Show Job Controls
Bid Cobra

GALVESTON FM 518 (0976-03-120)

Items: 77

County: GALVESTON
Length: 0.0000 MILES (0.0330 MILES)
Highway: FM 518
District: HOUSTON
Control Number: 0976-03-120
DBE Goal: 0.0%
Project: STP 2026(996)MM
Guaranty: $10,000.00
Time: 61 WORKING DAYS
Engineer's Estimate: $474,314.60
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263012
Type: INTERSECTION IMPROVEMENT
Project ID: A00207336
Contract Type: FEDERAL
Project Description: REPLACE SINGLE LEFT TURN LANE WITH DUAL LEFT TURN LANE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$474,314.60
Over/Under Est: -21.15% -$100,331.93
$400,184.50
Over/Under Est: -15.63% -$74,130.10
Amt Left: 7.01% $26,201.83
Over/Under Est: 51.79% $245,660.12
Amt Left: 92.52% $345,992.05
Delta: -79.91% -$319,790.22
Over/Under Est: 66.46% $315,208.50
Amt Left: 111.11% $415,540.43
Delta: -9.66% -$69,548.38

Bid Items & Bid Tabulations

77 Total 0 of 77
GALVESTON  |  FM 518  |  HOUSTON  |  0976-03-120  |  09/02/2026 1:00 PM CDT  |  $474,314.60  |  STP 2026(996)MM  |  INTERS IMPRV  |  61 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
VACA UNDERGROUND UTILITIES INC
CASTILLO ARANDA LLC
THIRD COAST SERVICES LLC
RAGLE CONSTRUCTION, INC.
REMOV CONC (PAV)
SY 46.000 $30.000 $12.000 $20.000 $101.170 $100.000
REMOV CONC (MEDIANS)
SY 180.000 $8.000 $25.000 $20.000 $59.510 $50.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 195.000 $16.000 $20.000 $20.000 $59.510 $30.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 114.000 $5.000 $10.000 $10.000 $23.800 $50.000
BACKFILL (TY B)(VEH)
CY 10.000 $100.000 $100.000 $50.000 $136.210 $600.000
SPEC EXCAV WORK (VEHICLE)
CY 40.000 $60.000 $275.000 $100.000 $162.980 $300.000
BLOCK SODDING
SY 1,740.000 $8.000 $10.000 $7.000 $4.110 $14.000
VEGETATIVE WATERING
TGL 44.000 $30.000 $20.000 $95.000 $49.590 $65.000
CONC PVMT (CRCP)(FAST TRK) (13")
SY 143.000 $250.000 $175.000 $150.000 $624.860 $300.000
MOBILIZATION
LS 1.000 $44,588.600 $35,000.000 $40,500.000 $71,997.470 $78,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $16,000.000 $2,500.000 $15,500.000 $14,507.230 $68,500.000
TMA (STATIONARY)
DAY 84.000 $300.000 $175.000 $300.000 $0.050 $300.000
TMA (MOBILE OPERATION)
DAY 14.000 $370.000 $175.000 $800.000 $550.510 $620.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 185.000 $4.000 $1.000 $6.000 $4.460 $3.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 185.000 $1.000 $1.000 $2.000 $1.190 $1.000
CONC CURB (SLOTTED)
LF 1,090.000 $16.000 $16.500 $11.000 $101.170 $80.000
CONC CURB (DOWEL)
LF 276.000 $40.000 $30.000 $9.000 $119.020 $100.000
CONC SIDEWALKS (4")
SY 162.000 $100.000 $65.000 $85.000 $267.800 $100.000
CURB RAMPS (TY 1)
EA 1.000 $2,500.000 $3,200.000 $1,600.000 $6,546.160 $1,550.000
CURB RAMPS (TY 22)
EA 1.000 $6,000.000 $3,500.000 $1,650.000 $6,546.160 $2,900.000
CURB RAMPS (TY 5) (MOD)
EA 3.000 $8,000.000 $5,800.000 $1,700.000 $6,546.160 $4,100.000
CONC MEDIAN
SY 234.000 $150.000 $102.000 $85.000 $278.510 $85.000
CONC DIRECTIONAL ISLAND
SY 30.000 $250.000 $102.000 $90.000 $297.550 $170.000
CONDT (PVC) (SCH 40) (2")
LF 620.000 $15.000 $14.000 $12.000 $13.240 $9.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 450.000 $33.000 $15.000 $20.000 $20.040 $12.000
CONDT (RM) (2")
LF 5.000 $32.000 $50.000 $150.000 $29.700 $100.000
ELEC CONDR (NO.8) BARE
LF 620.000 $2.500 $2.250 $3.500 $2.220 $2.800
GROUND BOX TY D (162922)W/APRON
EA 5.000 $1,800.000 $1,500.000 $1,150.000 $1,368.140 $950.000
REMOVE GROUND BOX
EA 4.000 $150.000 $450.000 $200.000 $113.510 $150.000
ZINC-COAT STL WIRE STRAND (5/16")
LF 330.000 $3.000 $8.000 $8.000 $2.220 $6.000
ALUMINUM SIGNS (TY A)
SF 52.500 $55.000 $40.000 $30.000 $34.830 $18.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $1,000.000 $1,100.000 $1,000.000 $951.990 $895.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 3.000 $800.000 $2,100.000 $2,000.000 $907.730 $1,774.000
IN SM RD SN SUP&AM TY10BWG(2)SA(P)
EA 1.000 $800.000 $2,400.000 $2,500.000 $1,412.150 $2,060.000
REMOVE SM RD SN SUP&AM
EA 7.000 $150.000 $150.000 $150.000 $239.870 $125.000
RE PM TY II (W) 36" (YLD TRI)
EA 4.000 $80.000 $5.500 $80.000 $89.260 $65.000
RE PM TY II (Y)(CURB)
LF 1,855.000 $1.500 $1.350 $2.000 $4.230 $1.150
RE PM TY III (W)(6")(SLD)
LF 1,190.000 $1.500 $1.750 $2.000 $1.310 $1.500
RE PM TY III (W)(6")(BRK)
LF 560.000 $3.000 $2.300 $2.500 $1.790 $2.000
RE PM TY III (W)(6")(DOT)
LF 201.000 $2.000 $2.300 $2.500 $1.790 $2.000
RE PM TY III (W)(8")(SLD)
LF 2,170.000 $2.000 $2.300 $2.500 $2.380 $2.000
RE PM TY III (W)(8")(DOT)
LF 450.000 $1.500 $2.300 $2.500 $2.380 $2.000
RE PM TY III (W)(24")(SLD)
LF 799.000 $10.000 $12.500 $13.000 $13.090 $11.000
RE PM TY III (Y)(6")(SLD)
LF 686.000 $2.000 $1.750 $2.000 $1.790 $1.500
RE PM TY III (Y)(8")(SLD)
LF 230.000 $3.000 $2.300 $3.000 $2.380 $2.000
RE PM TY III (Y)(12")(SLD)
LF 100.000 $7.000 $3.500 $4.000 $5.950 $3.000
RE PM TY III (W)(ARROW)
EA 16.000 $250.000 $230.000 $250.000 $297.550 $200.000
RE PM TY III (W)(DBL ARROW)
EA 2.000 $400.000 $455.000 $450.000 $357.060 $400.000
RE PM TY III (W)(WORD)
EA 15.000 $350.000 $230.000 $250.000 $297.550 $200.000
RE PM TY III (BLK)(6")(SHADOW)
LF 560.000 $3.000 $2.850 $3.000 $1.790 $2.500
REFL PAV MRKR TY I-C
EA 8.000 $6.000 $8.000 $8.000 $11.900 $7.000
REFL PAV MRKR TY II-A-A
EA 36.000 $6.000 $8.000 $8.000 $11.900 $7.000
REFL PAV MRKR TY II-C-R
EA 176.000 $6.000 $8.000 $8.000 $11.900 $7.000
ELIM EXT PM & MRKS (6")
LF 4,864.000 $1.000 $0.500 $1.000 $1.190 $0.400
ELIM EXT PM & MRKS (8")
LF 1,151.000 $1.000 $0.950 $1.000 $1.190 $0.800
ELIM EXT PM & MRKS (12")
LF 1,188.000 $2.000 $1.750 $2.000 $2.380 $1.500
ELIM EXT PM & MRKS (24")
LF 1,028.000 $3.000 $3.500 $3.500 $3.570 $3.000
ELIM EXT PM & MRKS (ARROW)
EA 11.000 $75.000 $60.000 $55.000 $29.760 $50.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 2.000 $100.000 $120.000 $125.000 $29.750 $100.000
ELIM EXT PM & MRKS (WORD)
EA 10.000 $100.000 $60.000 $60.000 $29.750 $50.000
PAV SURF PREP FOR MRK (6")
LF 1,951.000 $1.000 $0.120 $0.500 $1.190 $0.100
PAV SURF PREP FOR MRK (8")
LF 2,850.000 $1.000 $0.250 $0.500 $1.190 $0.200
PAV SURF PREP FOR MRK (12")
LF 100.000 $1.000 $0.350 $0.500 $1.190 $0.300
PAV SURF PREP FOR MRK (24")
LF 799.000 $2.000 $0.450 $0.500 $1.190 $0.400
PAV SURF PREP FOR MRK (ARROW)
EA 16.000 $12.000 $10.250 $10.000 $17.850 $9.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $40.000 $17.000 $20.000 $17.850 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 15.000 $15.000 $10.200 $10.000 $17.850 $9.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $12,000.000 $15,000.000 $4,000.000 $5,025.620 $3,600.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $350.000 $400.000 $320.000 $279.450 $280.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $350.000 $400.000 $320.000 $279.450 $280.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $350.000 $400.000 $320.000 $279.450 $280.000
BACKPLATE W/REFL BRDR(4 SEC)ALUM
EA 2.000 $240.000 $250.000 $250.000 $274.690 $200.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,555.000 $2.500 $3.000 $3.000 $1.890 $2.200
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,555.000 $4.000 $4.000 $3.000 $3.320 $2.400
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 30.000 $4.650 $5.000 $8.000 $4.250 $6.000
PED POLE ASSEMBLY
EA 7.000 $2,000.000 $3,500.000 $3,000.000 $2,864.920 $2,600.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $918.000 $900.000 $1,000.000 $1,120.230 $888.000
Totals: $474,314.600 $373,982.670 $400,184.500 $719,974.715 $789,523.100
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $2,400.00
Total: $17,400.00