Show Job Controls
Bid Cobra

GALVESTON FM 3005 (0051-09-127)

Items: 85

County: GALVESTON
Length: 0.0000 MILES (2.9703 MILES)
Highway: FM 3005
District: HOUSTON
Control Number: 0051-09-127
DBE Goal: 0.0%
Project: F 2026(972)
Guaranty: $48,000.00
Time: 126 WORKING DAYS
Engineer's Estimate: $2,179,545.80
Date: 09/03/2026 1:00 PM CDT (16 days ago)
Contract Number: 9263218
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00191741
Contract Type: FEDERAL
Project Description: INSTALL CURB RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 3 files available
Bidders (7)
E
Engineer's Estimate
$2,179,545.80
$2,086,922.00
Over/Under Est: -4.25% -$92,623.80
$2,259,895.00
Over/Under Est: 3.69% $80,349.20
Amt Left: 8.29% $172,973.00
$2,293,251.25
Over/Under Est: 5.22% $113,705.45
Amt Left: 9.89% $206,329.25
Delta: -1.48% -$33,356.25
$2,396,673.95
Over/Under Est: 9.96% $217,128.15
Amt Left: 14.84% $309,751.95
Delta: -4.51% -$103,422.70
Over/Under Est: 15.64% $340,969.10
Amt Left: 20.78% $433,592.90
Delta: -5.17% -$123,840.95
Over/Under Est: 34.6% $754,176.80
Amt Left: 40.58% $846,800.60
Delta: -16.39% -$413,207.70
Over/Under Est: 61.4% $1,338,133.28
Amt Left: 68.56% $1,430,757.08
Delta: -19.90% -$583,956.48

Bid Items & Bid Tabulations

85 Total 0 of 85
GALVESTON  |  FM 3005  |  HOUSTON  |  0051-09-127  |  09/03/2026 1:00 PM CDT  |  $2,179,545.80  |  F 2026(972)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  126 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
CASTILLO ARANDA LLC
JFO SERVICES, LLC
MBN ENTERPRISES LLC
TI-ZACK CONCRETE, LLC
ROMAN EMPERORS ROAD, LLC
SER CONSTRUCTION PARTNERS, LLC
RAGLE CONSTRUCTION, INC.
PREPARING ROW
AC 0.500 $15,000.000 $35,750.000 $193,536.800 $20,000.000 $11,000.000 $20,000.000 $160,000.000 $50,000.000
REMOV CONC (RIPRAP)
SY 151.000 $25.000 $30.000 $80.630 $15.000 $26.420 $30.000 $50.000 $20.000
REMOV CONC (DRIVEWAYS)
SY 1,331.000 $15.060 $20.000 $39.130 $20.000 $29.980 $20.000 $20.000 $22.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 128.000 $20.000 $20.000 $135.340 $25.000 $31.170 $20.000 $50.000 $20.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 1,460.000 $16.000 $5.000 $19.430 $12.000 $27.330 $5.000 $20.000 $8.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 247.000 $25.000 $20.000 $85.860 $20.000 $32.310 $25.000 $26.000 $35.000
EMBANK (FNL)(OC)(TY C)
CY 200.000 $30.000 $25.000 $160.220 $30.000 $39.900 $50.000 $50.000 $75.000
FURN & PLACE TOPSOIL (4")
SY 1,777.000 $5.000 $4.000 $6.580 $7.000 $4.490 $2.000 $2.400 $7.000
BLOCK SODDING
SY 1,777.000 $2.970 $8.000 $4.210 $10.000 $3.690 $5.000 $5.800 $15.000
VEGETATIVE WATERING
TGL 34.000 $100.000 $90.000 $48.700 $85.000 $30.800 $200.000 $35.000 $80.000
FULL - DEPTH REPAIR CRCP (9")
CY 38.000 $965.830 $150.000 $764.210 $950.000 $773.840 $1,500.000 $870.000 $2,200.000
CUT & RESTORE ASPH PAVING
SY 1,263.000 $150.000 $130.000 $65.410 $110.000 $108.460 $160.000 $140.000 $200.000
CEM STABIL BKFL
CY 11.000 $100.000 $11.000 $71.330 $120.000 $261.550 $110.000 $89.000 $150.000
CL A CONC (COLLAR)
EA 1.000 $1,700.000 $2,000.000 $1,791.140 $2,500.000 $1,060.500 $1,500.000 $1,000.000 $3,300.000
RIPRAP (CONC)(6 IN)
CY 23.000 $750.000 $450.000 $708.060 $800.000 $773.840 $560.000 $497.000 $705.000
RIPRAP (MOW STRIP)(4 IN)
CY 57.000 $800.000 $450.000 $738.790 $850.000 $773.840 $650.000 $738.000 $630.000
RAIL (HANDRAIL)(TY B)
LF 1,043.000 $164.240 $120.000 $104.460 $145.000 $104.760 $180.000 $89.000 $130.000
RC PIPE (CL IV)(24 IN)
LF 20.000 $135.000 $150.000 $206.500 $150.000 $220.000 $220.000 $107.000 $240.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $2,500.000 $3,500.000 $3,852.190 $3,000.000 $2,035.000 $8,000.000 $1,616.000 $2,050.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 2.000 $600.000 $550.000 $3,113.290 $2,000.000 $399.000 $1,000.000 $475.000 $1,800.000
REMOV STR (SET)
EA 1.000 $500.000 $400.000 $632.900 $1,000.000 $825.000 $1,000.000 $250.000 $500.000
REMOV STR (PIPE)
LF 7.000 $50.000 $20.000 $90.420 $50.000 $825.000 $50.000 $35.000 $85.000
MOBILIZATION
LS 1.000 $230,000.000 $205,000.000 $219,552.970 $200,000.000 $207,288.050 $170,000.000 $290,000.000 $350,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $10,150.000 $10,636.540 $5,000.000 $4,950.000 $8,000.000 $13,000.000 $94,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,000.000 $15,000.000 $15,275.780 $20,000.000 $1.100 $200.000 $21,600.000 $18,000.000
TMA (STATIONARY)
DAY 116.000 $200.000 $250.000 $219.510 $200.000 $1.100 $250.000 $543.000 $850.000
TMA (MOBILE OPERATION)
DAY 10.000 $500.000 $550.000 $1,142.720 $260.000 $1.100 $250.000 $887.000 $1,500.000
SANDBAGS FOR EROSION CONTROL
EA 500.000 $15.000 $20.000 $3.140 $15.000 $2.750 $10.000 $12.000 $2.500
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 2,000.000 $6.000 $10.000 $3.140 $10.000 $2.750 $8.000 $7.200 $2.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 2,000.000 $2.000 $1.000 $1.250 $2.000 $2.750 $2.000 $1.700 $1.000
COLORED TEXTURED CONC (4")
SY 746.000 $120.000 $115.000 $89.850 $125.000 $118.880 $120.000 $300.000 $115.000
CONC CURB (TY I)
LF 887.000 $20.640 $15.000 $19.250 $12.000 $57.960 $40.000 $5.900 $20.000
CONC CURB (TY II)
LF 3,057.000 $20.000 $8.000 $20.950 $10.000 $57.960 $30.000 $36.700 $20.000
CONC CURB & GUTTER (TY II)
LF 95.000 $30.000 $10.000 $29.540 $40.000 $57.960 $100.000 $50.000 $50.000
CONC CURB (SLOTTED)
LF 9,098.000 $10.000 $12.000 $17.160 $17.500 $29.150 $28.000 $9.400 $12.000
DRIVEWAYS (CONC) (HES)
SY 1,665.000 $120.000 $130.000 $98.800 $120.000 $117.040 $150.000 $160.000 $130.000
CONC SIDEWALKS (4")
SY 2,036.000 $70.000 $80.000 $68.460 $95.000 $88.950 $80.000 $140.000 $70.000
CURB RAMPS (TY 1)
SY 289.000 $160.000 $225.000 $240.210 $280.000 $133.880 $130.000 $300.000 $120.000
CURB RAMPS (TY 5)
SY 259.000 $250.000 $225.000 $236.550 $280.000 $133.880 $150.000 $300.000 $150.000
CURB RAMPS (TY 7)
SY 10.000 $250.000 $225.000 $296.640 $280.000 $133.880 $155.000 $330.000 $160.000
CURB RAMPS (TY 21)
SY 92.000 $164.660 $205.000 $291.870 $260.000 $133.880 $220.000 $300.000 $160.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 919.000 $180.000 $75.000 $159.910 $130.000 $239.100 $200.000 $271.000 $500.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,255.000 $35.000 $40.000 $34.810 $45.000 $30.530 $50.000 $36.000 $25.000
REMOVE METAL BEAM GUARD FENCE
LF 1,019.000 $5.000 $10.000 $7.530 $8.000 $6.600 $8.000 $5.500 $2.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 1.000 $300.000 $250.000 $295.540 $500.000 $256.970 $240.000 $294.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $7,000.000 $3,500.000 $4,766.050 $3,500.000 $4,179.520 $4,000.000 $4,080.000 $3,100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $5,000.000 $500.000 $648.410 $350.000 $568.610 $520.000 $351.000 $200.000
GROUND BOX TY D (162922)
EA 11.000 $1,500.000 $950.000 $1,066.210 $1,000.000 $962.500 $1,800.000 $1,050.000 $850.000
ALUMINUM SIGNS (TY A)
SF 516.000 $76.890 $50.000 $33.860 $38.000 $33.000 $35.000 $36.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $800.000 $800.000 $1,017.290 $1,000.000 $848.100 $850.000 $926.000 $771.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 12.000 $800.000 $800.000 $1,058.680 $850.000 $767.800 $860.000 $838.000 $698.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 13.000 $850.000 $1,000.000 $1,211.710 $850.000 $955.900 $940.000 $1,043.000 $869.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 12.000 $850.000 $1,250.000 $1,254.370 $850.000 $1,030.700 $860.000 $1,125.000 $937.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $750.000 $500.000 $564.470 $3,000.000 $463.100 $200.000 $506.000 $421.000
REMOVE SM RD SN SUP&AM
EA 3.000 $100.000 $300.000 $106.620 $500.000 $82.500 $30.000 $90.000 $75.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF1
EA 17.000 $40.000 $25.000 $26.310 $500.000 $23.070 $35.000 $24.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(YFLX)SRF
EA 55.000 $110.000 $150.000 $137.770 $100.000 $120.810 $120.000 $114.000 $95.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 16.000 $10.000 $20.000 $25.080 $85.000 $29.890 $30.000 $18.000 $15.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,750.000 $2.000 $2.000 $2.510 $2.000 $1.100 $1.500 $1.200 $1.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,339.000 $12.000 $8.000 $6.270 $10.500 $8.260 $8.000 $9.000 $7.510
RE PM TY II (W) 4" (SLD)
LF 18.000 $1.000 $1.000 $1.060 $10.000 $0.550 $2.500 $0.600 $0.500
RE PM TY II (W) (CURB)
LF 1,512.000 $1.000 $3.000 $3.140 $2.750 $2.200 $2.000 $2.400 $2.000
RE PM TY II (Y)(CURB)
LF 1,447.000 $1.000 $3.000 $3.140 $2.750 $2.200 $1.200 $2.400 $2.000
RE PM TY II (R&W) 6" (FIRE LANE)
LF 10.000 $25.000 $30.000 $3.140 $100.000 $27.500 $10.000 $30.000 $25.000
PAVEMENT SLER 4"
LF 18.000 $1.000 $2.000 $0.190 $6.000 $1.100 $8.000 $1.200 $1.000
PAVEMENT SLER 6"
LF 717.000 $0.900 $2.000 $0.240 $1.000 $1.100 $0.250 $1.200 $1.000
PAVEMENT SLER 8"
LF 1,750.000 $1.000 $2.000 $0.310 $1.000 $1.100 $1.400 $1.200 $1.000
PAVEMENT SLER 24"
LF 2,367.000 $5.000 $3.000 $0.630 $2.000 $2.870 $3.000 $3.100 $2.610
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 265.000 $1.800 $2.000 $2.200 $6.000 $1.100 $4.000 $1.200 $1.000
REFL PAV MRKR TY II-A-A
EA 14.000 $8.000 $8.000 $7.460 $60.000 $7.570 $4.000 $8.300 $6.880
ELIM EXT PM & MRKS (4")
LF 109.000 $1.000 $2.000 $0.370 $1.500 $1.100 $3.000 $1.200 $1.000
ELIM EXT PM & MRKS (8")
LF 287.000 $2.000 $2.000 $0.510 $2.000 $1.100 $4.000 $1.200 $1.000
ELIM EXT PM & MRKS (12")
LF 1,703.000 $2.000 $3.000 $0.630 $1.400 $2.200 $4.000 $2.400 $2.000
ELIM EXT PM & MRKS (24")
LF 414.000 $5.000 $5.000 $1.880 $3.000 $4.400 $4.000 $4.800 $4.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000 $60.000 $150.000 $25.100 $150.000 $122.100 $100.000 $134.000 $111.000
ELIM EXT PM & MRKS (WORD)
EA 1.000 $60.000 $150.000 $31.360 $150.000 $122.100 $100.000 $134.000 $111.000
PAV SURF PREP FOR MRK (4")
LF 18.000 $1.000 $2.000 $0.130 $1.200 $1.100 $0.250 $1.200 $1.000
PAV SURF PREP FOR MRK (6")
LF 717.000 $0.900 $2.000 $0.190 $0.600 $1.100 $0.750 $1.200 $1.000
PAV SURF PREP FOR MRK (8")
LF 1,750.000 $1.000 $2.000 $0.240 $0.600 $1.100 $1.000 $1.200 $1.000
PAV SURF PREP FOR MRK (24")
LF 2,367.000 $0.670 $2.000 $0.630 $1.000 $1.100 $1.000 $1.200 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 1.000 $35.000 $30.000 $6.270 $50.000 $27.500 $5.000 $30.000 $25.000
PED DETECT PUSH BUTTON (APS)
EA 20.000 $922.550 $1,250.000 $1,166.560 $1,200.000 $1,375.000 $1,500.000 $1,500.000 $930.000
REMOVAL OF GROUND BOXES
EA 10.000 $300.000 $500.000 $188.150 $160.000 $115.500 $1,000.000 $126.000 $150.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 20.000 $150.000 $200.000 $94.080 $100.000 $55.000 $500.000 $60.000 $75.000
SOLAR-POWERED RRFB (TWO-WAY WIRELESS)
EA 18.000 $6,622.570 $10,000.000 $8,799.390 $11,000.000 $9,625.000 $10,000.000 $10,500.000 $7,015.000
Totals: $2,179,545.800 $2,086,922.000 $2,259,895.000 $2,293,251.250 $2,396,673.950 $2,520,514.900 $2,933,722.600 $3,517,679.080
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $4,875.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $11,579.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,000.00
Total: $18,454.00