ZAVALA US 83 (0037-02-060)

Items: 102

County: ZAVALA
Length: 1.1550 MILES
Highway: US 83
District: LAREDO
Control Number: 0037-02-060
DBE Goal: 0.0%
Project: BR 2B26(018)
Guaranty: $100,000.00
Time: 284 WORKING DAYS
Engineer's Estimate: $17,896,171.15
Date: 08/05/2026 1:00 PM CDT (6 weeks ago) Changed
Contract Number: 8263204
Type: BRIDGE REPLACEMENT
Project ID: A00136503
Contract Type: FEDERAL
Project Description: REPLACEMENT OF ON-SYSTEM BRIDGE US 83 AT NUECES RIVER
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (10)
E
Engineer's Estimate
$17,896,171.15
1
$13,786,606.52
Over/Under Est: -22.96% -$4,109,564.63
$14,520,387.56
Over/Under Est: -18.86% -$3,375,783.59
Amt Left: 5.32% $733,781.04
Over/Under Est: -10.2% -$1,825,069.32
Amt Left: 16.57% $2,284,495.31
Delta: -10.68% -$1,550,714.27
Over/Under Est: -9.91% -$1,773,553.15
Amt Left: 16.94% $2,336,011.48
Delta: -0.32% -$51,516.17
Over/Under Est: -9.27% -$1,659,355.29
Amt Left: 17.77% $2,450,209.34
Delta: -0.71% -$114,197.86
$17,454,137.59
Over/Under Est: -2.47% -$442,033.56
Amt Left: 26.6% $3,667,531.07
Delta: -7.50% -$1,217,321.73
$18,011,532.90
Over/Under Est: 0.64% $115,361.75
Amt Left: 30.65% $4,224,926.38
Delta: -3.19% -$557,395.31
Over/Under Est: 1.77% $316,800.05
Amt Left: 32.11% $4,426,364.68
Delta: -1.12% -$201,438.30
$19,455,980.23
Over/Under Est: 8.72% $1,559,809.08
Amt Left: 41.12% $5,669,373.71
Delta: -6.82% -$1,243,009.03
$21,284,802.93
Over/Under Est: 18.93% $3,388,631.78
Amt Left: 54.39% $7,498,196.41
Delta: -9.40% -$1,828,822.70

Bid Items & Bid Tabulations

102 Total 0 of 102
ZAVALA  |  US 83  |  LAREDO  |  0037-02-060  |  08/05/2026 1:00 PM CDT  |  $17,896,171.15  |  BR 2B26(018)  |  BRIDGE REPL  |  284 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
HUNTER INDUSTRIES, LTD.
ANDERSON COLUMBIA CO., INC.
E-Z BEL CONSTRUCTION, LLC
JAMES CONSTRUCTION GROUP, LLC
MCMILLEN, INC.
CK NEWBERRY, LLC
DELGADO'S CONTRACTORS, LLC
STX CIVIL
IOC COMPANY, LLC
PREPARING ROW
STA 61.000 $3,500.000 $1,000.000 $950.700 $2,700.000 $3,600.000 $24,030.930 $28,000.000 $1,000.000 $1,250.000 $434.360 $33,750.000
TREE PROTECTION (INSTALL)
EA 15.000 $250.000 $300.000 $1,080.000 $700.000 $550.000 $500.000 $685.330 $500.000 $200.000 $78.180 $300.000
TREE PROTECTION (REMOVE)
EA 15.000 $50.000 $100.000 $540.000 $500.000 $100.000 $100.000 $68.530 $250.000 $10.000 $12.410 $250.000
REMOV CONC (RIPRAP)
SY 700.000 $22.000 $20.000 $17.500 $16.000 $18.000 $17.370 $19.910 $30.000 $14.000 $12.200 $25.000
REMOV CONC (MISC)
CY 13.000 $130.000 $20.000 $463.500 $200.000 $17.500 $200.000 $422.870 $330.000 $100.000 $12.250 $150.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 18,680.000 $12.000 $6.000 $6.440 $7.000 $9.500 $5.450 $8.000 $6.500 $12.500 $6.800 $6.500
EXCAV (ROADWAY)
CY 24,332.000 $16.000 $12.000 $12.000 $10.000 $10.750 $7.170 $13.000 $25.000 $20.000 $9.200 $8.000
EMBANK (FNL)(DC)(TY C)
CY 53,856.000 $16.000 $26.500 $16.920 $18.000 $12.000 $16.000 $20.000 $25.000 $30.000 $47.730 $23.000
FURN & PLACE TOPSOIL (6")
SY 50,414.000 $1.000 $2.500 $2.720 $0.500 $1.750 $1.130 $2.000 $4.750 $5.000 $9.930 $2.470
DRILL SEED (PERM_RURAL_CLAY)
SY 50,414.000 $0.250 $0.320 $0.300 $0.320 $0.500 $0.300 $0.750 $0.300 $0.550 $0.170 $0.390
DRILL SEED (TEMP_WARM_COOL)
SY 39,470.000 $0.250 $0.300 $0.280 $0.300 $0.300 $0.280 $0.570 $0.300 $0.500 $0.100 $0.300
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 4,407.000 $1.000 $2.150 $2.000 $2.100 $2.000 $2.000 $4.000 $2.000 $5.000 $3.040 $4.580
PROOF ROLLING
HR 270.000 $150.000 $90.000 $77.000 $120.000 $105.000 $120.870 $150.000 $80.000 $50.000 $140.110 $75.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 4,503.000 $80.000 $68.000 $50.600 $78.000 $130.000 $33.140 $68.000 $100.000 $85.000 $91.180 $55.000
PRIME COAT(MC-30 OR AE-P)
GAL 5,296.000 $5.400 $5.250 $5.090 $6.000 $5.000 $5.060 $6.850 $6.000 $5.000 $6.560 $6.000
EMULS ASPH (EROSN CONT)(MULTI)
GAL 13,483.000 $2.000 $4.000 $3.680 $6.000 $5.000 $5.000 $8.220 $4.500 $15.000 $5.320 $6.000
D-GR HMA TY-B PG64-22
TON 11,416.000 $125.000 $110.250 $78.120 $106.000 $110.000 $106.170 $125.000 $115.000 $150.000 $125.740 $185.000
D-GR HMA TY-C SAC-A PG76-22
TON 2,746.000 $135.000 $150.150 $97.560 $138.000 $150.000 $144.590 $146.000 $160.000 $150.000 $163.310 $210.000
CUT & RESTORE ASPH PAVING
SY 20.000 $150.000 $200.000 $200.000 $100.000 $275.000 $320.000 $500.000 $105.000 $150.000 $95.320 $350.000
CEM STABIL BKFL
CY 442.000 $100.000 $155.000 $275.000 $140.000 $290.000 $201.640 $290.000 $140.000 $185.000 $153.890 $95.000
TRENCH EXCAVATION PROTECTION
LF 43.000 $8.000 $20.000 $15.000 $22.000 $2.000 $1.040 $170.000 $22.000 $15.000 $10.600 $1.000
TEMPORARY SPL SHORING
SF 2,489.000 $25.000 $25.000 $15.000 $24.000 $24.000 $82.440 $0.010 $25.000 $25.000 $16.880 $20.000
DRILL SHAFT (18 IN)
LF 180.000 $300.000 $350.000 $184.290 $180.000 $170.000 $188.110 $200.000 $185.000 $200.000 $186.150 $175.000
DRILL SHAFT (42 IN)
LF 500.000 $400.000 $550.000 $432.390 $390.000 $412.000 $443.320 $440.000 $400.000 $550.000 $434.360 $430.000
DRILL SHAFT (48 IN)
LF 760.000 $550.000 $625.000 $509.680 $490.000 $485.000 $508.400 $600.000 $500.000 $600.000 $434.360 $500.000
DRILL SHAFT (66 IN)
LF 420.000 $1,000.000 $900.000 $644.780 $640.000 $625.000 $642.930 $700.000 $655.000 $800.000 $682.570 $675.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 32.000 $275.000 $360.000 $330.000 $350.000 $250.000 $356.180 $380.000 $360.000 $275.000 $409.540 $356.180
CL C CONC (ABUT)
CY 116.800 $1,300.000 $1,061.200 $1,500.000 $1,400.000 $1,250.000 $1,114.000 $1,000.000 $1,500.000 $1,350.000 $1,820.170 $1,500.000
CL C CONC (CAP)
CY 175.800 $1,600.000 $964.600 $1,400.000 $1,400.000 $1,600.000 $1,323.020 $1,400.000 $1,400.000 $1,350.000 $1,679.380 $1,550.000
CL C CONC (CAP)(MASS)
CY 248.000 $1,500.000 $880.600 $1,200.000 $1,400.000 $1,625.000 $1,006.330 $1,500.000 $1,200.000 $1,350.000 $1,276.130 $1,750.000
CL C CONC (COLUMN)
CY 242.000 $1,500.000 $718.200 $1,200.000 $1,100.000 $1,350.000 $1,155.930 $1,300.000 $1,100.000 $1,350.000 $758.140 $1,500.000
CL C CONC (COLUMN)(MASS)
CY 520.000 $1,500.000 $667.800 $1,200.000 $960.000 $1,500.000 $896.820 $1,350.000 $975.000 $1,200.000 $811.660 $2,000.000
REINF CONC SLAB
SF 74,001.000 $25.000 $20.000 $24.800 $25.000 $23.500 $30.300 $24.500 $25.000 $29.000 $18.180 $25.000
APPROACH SLAB
CY 77.000 $159.000 $1,178.800 $650.000 $905.000 $650.000 $849.790 $1,000.000 $900.000 $1,000.000 $963.240 $1,750.000
PRESTR CONC GIRDER (TX70)
LF 8,850.420 $300.000 $245.000 $221.750 $315.000 $300.000 $232.590 $225.000 $320.000 $250.000 $439.450 $350.000
RIPRAP (CONC)(5 IN)
CY 2.300 $600.000 $900.000 $1,000.000 $880.000 $800.000 $1,079.980 $1,400.000 $750.000 $650.000 $617.560 $3,000.000
RIPRAP (CONC)(CL B)
CY 1.600 $650.000 $900.000 $1,000.000 $840.000 $800.000 $1,427.080 $2,500.000 $720.000 $650.000 $618.240 $4,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 55.000 $640.000 $465.000 $750.000 $730.000 $525.000 $604.520 $400.000 $650.000 $650.000 $653.870 $850.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 635.000 $650.000 $435.000 $650.000 $690.000 $500.000 $364.070 $640.000 $650.000 $650.000 $832.760 $650.000
RAIL (TY SSTR)
LF 3,040.000 $75.000 $80.400 $100.000 $78.000 $98.000 $66.670 $75.000 $80.000 $120.000 $83.150 $75.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 295.000 $220.000 $253.400 $250.000 $270.000 $250.000 $190.930 $280.000 $275.000 $225.000 $283.050 $215.000
CONC BOX CULV (3 FT X 2 FT)
LF 61.000 $450.000 $483.000 $475.000 $630.000 $475.000 $382.180 $700.000 $645.000 $450.000 $751.240 $600.000
SET (TY I)(S= 3 FT)(HW= 3 FT)(3:1)(C)
EA 2.000 $6,300.000 $7,850.000 $7,250.000 $5,060.000 $10,200.000 $7,216.190 $16,000.000 $5,000.000 $5,000.000 $9,744.270 $25,000.000
REMOV STR (BOX CULVERT)
EA 1.000 $7,000.000 $3,500.000 $2,500.000 $2,130.000 $17,600.000 $1,580.340 $7,000.000 $2,000.000 $2,500.000 $97.030 $4,000.000
REMOV STR (WINGWALL)
EA 2.000 $2,000.000 $900.000 $900.000 $750.000 $1,100.000 $1,466.260 $2,500.000 $725.000 $1,000.000 $2,603.500 $3,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $2,000,000.000 $450,000.000 $1,240,000.000 $1,050,000.000 $504,000.000 $1,000,000.000 $350,000.000 $1,150,000.000 $1,350,000.000 $1,217,807.350 $1,000,000.000
MOBILIZATION
LS 1.000 $1,633,200.000 $900,000.000 $1,449,741.040 $1,700,000.000 $1,600,000.000 $1,600,000.000 $1,374,000.000 $1,750,000.000 $1,400,000.000 $1,374,214.210 $2,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $5,000.000 $3,500.000 $2,000.000 $2,630.000 $2,100.000 $3,480.320 $30,000.000 $15,000.000 $3,000.000 $1,530.600 $3,800.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,000.000 $5,000.000 $18,000.000 $13,850.000 $10,866.700 $50,000.000 $20,000.000 $15,000.000 $7,500.000 $5,000.000
TMA (STATIONARY)
DAY 30.000 $200.000 $300.000 $150.000 $316.000 $235.000 $232.000 $500.000 $375.000 $200.000 $165.000 $200.000
TMA (MOBILE OPERATION)
HR 160.000 $100.000 $80.000 $100.000 $76.000 $400.000 $63.560 $150.000 $80.000 $200.000 $215.000 $250.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 100.000 $38.000 $43.000 $65.000 $42.000 $40.000 $40.000 $100.000 $40.000 $50.000 $55.100 $44.400
ROCK FILTER DAMS (REMOVE)
LF 100.000 $15.000 $16.120 $15.000 $16.000 $15.000 $15.000 $50.000 $15.000 $10.000 $14.640 $11.800
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $30.000 $43.000 $40.000 $43.000 $40.000 $40.000 $75.000 $40.000 $35.000 $34.030 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $15.000 $12.900 $12.000 $13.000 $12.000 $12.000 $40.000 $12.000 $5.000 $12.160 $20.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 150.000 $30.000 $50.000 $32.800 $46.000 $12.500 $26.280 $35.000 $130.000 $50.000 $12.850 $25.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 120.000 $100.000 $80.000 $77.000 $190.000 $65.000 $85.100 $200.000 $120.000 $40.000 $19.270 $100.000
FRNT END LOADER WORK (ERSN & SEDM CONT)
HR 120.000 $200.000 $80.000 $77.000 $134.000 $90.000 $99.270 $210.000 $150.000 $40.000 $25.570 $135.000
BLADING WORK (EROSION & SEDMT CONT)
HR 120.000 $145.000 $100.000 $77.000 $165.000 $165.000 $166.970 $250.000 $190.000 $40.000 $24.890 $200.000
BULLDOZER WORK (EROSION & SEDMT CONT)
HR 120.000 $100.000 $100.000 $77.000 $112.000 $150.000 $111.790 $300.000 $340.000 $40.000 $19.330 $300.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 10,255.000 $5.000 $4.830 $4.500 $5.000 $5.000 $4.500 $5.000 $4.500 $6.000 $6.210 $6.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 10,255.000 $1.500 $0.800 $0.750 $0.800 $1.000 $0.750 $2.000 $1.000 $1.000 $0.620 $1.000
CONSTRUCTING DETOURS
SY 4,761.000 $90.000 $80.000 $42.480 $91.000 $80.000 $66.190 $100.000 $95.000 $60.000 $121.900 $100.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,600.000 $50.000 $25.000 $30.000 $30.000 $50.000 $29.610 $15.000 $80.000 $65.000 $79.170 $55.000
PORT CTB (MOVE)(F-SHAPE)(TY 1)
LF 4,650.000 $9.500 $8.000 $15.000 $1.600 $4.500 $1.480 $2.000 $6.500 $10.000 $13.660 $5.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 6,600.000 $12.000 $25.000 $15.000 $14.500 $36.750 $6.140 $2.000 $33.000 $20.000 $20.750 $15.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 8,600.000 $0.500 $0.570 $0.750 $0.500 $0.400 $0.530 $0.720 $0.500 $0.750 $0.180 $0.530
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 8,600.000 $0.500 $0.570 $0.750 $0.500 $0.400 $0.530 $0.720 $0.500 $0.750 $0.470 $0.530
FILL MILLED ASPH RUMBLE STRIPS (SHLDR)
LF 5,780.000 $2.250 $2.000 $2.950 $8.500 $2.500 $3.000 $4.110 $2.250 $5.000 $4.340 $15.000
FILL MILLED ASPH RMBL STRIP(CENTERLINE)
LF 5,130.000 $4.000 $2.000 $2.950 $9.000 $2.500 $3.000 $4.110 $2.500 $5.000 $4.340 $15.000
MTL W-BEAM GD FEN (TIM POST)
LF 650.000 $26.000 $33.000 $30.700 $32.000 $30.750 $25.550 $42.080 $55.000 $30.000 $38.100 $30.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $3,000.000 $2,480.020 $2,807.000 $3,500.000 $237.000 $1,772.830 $3,162.110 $2,700.000 $1,500.000 $2,863.060 $2,307.000
REMOVE METAL BEAM GUARD FENCE
LF 4,300.000 $2.500 $2.680 $2.500 $2.600 $2.500 $2.610 $3.430 $10.000 $3.000 $3.100 $2.500
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $349.370 $325.000 $345.000 $325.000 $156.430 $445.470 $1,050.000 $250.000 $403.340 $325.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $4,085.000 $3,800.000 $4,040.000 $3,800.000 $3,519.580 $5,208.510 $2,700.000 $3,300.000 $4,715.920 $3,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $260.000 $376.250 $350.000 $370.000 $350.000 $208.570 $479.730 $1,050.000 $250.000 $434.360 $350.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000 $1,300.000 $700.000 $1,500.000 $260.000 $827.000 $2,607.100 $2,055.990 $250.000 $2,000.000 $2,911.380 $1,500.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,000.000 $215.000 $1,200.000 $200.000 $827.000 $1,042.840 $1,644.790 $200.000 $1,000.000 $1,164.040 $1,200.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,000.000 $8,500.000 $8,400.000 $6,000.000 $6,500.000 $9,385.540 $11,513.540 $6,000.000 $7,500.000 $9,088.020 $8,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000 $800.000 $1,021.250 $950.000 $1,000.000 $950.000 $950.000 $1,441.010 $1,000.000 $1,000.000 $1,178.980 $950.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $850.000 $1,612.500 $1,500.000 $1,600.000 $1,500.000 $1,500.000 $2,275.280 $1,500.000 $1,700.000 $1,861.550 $1,500.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GF2(BI)
EA 20.000 $35.000 $102.120 $95.000 $100.000 $95.000 $95.000 $144.100 $100.000 $100.000 $124.000 $95.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 18.000 $31.000 $134.370 $125.000 $133.000 $125.000 $125.000 $189.610 $130.000 $125.000 $95.000 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 58.000 $30.000 $102.120 $95.000 $100.000 $18.000 $95.000 $87.980 $100.000 $100.000 $110.000 $95.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 2.000 $100.000 $161.250 $150.000 $160.000 $150.000 $150.000 $227.540 $150.000 $150.000 $88.000 $150.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 24,010.000 $2.000 $0.450 $0.420 $0.500 $0.400 $0.420 $0.580 $0.500 $0.550 $0.520 $0.420
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 24,010.000 $3.000 $0.450 $0.420 $0.500 $0.400 $0.420 $0.580 $0.500 $0.550 $0.520 $0.420
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 1,201.000 $1.250 $6.000 $1.600 $1.800 $1.500 $2.000 $0.690 $0.900 $1.000 $0.620 $3.150
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 15,498.000 $1.000 $1.010 $0.940 $1.000 $1.000 $0.940 $1.290 $0.950 $1.250 $1.170 $0.940
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 14,484.000 $1.000 $1.010 $0.940 $1.000 $1.000 $0.940 $1.290 $0.950 $1.250 $1.170 $0.940
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 260.000 $1.000 $3.760 $3.500 $3.700 $3.500 $3.500 $4.800 $3.500 $4.000 $4.340 $3.500
REFL PAV MRKR TY II-A-A
EA 390.000 $4.000 $16.120 $15.000 $16.000 $15.000 $15.000 $20.560 $15.000 $27.000 $18.620 $15.000
TREE REMOVAL (12" - 18" DIA)
EA 12.000 $100.000 $967.500 $972.000 $960.000 $900.000 $170.520 $1,500.000 $850.000 $250.000 $1,116.930 $711.110
TREE REMOVAL (18" - 24" DIA)
EA 5.000 $145.000 $1,655.500 $1,663.200 $1,640.010 $1,500.000 $204.620 $2,000.000 $1,200.000 $300.000 $1,911.190 $853.340
TREE REMOVAL (30" - 36" DIA)
EA 9.000 $210.000 $1,827.500 $1,836.000 $1,810.000 $1,700.000 $216.490 $2,500.000 $1,100.000 $350.000 $2,109.750 $948.150
TREE REMOVAL (36" - 42" DIA)
EA 2.000 $225.000 $2,150.000 $2,160.000 $2,130.000 $2,000.000 $462.660 $3,000.000 $3,500.000 $450.000 $2,482.060 $2,133.350
TREE REMOVAL (42" - 48" DIA)
EA 1.000 $375.000 $3,010.000 $3,024.000 $2,930.000 $2,800.000 $925.310 $4,000.000 $3,500.000 $500.000 $3,474.890 $2,133.340
TREE REMOVAL (60" - 72" DIA)
EA 2.000 $500.000 $3,655.000 $3,672.000 $3,600.000 $3,400.000 $1,752.790 $6,000.000 $7,000.000 $600.000 $4,219.500 $4,266.670
BONDING COURSE
GAL 4,929.000 $5.000 $5.000 $3.190 $4.500 $4.500 $4.550 $6.170 $4.000 $5.000 $11.040 $4.990
TIP TESTING(DRILL SHAFT)
EA 4.000 $5,600.000 $6,600.000 $35,000.000 $9,000.000 $8,000.000 $9,459.860 $11,802.110 $9,000.000 $5,000.000 $8,687.210 $8,875.910
REMOVE LEAD-CONTAINING COATING (OTHER)
LS 1.000 $100,000.000 $50,000.000 $5,000.000 $42,500.000 $250,000.000 $313,766.000 $261,447.880 $45,000.000 $10,000.000 $193,600.690 $313,766.000
SOLAR-POWERED LED RDWY LUM ASSEMBLIES
EA 11.000 $12,000.000 $12,265.750 $10,500.000 $11,100.000 $13,860.000 $11,332.940 $15,533.600 $12,000.000 $20,000.000 $13,030.820 $11,332.940
Totals: $17,896,171.150 $13,786,606.520 $14,520,387.555 $16,071,101.830 $16,122,618.000 $16,236,815.856 $17,454,137.590 $18,011,532.900 $18,212,971.200 $19,455,980.231 $21,284,802.930
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $50,000.00
Total: $125,000.00