Show Job Controls
Bid Cobra

HIDALGO E CANTON RD (0921-02-525)

Items: 75

County: HIDALGO
Length: 0.0000 MILES (0.0045 MILES)
Highway: E CANTON RD
District: PHARR
Control Number: 0921-02-525
DBE Goal: 0.0%
Project: STP 2026(871)HES
Guaranty: $17,000.00
Time: 307 WORKING DAYS
Engineer's Estimate: $833,832.29
Date: 08/05/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263040
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00203563
Contract Type: FEDERAL
Project Description: ADDING LEFT & RIGHT TURN LANES AT FOLLOWING LOCATIONS (CANTON RD. & CHAVEZ RD., RAMSEYER RD.& DOOLITTLE RD., TEXMEX RD. & 83 RD., MILE 22 1/2 N RD. & CARMEN AVILA RD.)
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (4)
E
Engineer's Estimate
$833,832.29
$757,002.25
Over/Under Est: -9.21% -$76,830.04
$799,816.80
Over/Under Est: -4.08% -$34,015.49
Amt Left: 5.66% $42,814.55
Over/Under Est: 13.44% $112,040.21
Amt Left: 24.95% $188,870.25
Delta: -18.26% -$146,055.70
$1,183,472.25
Over/Under Est: 41.93% $349,639.96
Amt Left: 56.34% $426,470.00
Delta: -25.12% -$237,599.75

Bid Items & Bid Tabulations

75 Total 0 of 75
HIDALGO  |  E CANTON RD  |  PHARR  |  0921-02-525  |  08/05/2026 1:00 PM CDT  |  $833,832.29  |  STP 2026(871)HES  |  HAZARD ELIM & SAFETY  |  307 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUCANIA CONTRACTORS LLC
CASTILLO ARANDA LLC
TEXAS CORDIA CONSTRUCTION, LLC
EARTHWORKS ENTERPRISE
REMOV CONC (DRIVEWAYS)
SY 56.000 $45.000 $20.000 $20.000 $70.000 $48.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 91.000 $85.000 $30.000 $20.000 $40.000 $48.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 228.000 $25.000 $35.000 $20.000 $50.000 $52.000
RMV (14"-18") TRT/UNTRT BASE & ASPH PAV
SY 633.000 $25.000 $35.000 $20.000 $60.000 $59.000
EXCAV (ROADWAY)
CY 920.000 $37.000 $50.000 $16.000 $30.000 $64.000
SUBGR WIDEN (DC)
SY 2,909.000 $5.000 $6.000 $15.000 $10.000 $28.000
EMBANK (FNL)(DC)(TY C)
CY 244.000 $35.000 $80.000 $10.000 $15.000 $69.000
BROADCAST SEED (TEMP_WARM_COOL)
SY 6,570.000 $0.250 $1.000 $0.290 $2.000 $0.750
VEGETATIVE WATERING
TGL 6.800 $8.000 $50.000 $100.000 $200.000 $350.000
FL BS (CMP IN PLC)(TY E GR 4) (8")
SY 2,909.000 $45.000 $31.000 $32.000 $30.000 $55.000
TACK COAT
GAL 244.000 $2.500 $10.000 $10.000 $30.000 $10.000
PRIME COAT (MC-30)
GAL 486.000 $10.000 $10.000 $10.000 $30.000 $13.000
D-GR HMA TY-D PG64-22
TON 269.000 $175.000 $270.000 $300.000 $125.000 $380.000
RIPRAP (CONC)(4 IN)
CY 25.000 $800.000 $600.000 $550.000 $1,500.000 $580.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $2,000.000 $2,000.000 $3,500.000 $3,000.000 $2,900.000
SET (TY II) (24 IN) (CMP) (6: 1) (P)
EA 1.000 $2,000.000 $3,000.000 $3,750.000 $3,500.000 $3,500.000
ADJUSTING MANHOLES
EA 1.000 $2,500.000 $2,000.000 $1,200.000 $15,000.000 $3,900.000
REMOV STR (SET)
EA 1.000 $800.000 $500.000 $500.000 $2,200.000 $800.000
REMOV STR (PIPE)
LF 104.000 $30.000 $25.000 $30.000 $40.000 $39.000
MOBILIZATION
LS 1.000 $70,348.390 $71,000.000 $75,000.000 $62,000.000 $150,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $4,000.000 $2,000.000 $5,500.000 $500.000 $2,158.000
TMA (STATIONARY)
DAY 307.000 $200.000 $1.000 $200.000 $72.000 $300.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 468.000 $30.000 $20.000 $30.000 $50.000 $95.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $12.500 $4.000 $5.000 $30.000 $2.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,855.000 $3.100 $5.000 $5.000 $4.000 $5.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,855.000 $1.100 $2.000 $1.000 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 465.000 $5.000 $8.000 $10.000 $6.000 $9.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 465.000 $2.000 $2.000 $1.000 $2.000 $2.000
CONSTRUCTING DETOURS
SY 560.000 $80.000 $165.000 $55.000 $180.000 $120.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 48.000 $225.000 $15.000 $85.000 $441.000 $41.000
CONC CURB & GUTTER (TY II)
LF 989.000 $39.000 $35.000 $12.000 $51.000 $55.000
DRIVEWAYS (CONC) (TY 1)
SY 50.000 $175.000 $110.000 $75.000 $420.000 $133.000
DRIVEWAYS (ACP)
SY 155.000 $155.000 $80.000 $80.000 $165.000 $120.000
TURNOUTS (ACP)
SY 89.000 $125.000 $80.000 $80.000 $250.000 $120.000
CONC SIDEWALKS (6")
SY 30.000 $150.000 $120.000 $75.000 $450.000 $134.000
CURB RAMPS (TY 7)
EA 7.000 $3,200.000 $2,900.000 $1,350.000 $5,000.000 $2,800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $750.000 $990.000 $1,300.000 $2,500.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 8.000 $750.000 $1,140.000 $1,300.000 $2,200.000 $1,400.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $750.000 $1,260.000 $1,600.000 $3,000.000 $1,520.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 9.000 $500.000 $900.000 $1,300.000 $2,800.000 $1,080.000
REMOVE SM RD SN SUP&AM
EA 3.000 $200.000 $360.000 $300.000 $700.000 $440.000
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 91.000 $6.000 $5.750 $5.500 $8.000 $7.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 52.000 $15.000 $11.750 $30.000 $28.000 $15.000
WK ZN PAV MRK REMOV (Y)6"(BRK)
LF 101.000 $1.500 $1.500 $4.000 $3.000 $2.000
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 4,770.000 $1.500 $1.500 $2.000 $1.000 $2.000
WK ZN PAV MRK REMOV (Y)12"(SLD)
LF 48.000 $20.000 $4.750 $5.500 $6.000 $6.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 156.000 $2.000 $4.750 $6.000 $6.000 $6.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,090.000 $1.250 $2.750 $3.000 $2.000 $4.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 4,612.000 $2.000 $2.000 $2.000 $1.000 $3.000
PAVEMENT SLER 6"
LF 1,452.000 $0.750 $0.750 $2.000 $1.000 $1.000
PAVEMENT SLER 24"
LF 42.000 $1.500 $3.500 $12.000 $11.000 $5.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 2,944.000 $3.000 $1.000 $3.000 $2.000 $2.000
PREFAB PM TY C (W)(24")(SLD)
LF 496.000 $14.000 $17.000 $20.000 $19.000 $21.000
PREFAB PM TY C (W)(ARROW)
EA 11.000 $240.000 $288.000 $200.000 $194.000 $346.000
PREFAB PM TY C (W)(DBL ARROW)
EA 5.000 $325.000 $500.000 $400.000 $388.000 $605.000
PREFAB PM TY C (W)(WORD)
EA 11.000 $250.000 $288.000 $300.000 $277.000 $346.000
PREFAB PM TY C (Y)(12")(SLD)
LF 43.000 $8.000 $8.000 $40.000 $33.000 $10.000
REFL PAV MRKR TY I-C
EA 74.000 $5.000 $5.750 $20.000 $17.000 $7.000
REFL PAV MRKR TY II-A-A
EA 104.000 $7.000 $5.250 $20.000 $17.000 $7.000
PAV SURF PREP FOR MRK (6")
LF 7,556.000 $1.000 $0.150 $1.000 $0.250 $0.250
PAV SURF PREP FOR MRK (8")
LF 1,246.000 $1.000 $0.250 $1.000 $0.250 $0.500
PAV SURF PREP FOR MRK (12")
LF 43.000 $1.000 $1.200 $15.000 $11.000 $1.500
PAV SURF PREP FOR MRK (24")
LF 496.000 $2.750 $2.000 $5.000 $3.000 $2.500
PAV SURF PREP FOR MRK (ARROW)
EA 11.000 $40.000 $6.000 $100.000 $83.000 $8.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 5.000 $40.000 $6.000 $200.000 $139.000 $8.000
PAV SURF PREP FOR MRK (WORD)
EA 11.000 $40.000 $6.000 $80.000 $83.000 $8.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 1.000 $8,000.000 $7,500.000 $15,000.000 $2,061.000 $2,000.000
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
EA 1.000 $5,000.000 $10,000.000 $5,200.000 $2,290.000 $2,200.000
RELOCATE PED POLE ASSEMBLY
EA 1.000 $5,000.000 $1,000.000 $1,500.000 $1,680.000 $1,600.000
REPLACE OF PEDESTRIAN PUSH BUTTONS
EA 2.000 $175.000 $700.000 $2,500.000 $99.000 $94.000
LED ROADSIDE SIGN
EA 1.000 $5,500.000 $5,000.000 $5,000.000 $640.000 $38.000
1
RC PIPE (CL III)(18 IN)
LF 88.000 $200.000 $100.000 $0.000 $0.000 $0.000
1A
THERMOPLASTIC PIPE (PP) (18")
LF 88.000 $200.010 $0.000 $80.000 $180.000 $91.000
2
RC PIPE (CL III)(24 IN)
LF 94.000 $160.000 $105.000 $0.000 $0.000 $0.000
2A
THERMOPLASTIC PIPE (PP) (24")
LF 94.000 $160.010 $0.000 $110.000 $200.000 $116.000
Totals: $866,474.110 $757,002.250 $799,816.800 $945,872.500 $1,183,472.250
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $35,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $32,840.66
Total: $67,840.66