HIDALGO E CANTON RD (0921-02-527)

Items: 70

County: HIDALGO
Length: N/A
Highway: E CANTON RD
District: PHARR
Control Number: 0921-02-527
DBE Goal: 0.0%
Project: STP 2025(299)HESG
Guaranty: $12,000.00
Time: 187 WORKING DAYS
Engineer's Estimate: $621,188.51
Date: 10/07/2026 1:00 PM CDT (in 17 days)
Contract Number: 10263218
Type: HAZARD ELIMINATION & SAFETY
Project ID: A00206514
Contract Type: FEDERAL
Project Description: IMPROVE PEDESTRIAN SIGNALS, FLASHING OR LED-EMBEDDED STOP SIGNS, SAFETY LIGHTING AT INTERSECTION AT CANTON RD. & CESAR CHAVEZ.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Print Print Notice
Documents 2 files available

Bid Items & Bid Tabulations

70 Total 0 of 70
HIDALGO  |  E CANTON RD  |  PHARR  |  0921-02-527  |  10/07/2026 1:00 PM CDT  |  $621,188.51  |  STP 2025(299)HESG  |  HAZARD ELIM & SAFETY  |  187 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 17.420
REMOV CONC (RIPRAP)
SY 14.000
EXCAV (ROADWAY)
CY 998.000
EMBANK (FNL)(DC)(TY C)
CY 244.000
FURN & PLACE TOPSOIL (VEH)
CY 50.000
DRILL SEED (PERM_RURAL_SAND)
SY 3,097.000
VEGETATIVE WATERING
TGL 5.220
SPRINKLING (DUST CONTROL)
TGL 106.000
FL BS (RDWY DEL)(TY E GR 4)(FNL POS)
CY 566.000
LIME (COM OR QK)(SLURRY)
TON 32.000
LIME TRT (EXIST MATL)(12")
SY 2,280.000
CEMENT
TON 20.000
CEMENT TRT (NEW BASE)(10")
SY 2,222.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 6,024.000
PRIME COAT (MC-30)
GAL 1,489.000
ASPH (SPG 79-13)
GAL 2,484.000
AGGR (TY-PD, GR-4P)(SAC-B)
CY 67.000
D-GR HMA TY-D SAC-A PG76-22
TON 780.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 60.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 64.000
RIPRAP (CONC)(4 IN)
CY 8.000
RIPRAP (CONC) (CL B) (4 IN)
CY 2.800
RC PIPE (CL III)(18 IN)
LF 152.000
RC PIPE (CL III)(24 IN)
LF 2.000
INLET (COMPL)(PSL)(FG)(3FTX3FT-3FTX3FT)
EA 1.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 6.000
ADJUSTING INLETS (CAP)
EA 1.000
REMOV STR (PIPE)
LF 105.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000
TMA (STATIONARY)
DAY 250.000
TMA (MOBILE OPERATION)
DAY 18.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 156.000
CONSTRUCTION EXITS (REMOVE)
SY 156.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 412.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 412.000
CONC CURB & GUTTER (TY II)
LF 572.000
DRIVEWAYS (ACP)
SY 73.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 1.000
IN RD IL (TY SA) 40T-12 (250W EQ) LED
EA 8.000
CONDT (PVC) (SCH 40) (2")
LF 923.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 157.000
ELEC CONDR (NO.8) BARE
LF 1,141.000
ELEC CONDR (NO.8) INSULATED
LF 2,282.000
ELEC CONDR (NO.6) BARE
LF 24.000
ELEC CONDR (NO.6) INSULATED
LF 48.000
GROUND BOX TY A (122311)W/APRON
EA 4.000
ELC SRV TY A 240/480 060(NS)SS(T)TP(O)
EA 1.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 9.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 4.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000
RELOCATE SM RD SN SUP&AM TY S80
EA 2.000
REMOVE SM RD SN SUP&AM
EA 8.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 415.000
WK ZN PAV MRK SHT TERM (TAB)TY Y
EA 537.000
REFL PAV MRK TY I (W)6"(DOT)(100MIL)
LF 28.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 840.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 176.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 93.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 224.000
REFL PAV MRK TY I (W)6"(SLD)(100MIL)
LF 7,268.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 9,361.000
PRFB RUMBLE STRIP (BLK)(4')(TRANSVERSE)
LF 320.000
PREFAB PM TY C (W)(ARROW)
EA 8.000
PREFAB PM TY C (W)(DBL ARROW)
EA 4.000
PREFAB PM TY C (W)(WORD)
EA 8.000
REFL PAV MRKR TY I-C
EA 42.000
REFL PAV MRKR TY II-A-A
EA 300.000
ELIM EXT PM & MRKS (4")
LF 404.000
LED ROADSIDE SIGN
EA 4.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,500.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $18,900.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,500.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $11,350.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
Total: $47,250.00