Bid Cobra

TxDOT Bid Item Code - 500-7003 MOBILIZATION (CALLOUT 1)

Engineer's Estimate

Average: $17,674.21
Maximum: $339,695.00
Minimum: $250.00

Bid Information

Average Bid: $26,173.83