GALVESTON FM 2004 (1911-01-023)

Items: 83

County: GALVESTON
Length: 0.0000 MILES (0.0246 MILES)
Highway: FM 2004
District: HOUSTON
Control Number: 1911-01-023
DBE Goal: 0.0%
Project: BR 2025(927)
Guaranty: $68,000.00
Time: 142 WORKING DAYS
Engineer's Estimate: $3,375,346.25
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263026
Type: BRIDGE REPLACEMENT
Project ID: A00192185
Contract Type: FEDERAL
Project Description: REPLACE BRIDGE AND APPROACHES (NBI NO. 120850191101003)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (11)
E
Engineer's Estimate
$3,375,346.25
Over/Under Est: -5.2% -$175,520.85
Over/Under Est: 6.88% $232,296.75
Amt Left: 12.74% $407,817.60
$3,636,683.59
Over/Under Est: 7.74% $261,337.34
Amt Left: 13.65% $436,858.19
Delta: -0.80% -$29,040.59
Over/Under Est: 9.67% $326,300.23
Amt Left: 15.68% $501,821.08
Delta: -1.79% -$64,962.89
$3,727,075.00
Over/Under Est: 10.42% $351,728.75
Amt Left: 16.48% $527,249.60
Delta: -0.69% -$25,428.52
Over/Under Est: 12.82% $432,555.02
Amt Left: 19% $608,075.87
Delta: -2.17% -$80,826.27
$3,845,653.00
Over/Under Est: 13.93% $470,306.75
Amt Left: 20.18% $645,827.60
Delta: -0.99% -$37,751.73
Over/Under Est: 14.15% $477,709.04
Amt Left: 20.41% $653,229.89
Delta: -0.19% -$7,402.29
Over/Under Est: 18.29% $617,473.51
Amt Left: 24.78% $792,994.36
Delta: -3.63% -$139,764.47
Over/Under Est: 20.44% $689,906.46
Amt Left: 27.05% $865,427.31
Delta: -1.81% -$72,432.95
$4,447,136.25
Over/Under Est: 31.75% $1,071,790.00
Amt Left: 38.98% $1,247,310.85
Delta: -9.39% -$381,883.54

Bid Items & Bid Tabulations

83 Total 0 of 83
GALVESTON  |  FM 2004  |  HOUSTON  |  1911-01-023  |  09/02/2026 1:00 PM CDT  |  $3,375,346.25  |  BR 2025(927)  |  BRIDGE REPL  |  142 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
JAMES CONSTRUCTION GROUP, LLC
ISI CONTRACTING, INC.
TEXAS STEEL INDUSTRIAL PLACING, LLC
MC2 CIVIL, LLC
SER CONSTRUCTION PARTNERS, LLC
CASTILLO ARANDA LLC
FORDE CONSTRUCTION COMPANY, INC.
RAGLE CONSTRUCTION, INC.
JOHN REED AND COMPANY, LLC
REXCON ENTERPRISES, LLC
RMV (10") TRT/UNTRT BASE & ASPH PAV
SY 4,028.000 $12.500 $13.000 $11.450 $9.000 $8.000 $8.500 $16.400 $20.000 $9.000 $13.400 $12.000 $17.000
EXCAV (ROADWAY)
CY 2,830.000 $20.000 $21.000 $12.170 $19.000 $20.000 $25.000 $27.500 $15.000 $25.000 $38.000 $40.000 $13.000
SUBGR WIDEN (OC)
STA 6.000 $5,000.000 $985.000 $109.380 $998.000 $5,000.000 $1,600.000 $1,280.100 $3,050.000 $3,300.000 $1,425.000 $800.000 $5,000.000
EMBANK (FNL)(DC)(TY C)
CY 742.000 $20.000 $32.500 $19.960 $51.000 $25.000 $20.000 $2.700 $27.000 $25.000 $41.000 $50.000 $19.000
BROADCAST SEED (PERM_RURAL_CLAY)
SY 2,780.000 $0.250 $1.000 $0.540 $0.360 $0.540 $0.400 $0.300 $0.500 $0.500 $0.540 $0.250 $1.000
SOIL RET BLKT(SL_MOD_CLAY_SHORT_ROLL)
SY 93.000 $0.250 $2.000 $1.350 $4.370 $1.350 $15.000 $11.100 $5.000 $20.000 $1.350 $3.000 $30.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 60.000 $350.000 $350.000 $371.530 $366.000 $332.000 $350.000 $381.000 $350.000 $360.000 $332.000 $332.000 $340.000
LIME TRT (EXIST MATL)(6")
SY 4,439.000 $3.000 $5.000 $8.440 $15.000 $6.000 $6.000 $7.400 $5.000 $7.000 $3.900 $4.000 $9.000
CEM TRT(PLNT MX)(CL N)(TYA)(GR1-2)(8")
SY 4,439.000 $20.000 $37.000 $17.580 $35.000 $20.000 $36.000 $40.500 $60.000 $33.000 $40.000 $60.000 $47.000
PRIME COAT(MC-30 OR AE-P)
GAL 889.000 $5.000 $6.500 $6.630 $6.480 $8.000 $4.000 $3.300 $8.000 $5.000 $8.200 $4.000 $6.500
ASPH (AC-20-5TR)
GAL 1,820.000 $5.000 $6.000 $6.120 $5.470 $8.000 $4.500 $16.700 $7.000 $5.000 $6.000 $8.000 $6.000
AGGR (TY-B, GR-3)(SAC-B)
CY 41.000 $350.000 $560.000 $561.000 $598.000 $280.000 $550.000 $44.600 $600.000 $427.000 $550.000 $465.000 $565.000
SP MIXES SP-B PG70-22
TON 1,444.000 $175.000 $165.000 $165.000 $195.000 $210.000 $135.000 $150.400 $195.000 $148.000 $146.000 $190.000 $165.000
SP MIXES SP-D SAC-A PG70-22
TON 666.000 $200.000 $200.000 $200.000 $258.000 $210.000 $150.000 $176.900 $220.000 $160.000 $155.000 $205.000 $200.000
DRILL SHAFT (36 IN)
LF 1,751.000 $320.000 $410.000 $360.000 $429.000 $500.000 $600.000 $461.700 $450.000 $500.000 $400.000 $360.000 $490.000
CL C CONC (ABUT)
CY 85.000 $1,200.000 $660.000 $946.190 $1,997.000 $1,100.000 $1,400.000 $1,753.200 $1,200.000 $2,100.000 $850.000 $1,800.000 $1,450.000
CL C CONC (CAP)
CY 79.600 $1,500.000 $775.000 $1,135.340 $785.000 $1,500.000 $1,300.000 $1,610.200 $1,200.000 $2,100.000 $980.000 $1,800.000 $2,050.000
REINF CONC SLAB
SF 11,541.000 $30.000 $24.500 $40.000 $31.000 $22.000 $20.000 $31.300 $27.000 $28.000 $24.000 $38.000 $46.000
APPROACH SLAB
CY 114.900 $1,000.000 $800.000 $571.300 $760.000 $550.000 $710.000 $838.600 $650.000 $758.000 $560.000 $1,200.000 $975.000
PRESTR CONC GIRDER (TX28)
LF 1,493.300 $250.000 $203.000 $250.000 $165.000 $230.000 $210.000 $239.400 $310.000 $250.000 $210.000 $280.000 $290.000
RIPRAP (CONC)(4 IN)
CY 92.000 $625.000 $610.000 $490.400 $563.000 $550.000 $750.000 $714.500 $450.000 $860.000 $735.000 $600.000 $670.000
RIPRAP (CONC)(CL B)
CY 50.300 $625.000 $570.000 $522.780 $482.000 $550.000 $650.000 $713.300 $450.000 $805.000 $593.000 $600.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 22.000 $650.000 $610.000 $709.980 $1,000.000 $600.000 $1,000.000 $814.300 $550.000 $1,200.000 $700.000 $700.000 $780.000
STR STEEL (MISC NON-BRIDGE)
LB 374.000 $5.000 $24.000 $26.530 $15.000 $35.000 $25.000 $17.600 $25.000 $44.000 $25.000 $18.000 $29.000
RAIL (TY C223)
LF 358.000 $135.000 $250.000 $162.380 $307.000 $220.000 $220.000 $231.200 $120.000 $188.000 $185.000 $150.000 $240.000
RAIL (TY PR22)
LF 378.000 $150.000 $210.000 $155.130 $117.000 $175.000 $175.000 $245.300 $200.000 $134.000 $124.000 $180.000 $220.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 165.000 $225.000 $185.000 $198.390 $178.000 $200.000 $180.000 $201.700 $200.000 $245.000 $202.000 $165.000 $270.000
RC PIPE (CL III)(36 IN)
LF 233.000 $225.000 $143.000 $137.860 $407.000 $200.000 $200.000 $210.000 $180.000 $164.000 $135.000 $200.000 $205.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 2.000 $7,000.000 $4,150.000 $5,181.660 $4,901.000 $5,000.000 $7,000.000 $9,195.300 $1,650.000 $6,000.000 $5,294.000 $5,340.810 $9,950.000
REMOV STR (SET)
EA 2.000 $750.000 $1,250.000 $549.400 $1,512.000 $750.000 $800.000 $1,019.500 $450.000 $575.000 $600.000 $1,000.000 $2,150.000
REMOV STR (PIPE)
LF 26.000 $35.000 $48.000 $37.830 $47.000 $50.000 $50.000 $43.100 $20.000 $52.000 $26.500 $10.000 $39.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $76,000.000 $312,000.000 $79,272.000 $200,000.000 $200,000.000 $74,916.500 $155,000.000 $78,000.000 $390,000.000 $200,000.000 $225,000.000
REMOV STR (APPROACH SLAB)
EA 2.000 $5,000.000 $820.000 $2,981.420 $1,832.000 $5,000.000 $1,500.000 $116.400 $1,650.000 $10,000.000 $9,900.000 $3,000.000 $4,250.000
MOBILIZATION
LS 1.000 $320,000.000 $184,000.000 $360,000.000 $300,000.000 $370,131.330 $370,000.000 $380,000.000 $300,000.000 $380,000.000 $390,000.000 $395,000.000 $450,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $12,000.000 $13,200.000 $10,000.000 $8,106.000 $4,000.000 $5,000.000 $3,156.300 $10,000.000 $7,000.000 $56,500.000 $4,000.000 $6,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 656.000 $100.000 $56.000 $73.960 $89.000 $90.000 $80.000 $113.600 $150.000 $100.000 $20.000 $100.000 $42.000
TMA (STATIONARY)
DAY 10.000 $275.000 $443.000 $308.680 $212.000 $250.000 $350.000 $378.800 $350.000 $200.000 $287.000 $320.000 $400.000
TMA (MOBILE OPERATION)
DAY 3.000 $300.000 $1,000.000 $673.410 $930.000 $1,000.000 $650.000 $973.600 $550.000 $200.000 $615.000 $600.000 $780.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 208.000 $40.000 $40.000 $38.000 $44.000 $38.000 $35.000 $89.100 $30.000 $40.000 $38.000 $50.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 208.000 $10.000 $21.000 $20.000 $29.000 $20.000 $15.000 $22.300 $5.000 $21.000 $20.000 $10.000 $17.250
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,351.000 $5.000 $3.250 $3.000 $6.320 $3.000 $2.250 $2.000 $5.000 $3.500 $3.000 $4.000 $3.600
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,351.000 $1.000 $1.000 $1.000 $1.620 $1.000 $0.600 $0.700 $1.000 $1.600 $1.000 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 190.000 $5.000 $9.000 $8.500 $6.150 $8.500 $8.500 $6.700 $7.000 $5.000 $8.500 $10.000 $16.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 190.000 $1.000 $1.000 $1.000 $1.320 $1.000 $3.500 $2.200 $1.000 $1.000 $1.000 $2.000 $2.000
PORT CTB (REMOVE)(F-SHAPE)(TY 1)
LF 174.000 $10.000 $27.000 $25.870 $30.630 $30.000 $12.000 $22.600 $30.000 $23.000 $17.000 $10.000 $9.500
CONC CURB & GUTTER (TY II)
LF 1,111.000 $50.000 $30.000 $24.390 $34.000 $35.000 $15.000 $32.400 $7.000 $36.000 $29.000 $30.000 $43.000
DRIVEWAYS (ACP)
SY 381.000 $45.000 $97.000 $125.350 $145.620 $55.000 $65.000 $89.500 $60.000 $95.000 $92.000 $80.000 $140.000
MTL W-BEAM GD FEN (STEEL POST)
LF 237.500 $40.000 $33.000 $32.500 $30.240 $32.700 $33.000 $36.200 $40.000 $45.000 $32.700 $42.000 $33.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,500.000 $1,700.000 $1,685.000 $1,771.000 $1,650.000 $1,685.000 $1,877.100 $1,650.000 $1,700.000 $1,650.000 $1,580.000 $1,650.000
MTL THRIE-BEAM GD FEN (STEEL POST)
EA 4.000 $250.000 $1,700.000 $1,650.000 $2,290.000 $1,615.000 $1,650.000 $1,838.100 $2,500.000 $1,600.000 $1,615.000 $1,450.000 $1,600.000
REMOVE METAL BEAM GUARD FENCE
LF 290.000 $3.000 $5.000 $5.000 $2.700 $5.000 $5.000 $5.600 $20.000 $6.000 $5.000 $5.000 $5.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 3.000 $250.000 $250.000 $250.000 $237.460 $150.000 $250.000 $278.500 $500.000 $325.000 $150.000 $300.000 $150.000
GUARDRAIL END TREATMENT (INSTALL)
EA 3.000 $3,500.000 $3,350.000 $3,250.000 $4,590.000 $3,125.000 $3,250.000 $3,620.500 $2,500.000 $3,000.000 $3,125.000 $2,400.000 $3,150.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000 $300.000 $250.000 $250.000 $324.010 $275.000 $250.000 $278.500 $500.000 $325.000 $275.000 $300.000 $275.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $1,000.000 $1,500.000 $1,500.000 $1,890.000 $2,500.000 $1,500.000 $1,671.000 $850.000 $4,300.000 $1,050.000 $2,500.000 $1,400.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 1.000 $500.000 $500.000 $485.000 $930.000 $750.000 $500.000 $540.300 $300.000 $850.000 $390.020 $810.000 $375.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 6.000 $750.000 $1,000.000 $875.000 $864.000 $900.000 $1,000.000 $974.800 $700.000 $900.000 $900.000 $1,035.000 $1,000.000
REMOV SM RD SN&AM (WAYFINDING)
EA 4.000 $250.000 $125.000 $100.000 $108.000 $250.000 $1,000.000 $111.400 $300.000 $109.000 $146.510 $250.000 $1,000.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 19.000 $40.000 $35.000 $35.000 $103.000 $45.000 $50.000 $39.000 $50.000 $31.000 $45.000 $28.000 $50.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 4.000 $175.000 $120.000 $95.000 $103.000 $100.000 $75.000 $105.800 $250.000 $230.000 $100.000 $210.000 $75.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 4.000 $25.000 $110.000 $25.000 $91.800 $50.000 $25.000 $27.900 $30.000 $27.000 $20.000 $25.000 $25.000
REFL PAV MRK TY I (W)8"(LNDP)(100MIL)
LF 85.000 $1.500 $4.000 $2.500 $3.240 $2.500 $2.500 $3.300 $4.000 $2.750 $3.000 $3.000 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 100.000 $1.500 $4.000 $1.250 $3.150 $1.250 $1.250 $3.300 $4.000 $1.350 $2.000 $3.000 $1.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $200.000 $180.000 $200.000 $147.000 $200.000 $200.000 $206.100 $200.000 $218.000 $300.000 $185.000 $200.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 1.000 $200.000 $205.000 $250.000 $168.000 $250.000 $250.000 $211.700 $200.000 $274.000 $300.000 $190.000 $250.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 2.000 $50.000 $128.000 $65.000 $105.000 $65.000 $65.000 $111.400 $150.000 $71.000 $35.000 $100.000 $65.000
RE PM TY I(W)24"(SLD)(100MIL)(CALLOUT)
LF 69.000 $10.000 $19.000 $15.000 $15.760 $15.000 $15.000 $10.300 $10.000 $16.000 $12.000 $9.250 $15.000
ALL-WTHER PM TY I (W)6"(SLD)(100MIL)
LF 1,841.000 $1.000 $3.500 $1.500 $2.890 $1.500 $1.500 $4.500 $5.000 $1.650 $2.000 $4.000 $1.500
ALL-WTHER PM TY I (W)6"(BRK)(100MIL)
LF 12.000 $1.250 $4.000 $1.500 $2.990 $1.500 $1.500 $4.500 $5.000 $1.650 $2.000 $4.000 $1.500
ALL-WTHER PM TY I (Y)6"(SLD)(100MIL)
LF 1,965.000 $1.000 $3.500 $1.500 $2.890 $1.500 $1.500 $4.500 $5.000 $1.650 $2.000 $4.000 $1.500
ALL-WTHER PM TY I (Y)6"(BRK)(100MIL)
LF 206.000 $1.250 $3.500 $1.500 $2.890 $1.500 $1.500 $4.500 $5.000 $1.650 $2.000 $4.000 $1.000
PAVEMENT SLER 6"
LF 805.000 $0.250 $0.500 $0.250 $0.320 $0.250 $0.250 $0.600 $1.000 $0.280 $0.500 $0.500 $0.250
REFL PAV MRKR TY I-C
EA 6.000 $5.000 $8.000 $10.000 $6.250 $10.000 $10.000 $8.900 $10.000 $11.000 $7.500 $8.000 $10.000
REFL PAV MRKR TY II-A-A
EA 29.000 $4.000 $8.000 $10.000 $6.250 $10.000 $10.000 $8.900 $10.000 $11.000 $7.500 $8.000 $10.000
PAV SURF PREP FOR MRK (6")
LF 4,024.000 $0.250 $0.250 $0.100 $0.160 $0.100 $0.100 $0.200 $0.500 $0.110 $0.300 $0.150 $0.100
PAV SURF PREP FOR MRK (8")
LF 185.000 $0.250 $0.250 $0.200 $0.210 $0.200 $0.200 $0.300 $0.500 $0.220 $0.500 $0.300 $0.200
PAV SURF PREP FOR MRK (24")
LF 69.000 $0.500 $0.500 $1.000 $0.260 $1.000 $1.000 $1.100 $1.500 $1.100 $1.000 $1.000 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 3.000 $12.500 $13.000 $20.000 $10.510 $20.000 $20.000 $13.400 $15.000 $22.000 $25.000 $12.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 1.000 $15.000 $13.000 $20.000 $10.510 $20.000 $20.000 $13.400 $15.000 $22.000 $25.000 $12.000 $20.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 2.000 $15.000 $2.000 $5.000 $1.050 $5.000 $5.000 $0.100 $0.500 $5.500 $25.000 $0.120 $25.000
INSTALL FTB
LF 73.000 $75.000 $80.000 $74.680 $68.290 $180.000 $40.000 $66.800 $120.000 $55.000 $75.000 $30.000 $140.000
REMOVE FTB
LF 73.000 $25.000 $20.000 $10.070 $17.860 $75.000 $10.000 $39.000 $20.000 $14.000 $25.000 $30.000 $23.500
REMOVE LEAD-CONTAINING COATING (OTHER)
LS 1.000 $40,000.000 $25,000.000 $24,480.000 $5,000.000 $40,000.000 $12,000.000 $11,140.000 $25,000.000 $27,000.000 $100,000.000 $25,000.000 $35,000.000
Totals: $3,375,346.250 $3,199,825.400 $3,607,643.008 $3,636,683.590 $3,701,646.480 $3,727,075.000 $3,807,901.270 $3,845,653.000 $3,853,055.290 $3,992,819.760 $4,065,252.710 $4,447,136.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,874.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $26,874.00