HIDALGO SH 495 (0865-01-118)

Items: 98

County: HIDALGO
Length: 0.0000 MILES (0.6342 MILES)
Highway: SH 495
District: PHARR
Control Number: 0865-01-118
DBE Goal: 0.0%
Project: STP 2026(949)VRU
Guaranty: $12,000.00
Time: 197 WORKING DAYS
Engineer's Estimate: $631,956.66
Date: 09/02/2026 1:00 PM CDT (17 days ago)
Contract Number: 9263020
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206505
Contract Type: FEDERAL
Project Description: INSTALL SIDEWALK
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$631,956.66
Over/Under Est: -7.68% -$48,518.82
$611,972.63
Over/Under Est: -3.16% -$19,984.03
Amt Left: 4.89% $28,534.79
$757,676.90
Over/Under Est: 19.89% $125,720.24
Amt Left: 29.86% $174,239.06
Delta: -23.81% -$145,704.27
Over/Under Est: 28.54% $180,352.67
Amt Left: 39.23% $228,871.49
Delta: -7.21% -$54,632.43

Bid Items & Bid Tabulations

98 Total 0 of 98
HIDALGO  |  SH 495  |  PHARR  |  0865-01-118  |  09/02/2026 1:00 PM CDT  |  $631,956.66  |  STP 2026(949)VRU  |  HAZARD ELIM & SAFETY  |  197 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
THE LEVY COMPANY, LLC
TRAF-TEX, INC.
CASTILLO ARANDA LLC
TEXAS CORDIA CONSTRUCTION, LLC
PREPARING ROW
STA 7.000 $2,700.000 $103.000 $3,246.000 $10,000.000 $3,000.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 20.000 $12.500 $61.000 $181.000 $20.000 $150.000
REMOV CONC (GND BOX W/ APRON)
EA 3.000 $1,000.000 $271.900 $95.000 $500.000 $3,000.000
EXCAV (ROADWAY)
CY 356.000 $20.000 $21.000 $22.700 $15.000 $35.000
EMBANK (FNL)(OC)(TY C)
CY 26.000 $40.000 $25.500 $33.100 $25.000 $150.000
FURN & PLACE TOPSOIL (4")
SY 1,508.000 $10.000 $4.550 $3.300 $8.000 $8.000
DRILL SEED (PERM_URBAN_CLAY)
SY 1,508.000 $1.000 $2.400 $2.800 $0.500 $1.000
VEGETATIVE WATERING
TGL 50.420 $20.000 $662.690 $70.000 $85.000 $50.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 30.000 $475.000 $434.640 $513.000 $350.000 $355.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 1.000 $1,800.000 $310.000 $471.000 $500.000 $6,500.000
ADJUSTING MANHOLES (WATER METER)
EA 1.000 $1,100.000 $310.000 $471.000 $500.000 $2,500.000
MOBILIZATION
LS 1.000 $48,742.420 $51,537.970 $43,415.000 $75,000.000 $80,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 13.000 $6,000.000 $2,250.000 $1,135.000 $5,500.000 $1,000.000
TMA (STATIONARY)
DAY 197.000 $215.000 $76.750 $168.000 $500.000 $50.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 377.000 $8.000 $7.250 $4.900 $5.000 $7.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 377.000 $2.000 $2.750 $1.500 $1.000 $3.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 96.000 $5.000 $7.500 $11.500 $6.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 96.000 $1.300 $2.750 $4.800 $1.000 $4.000
CONC CURB (TY II)
LF 152.000 $11.500 $25.500 $29.000 $12.000 $125.000
CONC SIDEWALKS (4")
SY 920.500 $80.000 $96.000 $106.000 $75.000 $155.000
CONC SIDEWALKS (6")
SY 258.000 $120.000 $101.000 $111.000 $80.000 $200.000
CURB RAMPS (TY 1)
EA 8.000 $3,000.000 $3,110.000 $3,461.000 $1,650.000 $6,000.000
CURB RAMPS (TY 7)
EA 4.000 $3,000.000 $3,110.000 $3,478.000 $1,600.000 $4,500.000
CONCRETE SIDEWALK (RETAINING WALL)
CY 15.000 $1,000.000 $355.000 $398.000 $750.000 $3,250.000
CONDT (PVC) (SCH 40) (2")
LF 210.000 $28.000 $21.800 $19.200 $25.000 $18.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 105.000 $28.000 $31.100 $35.700 $30.000 $33.000
CONDT (PVC) (SCH 40) (3")
LF 95.000 $32.000 $26.750 $29.400 $30.000 $26.000
CONDT (PVC) (SCH 40) (3") (BORE)
LF 105.000 $35.000 $35.500 $49.000 $35.000 $41.000
CONDT (PVC) (SCH 40) (4")
LF 90.000 $23.650 $37.500 $31.600 $40.000 $33.000
ELEC CONDR (NO.8) INSULATED
LF 760.000 $5.000 $2.300 $2.100 $10.000 $2.000
ELEC CONDR (NO.6) BARE
LF 700.000 $2.750 $2.600 $2.200 $12.000 $2.000
ELEC CONDR (NO.6) INSULATED
LF 160.000 $2.900 $3.250 $2.700 $15.000 $3.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 110.000 $2.900 $3.150 $4.100 $6.000 $3.000
GROUND BOX TY C (162911)W/APRON
EA 1.000 $1,750.000 $1,900.000 $1,180.000 $1,500.000 $1,478.000
GROUND BOX TY D (162922)W/APRON
EA 4.000 $2,000.000 $1,995.000 $1,201.000 $1,650.000 $2,069.000
ELC SRV TY T 120/240 000(NS)GS(L)TS(O)
EA 1.000 $3,500.000 $3,465.000 $7,033.000 $8,500.000 $3,370.000
ALUMINUM SIGNS (TY A)
SF 20.500 $26.750 $56.300 $73.760 $50.000 $57.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $800.000 $877.000 $893.000 $750.000 $2,414.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000 $950.000 $977.000 $929.000 $750.000 $3,245.000
RELOCATE SM RD SN SUP&AM TY S80
EA 4.000 $200.000 $852.000 $142.000 $400.000 $3,000.000
REMOVE SM RD SN SUP&AM
EA 2.000 $210.000 $251.000 $142.000 $200.000 $835.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 521.000 $0.990 $3.410 $3.350 $2.500 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 200.000 $7.980 $10.820 $13.350 $25.000 $24.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 150.000 $2.170 $6.410 $6.700 $10.000 $8.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 2,060.000 $0.720 $1.800 $3.350 $3.000 $3.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 3,620.000 $0.500 $1.800 $1.700 $3.000 $3.000
PAVEMENT SLER 6"
LF 16,698.000 $0.700 $0.450 $0.850 $1.000 $0.500
PAVEMENT SLER 8"
LF 521.000 $1.500 $1.000 $1.700 $1.000 $0.750
PAVEMENT SLER 12"
LF 466.000 $1.200 $2.000 $3.350 $2.000 $1.000
PAVEMENT SLER 24"
LF 506.000 $3.130 $3.000 $6.700 $3.000 $2.000
PAVEMENT SLER (ARROW)
EA 4.000 $25.000 $20.030 $88.900 $20.000 $15.000
PAVEMENT SLER (WORD)
EA 3.000 $25.000 $20.030 $133.300 $30.000 $25.000
PAVEMENT SLER (DBL ARROW)
EA 2.000 $42.000 $10.020 $177.800 $30.000 $25.000
PAVEMENT SLER (BIKE ARROW)
EA 4.000 $40.000 $10.020 $88.900 $20.000 $15.000
PAVEMENT SLER (BIKE SYMBOL)
EA 4.000 $40.000 $10.020 $88.900 $20.000 $15.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 1,020.000 $0.600 $0.850 $1.700 $3.000 $3.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 4,196.000 $0.600 $1.400 $1.700 $2.000 $2.000
REFL PAV MRK TY I (Y)6"(BRK)(100MIL)
LF 900.000 $0.550 $1.600 $1.700 $3.000 $3.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 4,902.000 $0.750 $1.400 $1.700 $2.000 $2.000
PREFAB PM TY C (W)(24")(SLD)
LF 306.000 $16.250 $12.820 $26.650 $25.000 $24.000
PREFAB PM TY C (W)(ARROW)
EA 6.000 $200.000 $280.440 $444.400 $200.000 $175.000
PREFAB PM TY C (W)(DBL ARROW)
EA 2.000 $300.000 $390.610 $888.800 $350.000 $300.000
PREFAB PM TY C (W)(WORD)
EA 5.000 $250.000 $280.430 $533.300 $300.000 $275.000
PREFAB PM TY C (W)(BIKE ARROW)
EA 4.000 $100.000 $160.250 $200.000 $200.000 $150.000
PREFAB PM TY C (W)(BIKE SYMBOL)
EA 4.000 $220.000 $210.330 $222.000 $100.000 $75.000
PREFAB PM TY C (Y)(12")(SLD)
LF 316.000 $7.550 $12.820 $13.350 $20.000 $18.000
REFL PAV MRKR TY I-C
EA 10.000 $5.000 $6.810 $6.700 $60.000 $50.000
REFL PAV MRKR TY II-A-A
EA 174.000 $5.000 $6.810 $6.700 $20.000 $15.000
ELIM EXT PM & MRKS (6")
LF 5,640.000 $0.700 $0.800 $2.220 $0.500 $0.250
ELIM EXT PM & MRKS (8")
LF 200.000 $1.200 $2.000 $3.350 $0.500 $0.500
ELIM EXT PM & MRKS (12")
LF 297.000 $1.300 $1.900 $4.450 $2.000 $2.000
ELIM EXT PM & MRKS (24")
LF 302.000 $3.100 $4.010 $8.900 $4.000 $3.000
ELIM EXT PM & MRKS (ARROW)
EA 4.000 $31.100 $80.130 $166.650 $100.000 $75.000
ELIM EXT PM & MRKS (DBL ARROW)
EA 3.000 $65.000 $100.160 $333.300 $100.000 $75.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $34.000 $80.120 $222.200 $100.000 $75.000
PAV SURF PREP FOR MRK (6")
LF 5,680.000 $0.150 $0.100 $0.450 $0.100 $0.010
PAV SURF PREP FOR MRK (8")
LF 200.000 $0.100 $0.200 $0.700 $0.100 $0.020
PAV SURF PREP FOR MRK (12")
LF 316.000 $0.550 $0.600 $1.350 $0.100 $0.030
PAV SURF PREP FOR MRK (24")
LF 306.000 $0.400 $1.000 $2.700 $0.100 $0.050
PAV SURF PREP FOR MRK (ARROW)
EA 2.000 $5.700 $5.010 $66.700 $2.000 $1.000
PAV SURF PREP FOR MRK (WORD)
EA 2.000 $5.950 $5.010 $88.900 $2.000 $1.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $33,000.000 $35,500.030 $32,900.000 $35,000.000 $38,428.000
INSTALL HWY TRF SIG (UPGRADE)
EA 1.000 $29,500.000 $2,707.840 $4,958.000 $15,000.000 $6,503.000
VEH SIG SEC (12")LED(GRN ARW)
EA 1.000 $300.000 $445.000 $349.000 $450.000 $426.000
VEH SIG SEC (12")LED(YEL)
EA 5.000 $300.000 $445.000 $286.000 $450.000 $426.000
VEH SIG SEC (12")LED(YEL ARW)
EA 1.000 $305.000 $445.000 $290.000 $450.000 $426.000
VEH SIG SEC (12")LED(RED)
EA 8.000 $300.000 $445.000 $283.000 $450.000 $426.000
VEH SIG SEC (12")LED(RED ARW)
EA 1.000 $305.000 $445.000 $290.000 $450.000 $426.000
PED SIG SEC (LED)(COUNTDOWN)
EA 8.000 $800.000 $954.000 $705.000 $1,500.000 $650.000
BACKPLATE W/REFL BRDR(4 SEC)
EA 1.000 $231.000 $237.000 $267.000 $2,500.000 $219.000
BACK PLATE (12")(3 SECT)
EA 4.000 $210.000 $254.000 $256.000 $200.000 $195.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 1,585.000 $1.950 $2.100 $2.300 $5.000 $2.000
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 1,765.000 $3.050 $3.550 $3.850 $5.000 $3.000
TRF SIG CBL (TY A)(14 AWG)(15 CONDR)
LF 280.000 $6.000 $6.300 $7.050 $5.000 $5.000
INS TRF SIG PL AM(S)1 ARM(32')LUM
EA 2.000 $15,000.000 $22,086.790 $15,356.000 $1,550.000 $22,708.000
PED POLE ASSEMBLY
EA 4.000 $2,750.000 $3,462.360 $3,935.000 $2,500.000 $2,660.000
PED DETECT PUSH BUTTON (APS)
EA 8.000 $1,100.000 $1,180.670 $973.000 $1,100.000 $1,035.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $4,000.000 $4,663.920 $4,117.000 $4,000.000 $3,843.000
Totals: $631,956.665 $583,437.840 $611,972.630 $757,676.900 $812,309.330
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $20,000.00