FORT BEND POOL HILL RD (0912-34-209)

Items: 75

County: FORT BEND
Length: N/A
Highway: POOL HILL RD
District: HOUSTON
Control Number: 0912-34-209
DBE Goal: 0.0%
Project: BR 2023(651)
Guaranty: $43,000.00
Time: 258 WORKING DAYS
Engineer's Estimate: $2,127,190.21
Date: 10/06/2026 1:00 PM CDT (in 16 days) Changed
Contract Number: 10263214
Type: BRIDGE REPLACEMENT
Project ID: A00134683
Contract Type: FEDERAL
Project Description: REPLACE BRIDGE AND APPROACHES (NBI NO. 120800AA0398001)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Print Print Notice
Documents 2 files available

Bid Items & Bid Tabulations

75 Total 0 of 75
1 Removed
5 Changed
FORT BEND  |  POOL HILL RD  |  HOUSTON  |  0912-34-209  |  10/06/2026 1:00 PM CDT  |  $2,127,190.21  |  BR 2023(651)  |  BRIDGE REPL  |  258 WORKING DAYS
Item Code
Description
Unit
Quantity
REMOV CONC (MISC)
CY 313.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 733.000
RMV (11"-15") TRT/UNTRT BASE & ASPH PAV
SY 808.000
EXCAV (ROADWAY)
CY 392.000
EMBANK (FNL)(DC)(TY C)
CY 398.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 1,358.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
SY 63.000
PRIME COAT(MC-30 OR AE-P)
GAL 425.000
D-GR HMA TY-B PG70-22
TON 1,218.000
D-GR HMA TY-D PG70-22
TON 245.000
TACK COAT
GAL 318.000
CEM STABIL BKFL
CY 152.000
TEMPORARY SPL SHORING
SF 113.000
DRILL SHAFT (24 IN)
LF 357.000
DRILL SHAFT (36 IN)
LF 256.000
CL C CONC (ABUT)
CY 57.000
REINF CONC SLAB
SF 2,176.000
REINF CONC SLAB (SLAB BEAM)
SF 1,446.000
APPROACH SLAB
CY 96.400
RETAINING WALL (CAST-IN-PLACE)
SF 84.000
PRESTR CONC GIRDER (TX28)
LF 270.000
PRESTR CONC SLAB BEAM (4SB15)
LF 356.000
RIPRAP (CONC)(5 IN)
CY 106.500
RIPRAP (MOW STRIP)(4 IN)
CY 37.000
RAIL (TY T223)
LF 282.000
TYPE A JOINT
LF 64.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 63.000
RC PIPE (CL III)(36 IN)
LF 314.000
RC PIPE (ARCH)(CL III)(DES 1)
LF 51.000
INL(CMP)(PAZD-CZ)(FG)(5FTX5FT-4FTX4FT)
EA 3.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 1.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 3.000
REMOV STR (PIPE)
LF 223.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000
TMA (STATIONARY)
DAY 6.000
Qty Changed
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 97.000
Qty Changed
ROCK FILTER DAMS (REMOVE)
LF 97.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,208.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,208.000
Qty Changed
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 44.000
Qty Changed
BIODEG EROSN CONT LOGS (REMOVE)
LF 44.000
CONSTRUCTING DETOURS
SY 444.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 14.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 180.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 340.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 180.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 180.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 180.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 340.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000
Qty Changed
DRIVEWAYS (ACP)
SY 203.000
MTL W-BEAM GD FEN (STEEL POST)
LF 175.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 192.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL2)
EA 4.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 17.000
REMOVE SM RD SN SUP&AM
EA 12.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 41.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 7.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 2,231.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 60.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 92.000
RE PM TY I(W)24"(SLD)(100MIL)(CALLOUT)
LF 11.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 1,519.000
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 1,519.000
PAVEMENT SLER 6"
LF 452.000
REFL PAV MRKR TY II-A-A
EA 19.000
PAV SURF PREP FOR MRK (6")
LF 3,038.000
Removed DRIVEWAYS (ACP) (TY 2) SY 29.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $10,734.01
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,138.78
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,750.00
Total: $22,622.79