Show Job Controls
Bid Cobra

BELL SL 121 (2502-01-024)

Items: 169

County: BELL
Length: 1.9900 MILES (1.4546 MILES)
Highway: SL 121
District: WACO
Control Number: 2502-01-024
DBE Goal: 0.0%
Project: F 2B26(065)
Guaranty: $100,000.00
Time: 540 WORKING DAYS
Engineer's Estimate: $24,664,268.85
Date: 10/06/2026 1:00 PM CDT (4 weeks ago)
Contract Number: 10263003
Type: CONSTRUCT NEW ROAD
Project ID: A00186301
Contract Type: FEDERAL
Project Description: WIDEN FROM TWO TO FOUR LANES WITH RAISED MEDIAN
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (6)
E
Engineer's Estimate
$24,664,268.85
$22,052,184.35
Over/Under Est: -10.59% -$2,612,084.50
$23,137,144.00
Over/Under Est: -6.19% -$1,527,124.85
Amt Left: 4.92% $1,084,959.65
Over/Under Est: -4.35% -$1,073,241.85
Amt Left: 6.98% $1,538,842.65
Delta: -1.96% -$453,883.00
Over/Under Est: -4.14% -$1,019,983.83
Amt Left: 7.22% $1,592,100.67
Delta: -0.23% -$53,258.02
Over/Under Est: -1.15% -$282,927.45
Amt Left: 10.56% $2,329,157.05
Delta: -3.12% -$737,056.38
Over/Under Est: 2.09% $514,526.65
Amt Left: 14.18% $3,126,611.15
Delta: -3.27% -$797,454.10

Bid Items & Bid Tabulations

169 Total 0 of 169
BELL  |  SL 121  |  WACO  |  2502-01-024  |  10/06/2026 1:00 PM CDT  |  $24,664,268.85  |  F 2B26(065)  |  CONSTRUCT NEW ROAD  |  540 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BIG CREEK CONSTRUCTION, LTD.
PATIN CONSTRUCTION LLC
JAMES CONSTRUCTION GROUP, LLC
TEXAS MATERIALS GROUP, INC.
JORDAN FOSTER CONSTRUCTION, LLC
JOE BLAND CONSTRUCTION LLC
PREPARING ROW
STA 101.000 $2,700.000 $550.000 $1,800.000 $15,708.000 $500.000 $10,000.000 $1,250.000
REMOV CONC (PAV)
SY 3,362.000 $12.000 $12.000 $25.000 $10.500 $31.000 $17.000 $30.000
REMOV CONC (RIPRAP)
SY 55.000 $16.000 $16.000 $25.000 $27.370 $57.000 $18.000 $30.000
REMOV CONC (MEDIANS)
SY 370.000 $14.500 $20.000 $25.000 $17.540 $19.000 $7.800 $35.000
REMOV CONC (DRIVEWAYS)
SY 3,753.000 $17.550 $15.000 $22.000 $14.120 $25.000 $16.000 $35.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 223.000 $22.000 $18.000 $25.000 $25.410 $41.000 $11.000 $40.000
REMOV CONC (CURB)
LF 1,782.000 $7.000 $5.000 $5.000 $2.960 $14.000 $6.750 $8.000
REMOV CONC (CURB & GUTTER)
LF 341.000 $8.000 $8.000 $5.000 $15.820 $18.000 $12.300 $8.000
REMOV CONC (MISC)
SY 320.000 $20.000 $25.000 $25.000 $5.860 $29.000 $21.000 $40.000
RMV (13") TRT/UNTRT BASE & ASPH PAV
SY 4,365.000 $4.400 $8.250 $7.000 $6.450 $4.000 $9.350 $6.000
RMV (0"-9") TRT/UNTRT BASE & ASPH PAV
SY 51,385.000 $10.000 $5.000 $7.000 $2.140 $2.700 $4.200 $5.000
EXCAV (ROADWAY)
CY 21,125.000 $12.450 $18.000 $10.000 $18.500 $12.000 $8.000 $12.000
EMBANK (FNL)(OC)(TY C)
CY 33,581.000 $21.000 $18.000 $34.000 $12.340 $15.000 $20.000 $40.000
FURN & PLACE TOPSOIL (4")
SY 53,147.000 $1.500 $1.000 $2.000 $1.230 $3.300 $2.250 $1.000
BLOCK SODDING
SY 53,147.000 $4.000 $4.250 $14.000 $2.000 $3.970 $4.200 $7.500
HYDRO MULCH SEED (TEMP_WARM)
SY 53,147.000 $0.400 $0.400 $1.000 $0.520 $0.370 $0.380 $0.500
HYDRO MULCH SEED (TEMP_COOL)
SY 53,147.000 $0.700 $0.400 $1.000 $0.520 $0.370 $0.380 $0.500
VEGETATIVE WATERING
TGL 1,294.000 $10.000 $25.000 $25.000 $32.260 $38.000 $43.000 $60.000
SOIL RET BLKT(SL_STEEP_CLAY_SHORT)
SY 1,113.000 $5.000 $1.600 $3.000 $1.100 $1.450 $2.000 $1.500
FL BS (CMP IN PLC)(TY D GR 5)(FNAL POS)
CY 13,600.000 $61.000 $57.000 $70.000 $60.280 $69.200 $59.000 $84.000
LIME (COM OR QK)(SLURRY)
TON 1,600.000 $310.000 $350.000 $380.000 $443.050 $340.000 $350.000 $405.000
LIME TRT (SUBGRADE) (8")
SY 81,571.000 $6.000 $4.300 $8.000 $5.440 $8.000 $5.000 $14.000
EMULS ASPH (BS OR SUBGR TRT)(CSS-1H)
GAL 97,880.000 $6.150 $5.250 $2.500 $3.010 $4.200 $4.250 $11.000
FOG SEAL (CSS-1H)
GAL 8,161.000 $4.000 $5.000 $3.000 $2.250 $8.000 $2.350 $2.500
ASPH (CRS-2P)
GAL 45,074.000 $5.000 $4.000 $4.000 $3.000 $4.300 $3.100 $3.500
AGGR (TY-D OR L, GR-4)
CY 559.000 $200.000 $120.000 $280.000 $245.000 $221.000 $250.000 $280.000
D-GR HMA TY-B PG64-22
TON 13,060.000 $88.000 $90.000 $103.000 $90.000 $132.000 $94.000 $98.000
TACK COAT
GAL 7,572.000 $4.000 $3.600 $5.000 $3.750 $3.300 $3.950 $4.250
SP MIXES SP-C SAC-A PG70-22
TON 8,642.000 $140.000 $110.000 $130.000 $112.000 $165.000 $115.000 $128.000
CONC PVMT (CRCP) (12")
SY 831.000 $100.000 $140.000 $125.000 $172.110 $132.000 $180.000 $180.000
CONC PVMT(TRANSITION SLAB) (12")
SY 128.000 $225.000 $245.000 $125.000 $210.480 $296.000 $230.000 $190.000
CEM STABIL BKFL
CY 7,572.000 $180.000 $155.000 $250.000 $154.920 $200.000 $154.000 $168.000
CEMENT STAB BACKFILL (INLET OR MH)
CY 396.000 $110.000 $195.000 $250.000 $154.920 $200.000 $195.000 $175.000
TRENCH EXCAVATION PROTECTION
LF 14,187.000 $6.000 $10.000 $5.000 $1.840 $1.000 $3.400 $5.000
TEMPORARY SPL SHORING
SF 4,460.000 $22.000 $30.000 $40.000 $19.010 $28.000 $45.000 $20.000
DRILL SHAFT (30 IN)
LF 400.000 $300.000 $800.000 $350.000 $726.870 $293.000 $785.000 $385.000
RIPRAP (CONC)(4 IN)
CY 1,178.000 $531.000 $610.000 $500.000 $457.620 $595.000 $735.000 $500.000
RIPRAP (CONC)(CL B)
CY 17.500 $620.000 $830.000 $500.000 $1,063.060 $630.000 $800.000 $715.000
RIPRAP (CONC)(CL B)(5 IN)
CY 120.000 $800.000 $630.000 $600.000 $654.840 $630.000 $630.000 $495.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 10.000 $200.000 $250.000 $250.000 $252.330 $350.000 $350.000 $225.000
RIPRAP (STONE COMMON)(DRY)(24 IN)
CY 198.000 $205.000 $165.000 $300.000 $190.990 $227.000 $180.000 $175.000
RAIL (HANDRAIL)(TY F)
LF 1,255.000 $130.000 $190.000 $185.000 $180.310 $146.000 $185.000 $180.000
CONC BOX CULV (5 FT X 4 FT)
LF 139.000 $602.000 $445.000 $550.000 $529.970 $498.000 $620.000 $740.000
CONC BOX CULV (8 FT X 5 FT)
LF 20.000 $850.000 $885.000 $950.000 $1,009.100 $866.000 $1,100.000 $1,295.000
RC PIPE (CL III)(18 IN)
LF 2,223.000 $100.000 $75.000 $70.000 $116.580 $59.000 $92.000 $100.000
RC PIPE (CL III)(24 IN)
LF 8,548.000 $100.000 $90.000 $90.000 $138.340 $76.000 $105.000 $120.000
RC PIPE (CL III)(30 IN)
LF 766.000 $140.000 $120.000 $110.000 $153.650 $109.000 $135.000 $150.000
RC PIPE (CL III)(36 IN)
LF 1,625.000 $175.000 $165.000 $150.000 $197.330 $162.000 $240.000 $195.000
RC PIPE (CL III)(42 IN)
LF 826.000 $190.000 $222.000 $200.000 $255.360 $228.000 $215.000 $250.000
RC PIPE (CL III)(48 IN)
LF 403.000 $230.000 $254.000 $250.000 $302.190 $289.000 $285.000 $300.000
MANH (COMPL)(PRM)(48IN)
EA 7.000 $8,683.000 $5,825.000 $7,000.000 $7,045.240 $5,722.000 $9,200.000 $10,000.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 1.000 $6,493.000 $4,500.000 $6,000.000 $9,453.080 $5,056.000 $7,800.000 $8,500.000
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 53.000 $12,404.000 $10,510.000 $8,000.000 $12,654.990 $7,335.000 $9,700.000 $7,750.000
INLET (COMPL)(PCO)(5FT)(RIGHT)
EA 41.000 $12,404.000 $10,690.000 $8,000.000 $12,867.330 $7,329.000 $9,700.000 $7,750.000
INLET (COMPL)(PAZD)(RC)(3FTX3FT)
EA 1.000 $5,793.000 $5,750.000 $6,000.000 $8,579.120 $4,012.000 $6,300.000 $5,750.000
INLET (COMPL)(PAZD)(RC)(4FTX4FT)
EA 2.000 $7,955.000 $6,500.000 $6,000.000 $9,382.430 $3,612.000 $7,400.000 $8,000.000
JCTBOX (COMPL)(11FT X 6FT)
EA 1.000 $40,000.000 $23,500.000 $33,000.000 $36,026.860 $31,562.000 $20,000.000 $35,000.000
HEADWALL (CH - FW - 0) (DIA= 30 IN)
EA 1.000 $7,000.000 $7,825.000 $4,500.000 $10,791.460 $6,000.000 $11,000.000 $7,500.000
HEADWALL (CH - FW - 0) (DIA= 48 IN)
EA 2.000 $12,030.000 $9,830.000 $5,500.000 $16,694.870 $13,000.000 $17,000.000 $5,750.000
HEADWALL (CH - FW - 15) (DIA= 48 IN)
EA 2.000 $15,500.000 $9,125.000 $5,500.000 $11,687.060 $11,200.000 $21,000.000 $6,750.000
HEADWALL (CH - FW - A - 0) (DES= 3)
EA 1.000 $850.000 $8,575.000 $5,500.000 $10,935.040 $14,300.000 $16,000.000 $7,750.000
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 1.000 $13,000.000 $8,750.000 $4,500.000 $11,246.100 $9,700.000 $12,000.000 $7,750.000
HEADWALL (CH - PW - S) (DIA= 42 IN)
EA 2.000 $1,400.000 $12,500.000 $5,500.000 $19,405.170 $15,000.000 $23,000.000 $9,500.000
WINGWALL (FW - 0) (HW=6 FT)
EA 1.000 $14,000.000 $13,400.000 $15,000.000 $11,897.630 $12,900.000 $32,000.000 $12,250.000
WINGWALL (FW - 0) (HW=7 FT)
EA 1.000 $22,112.500 $19,325.000 $17,000.000 $17,746.430 $18,250.000 $37,000.000 $17,750.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 5.000 $1,174.000 $1,200.000 $2,500.000 $2,041.440 $1,158.000 $2,200.000 $3,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000 $2,138.000 $1,390.000 $3,000.000 $1,852.820 $1,107.000 $3,200.000 $4,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 1.000 $3,311.000 $1,620.000 $3,000.000 $2,153.230 $1,107.000 $3,300.000 $4,500.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 11.000 $1,699.000 $1,620.000 $3,000.000 $2,151.550 $1,107.000 $3,300.000 $4,500.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $2,842.000 $2,700.000 $3,500.000 $5,123.350 $2,993.000 $3,500.000 $6,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 3.000 $4,445.000 $3,300.000 $3,500.000 $5,853.860 $3,210.000 $3,700.000 $7,500.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $3,166.000 $2,750.000 $3,500.000 $6,227.320 $3,745.000 $3,700.000 $7,500.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 1.000 $3,940.000 $3,350.000 $4,000.000 $5,644.310 $4,100.000 $4,700.000 $7,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 1.000 $7,372.000 $4,630.000 $4,000.000 $7,171.960 $4,943.000 $7,300.000 $10,500.000
SET (TY II) (42 IN) (RCP) (6: 1) (C)
EA 2.000 $7,000.000 $6,200.000 $5,000.000 $7,500.090 $10,800.000 $15,000.000 $13,150.000
SET (REMOV & REINSTALL)
EA 8.000 $390.000 $1,000.000 $1,500.000 $1,512.130 $675.000 $3,000.000 $2,250.000
REMOV & RE - LAY PIPE (15 IN)
LF 86.000 $100.000 $60.000 $80.000 $70.100 $43.000 $126.000 $150.000
REMOV & RE - LAY PIPE (18 IN)
LF 210.000 $41.000 $60.000 $80.000 $57.410 $50.000 $88.000 $150.000
REMOV & RE - LAY PIPE (24 IN)
LF 58.000 $81.000 $67.000 $80.000 $103.930 $70.000 $125.000 $150.000
CAST-IN-PLACE TRENCH DRAIN
LF 40.000 $213.000 $600.000 $150.000 $446.780 $387.000 $800.000 $750.000
ADJUSTING MANHOLES
EA 6.000 $1,600.000 $2,200.000 $500.000 $2,152.080 $1,800.000 $2,300.000 $1,250.000
REMOV STR (INLET)
EA 2.000 $1,121.650 $1,280.000 $1,500.000 $1,060.290 $700.000 $940.000 $1,625.000
REMOV STR (SET)
EA 52.000 $457.000 $325.000 $500.000 $903.270 $170.000 $500.000 $1,025.000
REMOV STR (HEADWALL)
EA 1.000 $1,126.250 $1,500.000 $1,500.000 $4,224.840 $1,000.000 $3,900.000 $1,625.000
REMOV STR (PIPE)
LF 3,267.000 $12.000 $17.500 $40.000 $24.110 $8.000 $12.000 $50.000
MOBILIZATION
LS 1.000 $2,244,429.350 $2,100,000.000 $200,000.000 $2,353,364.030 $2,360,000.000 $2,422,891.710 $1,050,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 36.000 $12,000.000 $3,100.000 $2,500.000 $6,635.690 $2,500.000 $10,000.000 $1,750.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $7,264.000 $8,500.000 $60,000.000 $16,829.930 $20,000.000 $20,000.000 $8,750.000
TMA (STATIONARY)
DAY 50.000 $260.000 $200.000 $300.000 $350.310 $170.000 $550.000 $215.000
TMA (MOBILE OPERATION)
HR 384.000 $60.000 $100.000 $200.000 $175.310 $14.000 $120.000 $145.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 640.000 $51.000 $40.000 $60.000 $38.000 $45.000 $47.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 640.000 $18.000 $6.000 $10.000 $10.000 $20.000 $21.000 $15.000
CONSTRUCTION EXITS (INSTALL) (TY 2)
SY 446.000 $30.000 $70.000 $10.000 $45.000 $45.000 $47.000 $115.000
CONSTRUCTION EXITS (REMOVE)
SY 446.000 $10.000 $9.000 $5.000 $20.000 $20.000 $21.000 $30.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 9,041.000 $3.000 $3.300 $4.000 $3.750 $3.590 $3.750 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 9,041.000 $1.000 $1.000 $1.000 $1.000 $1.000 $1.050 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,335.000 $4.500 $5.500 $7.000 $5.250 $8.500 $8.950 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,335.000 $1.000 $1.000 $2.000 $1.000 $2.000 $2.100 $2.000
CONSTRUCTING DETOURS
SY 28,268.000 $93.000 $58.000 $41.000 $48.620 $65.000 $50.000 $52.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $4,500.000 $4,500.000 $8,000.000 $10,000.000 $9,000.000 $5,700.000 $7,500.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 14,460.000 $14.000 $10.000 $35.000 $9.330 $16.000 $13.650 $20.000
PORT CTB (DES SOURCE)(LOW PROF)(TY 2)
LF 920.000 $20.000 $10.000 $70.000 $13.350 $26.000 $54.000 $10.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 16,900.000 $7.000 $4.000 $10.000 $6.400 $12.500 $5.400 $15.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 1,480.000 $7.000 $4.000 $10.000 $7.900 $22.000 $14.350 $15.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 14,460.000 $11.000 $9.250 $10.000 $6.880 $13.500 $8.000 $20.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 920.000 $21.000 $9.250 $10.000 $6.880 $13.000 $13.500 $20.000
CONC CURB & GUTTER (TY II)
LF 20,150.000 $34.000 $27.000 $20.000 $24.750 $32.000 $20.850 $22.000
CONC CURB (DOWEL)(MOD)
LF 17,689.000 $28.000 $25.000 $25.000 $10.690 $7.000 $35.800 $24.000
DRIVEWAYS (CONC)
SY 2,926.000 $105.000 $102.000 $120.000 $102.690 $100.000 $122.000 $130.000
DRIVEWAYS (ACP)
SY 2,892.000 $41.000 $50.000 $55.000 $58.520 $75.300 $77.000 $60.000
CONC SIDEWALKS (5")
SY 15,884.000 $67.000 $74.000 $74.000 $74.730 $71.350 $78.000 $63.000
CURB RAMPS (TY 1)
EA 1.000 $2,800.000 $2,550.000 $2,500.000 $3,192.180 $2,200.000 $3,300.000 $2,000.000
CURB RAMPS (TY 2)
EA 3.000 $2,800.000 $2,900.000 $2,500.000 $3,525.160 $2,400.000 $3,400.000 $2,000.000
CURB RAMPS (TY 7)
EA 8.000 $3,000.000 $2,625.000 $2,500.000 $3,525.160 $2,300.000 $3,500.000 $2,750.000
CURB RAMPS (TY 10)
EA 4.000 $2,800.000 $2,300.000 $2,500.000 $3,525.170 $2,100.000 $2,300.000 $2,750.000
CURB RAMPS (TY 21)
EA 1.000 $3,500.000 $500.000 $2,500.000 $3,525.220 $4,300.000 $3,500.000 $1,750.000
CURB RAMPS (TY 22)
EA 2.000 $5,000.000 $500.000 $2,500.000 $5,842.760 $4,800.000 $3,500.000 $5,500.000
CONC MEDIAN
SY 55.000 $73.000 $140.000 $100.000 $68.130 $92.000 $220.000 $115.000
CONC DIRECTIONAL ISLAND (12")
LF 100.000 $95.000 $150.000 $50.000 $98.860 $132.000 $205.000 $300.000
RELOCATE EXISTING MAILBOX
EA 8.000 $283.000 $240.000 $500.000 $289.000 $350.000 $470.000 $825.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 50.000 $5,360.000 $6,200.000 $5,500.000 $5,656.000 $5,020.000 $6,100.000 $5,900.000
CONDT (PVC) (SCH 40) (2")
LF 4,925.000 $13.000 $15.000 $15.000 $13.640 $17.500 $14.500 $14.000
CONDT (PVC) (SCH 40) (3")
LF 13,390.000 $15.000 $12.000 $15.000 $10.500 $9.650 $11.250 $15.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 3,068.000 $22.000 $18.500 $20.000 $16.750 $17.100 $18.000 $19.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,705.000 $15.000 $27.500 $35.000 $25.000 $52.600 $27.000 $35.000
CONDT (PVC) (SCH 80) (3") (BORE)
LF 6,086.000 $30.000 $28.500 $60.000 $26.000 $41.950 $28.000 $38.000
ITS MULTI-DUCT CND (PVC-40)
LF 13,290.000 $25.000 $19.250 $40.000 $17.500 $20.550 $19.000 $40.000
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 3,068.000 $20.000 $26.750 $50.000 $24.250 $29.100 $26.000 $50.000
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 6,086.000 $47.000 $38.500 $58.000 $35.000 $55.500 $37.000 $58.000
FIBER OPTIC CABLE ROAD MARKER
LF 35.000 $216.000 $46.000 $200.000 $42.000 $172.750 $46.000 $180.000
ELEC CONDR (NO.14) INSULATED
LF 11,407.000 $1.000 $1.650 $2.000 $1.500 $2.400 $1.650 $1.500
ELEC CONDR (NO.12) BARE
LF 7,760.000 $2.000 $1.450 $2.000 $1.300 $2.520 $1.400 $1.750
ELEC CONDR (NO.12) INSULATED
LF 15,520.000 $2.000 $1.950 $2.000 $1.750 $2.520 $2.000 $2.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 33.000 $4,700.000 $5,700.000 $5,500.000 $5,167.000 $5,161.000 $5,590.000 $5,650.000
ITS GND BOX(PCAST) TY 2 (366060)W/APRN
EA 2.000 $12,300.000 $8,500.000 $8,500.000 $7,702.000 $8,387.000 $8,400.000 $8,825.000
GROUND BOX TY A (122311)W/APRON
EA 31.000 $1,304.000 $1,700.000 $1,500.000 $1,545.000 $2,468.000 $1,675.000 $1,425.000
ELC SRV TY A 120/240 060(NS)SS(E)SP(U)
EA 6.000 $9,600.000 $8,800.000 $10,000.000 $8,004.000 $14,510.000 $8,665.000 $9,250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $650.000 $715.000 $1,000.000 $647.000 $647.330 $680.000 $750.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $750.000 $825.000 $1,000.000 $750.000 $750.000 $800.000 $875.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 1.000 $1,450.000 $935.000 $1,100.000 $850.000 $850.000 $900.000 $995.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $1,000.000 $950.000 $1,100.000 $866.000 $866.000 $915.000 $1,015.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 12.000 $800.000 $500.000 $700.000 $450.000 $450.000 $475.000 $525.000
RELOCATE SM RD SN SUP&AM TY S80
EA 1.000 $700.000 $500.000 $700.000 $450.000 $450.000 $475.000 $525.000
REMOVE SM RD SN SUP&AM
EA 36.000 $110.000 $100.000 $125.000 $90.000 $90.000 $95.000 $105.000
RELOCATE LRSA
EA 1.000 $5,000.000 $6,500.000 $10,000.000 $8,200.000 $8,200.000 $10,500.000 $9,775.000
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 2,267.000 $6.000 $5.000 $5.000 $4.500 $3.110 $4.750 $4.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 758.000 $5.000 $5.000 $5.000 $4.500 $3.030 $4.750 $3.500
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 333.000 $1.000 $1.100 $1.000 $1.000 $0.870 $1.050 $1.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 67,232.000 $1.000 $0.550 $1.000 $0.500 $0.600 $0.550 $1.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 85.000 $1.000 $1.100 $1.000 $1.000 $0.770 $1.100 $1.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 30,176.000 $1.000 $0.550 $1.000 $0.500 $0.600 $0.520 $1.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 1,944.000 $1.000 $1.100 $2.000 $1.000 $1.110 $1.050 $1.250
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,285.000 $1.000 $0.850 $2.000 $0.780 $0.990 $0.850 $1.250
REFL PAV MRK TY I (W)18"(SLD)(100MIL)
LF 100.000 $6.000 $1.650 $7.000 $1.500 $5.750 $1.600 $6.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 589.000 $6.000 $12.750 $10.000 $12.000 $7.010 $12.600 $8.250
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 13.000 $36.000 $60.000 $50.000 $55.000 $35.000 $57.000 $40.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 1,974.000 $0.650 $0.750 $1.000 $0.680 $0.800 $0.700 $1.000
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 18,621.000 $1.000 $0.750 $1.000 $0.660 $0.710 $0.700 $1.000
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 18,717.000 $1.000 $0.750 $1.000 $0.660 $0.730 $0.700 $1.000
PREFAB PM TY C (W)(ARROW)
EA 58.000 $180.000 $240.000 $500.000 $220.000 $275.000 $230.000 $325.000
PREFAB PM TY C (W)(WORD)
EA 49.000 $230.000 $300.000 $500.000 $275.000 $300.000 $285.000 $350.000
REFL PAV MRKR TY II-A-A
EA 406.000 $5.000 $8.500 $7.000 $8.000 $5.670 $8.400 $6.500
REFL PAV MRKR TY II-C-R
EA 93.000 $4.000 $7.000 $10.000 $6.000 $6.110 $6.850 $7.000
FULL - WIDTH MOWING
CYC 6.000 $3,200.000 $4,100.000 $1,500.000 $4,200.000 $1,900.000 $3,500.000 $4,000.000
TREE TRIMMING / BRUSH REMOVAL
MI 1.950 $1,715.000 $18,750.000 $10,000.000 $5,000.000 $9,000.000 $4,000.000 $10,250.000
SYSTEM INTEGRATION
LS 1.000 $26,835.000 $12,880.000 $62,000.000 $11,713.000 $83,420.000 $12,600.000 $64,500.000
FIBER OPTIC FUSION SPLICE
EA 576.000 $67.000 $71.000 $60.000 $65.000 $69.450 $70.000 $60.000
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 25,498.000 $4.000 $9.750 $6.000 $8.900 $5.110 $9.600 $6.000
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 2.000 $3,000.000 $3,000.000 $7,500.000 $2,748.000 $7,240.000 $3,400.000 $7,750.000
Totals: $24,664,268.850 $22,052,184.350 $23,137,144.000 $23,591,027.000 $23,644,285.020 $24,381,341.400 $25,178,795.500
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $135,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $117,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $21,000.00
Total: $273,000.00