TxDOT Bid Item Code - 7063-7114 FIRE HYDRANT ASSEMBLY (LONG LEAD)
Engineer's Estimate
Average:
$10,000.00
Maximum:
$10,000.00
Minimum:
$10,000.00
Bid Information
Average Bid:
$39,541.41
