PREPARING ROW
|
STA
|
323.200
|
|
|
REMOV CONC (DRIVEWAYS)
|
SY
|
422.000
|
|
|
REMOV CONC (CURB)
|
LF
|
281.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
16.000
|
|
|
EXCAV (CHANNEL)
|
CY
|
98.000
|
|
|
SUBGR WIDEN (OC)
|
STA
|
320.200
|
|
|
EMBANK (VEH)(OC)(TY B)
|
CY
|
436.000
|
|
|
BACKFILL (TY B)
|
STA
|
320.200
|
|
|
ROAD GRADER WORK (ORD COMP)
|
STA
|
320.200
|
|
|
BULLDOZER WORK
|
HR
|
14.000
|
|
|
SPEC EXCAV WORK (HYD EXCAVATOR)
|
HR
|
14.000
|
|
|
BROADCAST SEED (TEMP_WARM)
|
SY
|
71,153.000
|
|
|
BROADCAST SEED (TEMP_COOL)
|
SY
|
71,153.000
|
|
|
STRAW/HAY MLCH SEED(PERM_RURAL_CLAY)
|
SY
|
142,307.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
854.000
|
|
|
PROOF ROLLING
|
HR
|
40.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4) (8")
|
SY
|
100,242.000
|
|
|
GEOGRID BASE REINFORCEMENT (TYPE 2)
|
SY
|
111,982.000
|
|
|
REWORK BS MTL (TY C)(10")(ORD COMP)
|
SY
|
86,011.000
|
|
|
CEMENT
|
TON
|
606.000
|
|
|
CEMENT TRT (NEW BASE)(6")
|
SY
|
100,242.000
|
|
|
ASPH (RC-250)
|
GAL
|
29,236.000
|
|
|
AGGR (TY-B, GR-5)
|
CY
|
747.000
|
|
|
SP MIXES SP-C SAC-A PG64-22
|
TON
|
16,962.000
|
|
|
PLANE ASPH CONC PAV(0" TO 4")
|
SY
|
804.000
|
|
|
CUT & RESTORING PAV
|
SY
|
895.000
|
|
|
FLOWABLE BACKFILL
|
CY
|
517.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
824.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
2,283.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
669.000
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
352.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL3)
|
LF
|
196.000
|
|
|
CLEANING AND SEALING EXIST JOINTS (CL7)
|
LF
|
98.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
668.000
|
|
|
CONC BOX CULV (7 FT X 4 FT)
|
LF
|
120.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)
|
LF
|
184.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
3,894.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
754.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
158.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
388.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 30 IN)
|
EA
|
1.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 36 IN)
|
EA
|
2.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 18 IN)
|
EA
|
1.000
|
|
|
WINGWALL (PW - 2) (HW=6 FT)
|
EA
|
4.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
265.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
6.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
40.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
2.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
10.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
|
|
REMOV & RE - LAY PIPE (18 IN)
|
LF
|
14.000
|
|
|
REMOV & RE - LAY PIPE (36 IN)
|
LF
|
212.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
12.000
|
|
|
REMOV STR (SET)
|
EA
|
16.000
|
|
|
REMOV STR (PIPE)
|
LF
|
4,932.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
19.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
|
|
TMA (STATIONARY)
|
DAY
|
230.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
50.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
840.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
840.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,260.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,260.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
2,250.000
|
|
|
PORT CTB (MOVE)(F-SHAPE)(TY 1)
|
LF
|
8,190.000
|
|
|
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
|
LF
|
2,250.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
1,267.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
422.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,113.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
6,651.000
|
|
|
TURNOUTS (ACP)
|
SY
|
1,595.000
|
|
|
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
|
LF
|
64,642.000
|
|
|
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
|
LF
|
32,321.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
5,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
5,250.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
11.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
12.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
1.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
8.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
|
|
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
|
EA
|
2.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 1
|
EA
|
4.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
59.000
|
|
|
MAILBOX INSTALL-D (WC-POST) TY 3
|
EA
|
9.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
94.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
16.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
5.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1 (BI)
|
EA
|
84.000
|
|
|
INSTL OM SM RD SIGN (1-OM-CON)R
|
EA
|
23.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
138,084.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
44,602.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
78,304.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,305.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
750.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
248.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(090MIL)
|
EA
|
20.000
|
|
TY I HIGH PERF PM (W)6"(SLD)(090MIL)
|
LF
|
59,414.000
|
|
TY I HIGH PERF PM (Y)6"(BRK)(090MIL)
|
LF
|
22,301.000
|
|
TY I HIGH PERF PM (Y)6"(SLD)(090MIL)
|
LF
|
27,946.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,232.000
|
|
REFL PAV MRKR TY II-C-C
|
EA
|
1,060.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
21,242.000
|