|
$70.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
14,426.000
|
$70.000
|
$70.250
|
$73.000
|
$82.000
|
$79.800
|
$82.500
|
|
|
D-GR HMA TY-D PG 70-22 (LEVEL-UP)
|
TON
|
7,528.000
|
$75.000
|
$73.250
|
$73.000
|
$79.000
|
$80.600
|
$78.500
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
10,308.000
|
$50.000
|
$27.000
|
$27.500
|
$26.000
|
$30.800
|
$35.500
|
|
|
PLAN & TEXT ASPH CONC PAV(0" TO 4")
|
SY
|
2,448.000
|
$4.000
|
$5.400
|
$5.500
|
$3.500
|
$3.850
|
$5.550
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
39.000
|
$450.000
|
$565.000
|
$685.000
|
$480.000
|
$600.000
|
$485.000
|
|
|
RETROFIT RAIL (TY T131RC)
|
LF
|
190.000
|
$130.000
|
$180.000
|
$135.000
|
$210.000
|
$206.000
|
$145.000
|
|
|
CMP (GAL STL 12 IN)
|
LF
|
84.000
|
$100.000
|
$41.250
|
$70.000
|
$38.000
|
$45.000
|
$37.500
|
|
|
CMP (GAL STL 18 IN)
|
LF
|
86.000
|
$120.000
|
$48.500
|
$84.500
|
$70.000
|
$55.000
|
$70.000
|
|
|
CMP (GAL STL 30 IN)
|
LF
|
103.000
|
$150.000
|
$54.500
|
$116.000
|
$95.000
|
$70.000
|
$97.000
|
|
|
SET (TY II) (12 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$1,200.000
|
$675.000
|
$850.000
|
$800.000
|
$800.000
|
$805.000
|
|
|
SET (TY II) (18 IN) (CMP) (6: 1) (P)
|
EA
|
8.000
|
$1,400.000
|
$850.000
|
$965.000
|
$1,000.000
|
$900.000
|
$1,000.000
|
|
|
SET (TY II) (21 IN) (CMP) (6: 1) (P)
|
EA
|
2.000
|
$1,600.000
|
$1,000.000
|
$1,175.000
|
$1,200.000
|
$1,050.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (CMP) (6: 1) (P)
|
EA
|
4.000
|
$2,000.000
|
$1,025.000
|
$1,200.000
|
$1,400.000
|
$1,100.000
|
$1,400.000
|
|
|
SET (TY II) (30 IN) (CMP) (6: 1) (P)
|
EA
|
6.000
|
$2,500.000
|
$1,850.000
|
$1,750.000
|
$3,200.000
|
$1,400.000
|
$3,200.000
|
|
|
REMOV STR (PIPE)
|
LF
|
260.000
|
$20.000
|
$13.500
|
$20.000
|
$11.000
|
$13.000
|
$11.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$353,922.680
|
$250,000.000
|
$165,000.000
|
$310,000.000
|
$400,000.000
|
$360,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$6,000.000
|
$2,800.000
|
$19,000.000
|
$8,000.000
|
$14,000.000
|
$26,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
200.000
|
$30.000
|
$26.500
|
$20.750
|
$25.000
|
$40.000
|
$22.500
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
200.000
|
$10.000
|
$21.000
|
$10.000
|
$5.000
|
$15.000
|
$11.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
4,000.000
|
$2.500
|
$2.250
|
$2.150
|
$2.600
|
$2.500
|
$2.300
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
4,000.000
|
$0.800
|
$0.480
|
$0.450
|
$0.200
|
$1.000
|
$0.480
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
3,000.000
|
$3.500
|
$1.800
|
$1.700
|
$3.000
|
$5.000
|
$1.800
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,000.000
|
$0.800
|
$0.370
|
$0.350
|
$0.300
|
$1.000
|
$0.380
|
|
|
DRIVEWAYS (CONC)
|
SY
|
57.000
|
$70.000
|
$64.000
|
$140.000
|
$100.000
|
$86.000
|
$97.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
1,104.000
|
$45.000
|
$11.000
|
$27.500
|
$35.000
|
$33.250
|
$49.500
|
|
|
TURNOUTS (ACP)
|
SY
|
1,329.000
|
$45.000
|
$24.500
|
$40.000
|
$33.000
|
$45.000
|
$37.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
4,133.000
|
$22.000
|
$11.250
|
$14.000
|
$18.000
|
$14.000
|
$21.000
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
42,080.000
|
$0.250
|
$0.110
|
$0.210
|
$0.250
|
$0.500
|
$0.170
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
300.000
|
$17.000
|
$19.000
|
$18.000
|
$21.000
|
$30.000
|
$19.500
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
4.000
|
$1,500.000
|
$1,590.000
|
$1,500.000
|
$1,800.000
|
$2,500.000
|
$1,600.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
400.000
|
$3.000
|
$8.500
|
$8.000
|
$2.500
|
$3.000
|
$8.600
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
4.000
|
$2,200.000
|
$2,325.000
|
$2,200.000
|
$2,200.000
|
$2,750.000
|
$2,400.000
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
19.000
|
$200.000
|
$212.000
|
$225.000
|
$210.000
|
$310.000
|
$240.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
3.000
|
$250.000
|
$237.000
|
$270.000
|
$240.000
|
$310.000
|
$290.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
2.000
|
$500.000
|
$531.000
|
$590.000
|
$530.000
|
$625.000
|
$635.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
2.000
|
$600.000
|
$531.000
|
$465.000
|
$530.000
|
$500.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
10.000
|
$600.000
|
$531.000
|
$525.000
|
$530.000
|
$550.000
|
$565.000
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
6.000
|
$400.000
|
$450.000
|
$395.000
|
$450.000
|
$400.000
|
$425.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
15.000
|
$400.000
|
$318.000
|
$235.000
|
$320.000
|
$350.000
|
$255.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
12.000
|
$100.000
|
$68.500
|
$60.000
|
$100.000
|
$100.000
|
$64.500
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
32.000
|
$65.000
|
$48.000
|
$110.000
|
$48.000
|
$75.000
|
$120.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
|
EA
|
12.000
|
$50.000
|
$16.000
|
$15.000
|
$16.000
|
$50.000
|
$27.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
30.000
|
$70.000
|
$48.000
|
$110.000
|
$48.000
|
$70.000
|
$120.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
|
LF
|
18,340.000
|
$0.200
|
$0.270
|
$0.240
|
$0.240
|
$0.540
|
$0.280
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
66,800.000
|
$0.200
|
$0.270
|
$0.210
|
$0.210
|
$0.540
|
$0.280
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
4,427.000
|
$1.000
|
$0.750
|
$1.000
|
$0.800
|
$1.240
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
84,180.000
|
$0.400
|
$0.370
|
$0.330
|
$0.330
|
$0.330
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
9,170.000
|
$0.400
|
$0.370
|
$0.400
|
$0.330
|
$0.350
|
$0.330
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
33,400.000
|
$0.400
|
$0.370
|
$0.330
|
$0.330
|
$0.330
|
$0.330
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
54.000
|
$15.000
|
$17.000
|
$11.000
|
$30.000
|
$16.500
|
$27.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
882.000
|
$4.000
|
$3.180
|
$3.500
|
$3.700
|
$6.600
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
42,570.000
|
$1.000
|
$0.670
|
$0.100
|
$0.300
|
$0.550
|
$0.770
|
|
Totals: |
$3,913,381.480
|
$3,310,004.480
|
$3,672,574.650
|
$3,874,197.540
|
$4,145,567.740
|
$4,669,765.710
|