Bid Cobra

KARNES FM 791 (1122-01-034)

Items: 99

County: KARNES
Length: N/A
Highway: FM 791
District: CORPUS CHRISTI
Control Number: 1122-01-034
DBE Goal: 0.0%
Project: C 1122-1-34
Guaranty: $100,000.00
Time: 432 WORKING DAYS
Engineer's Estimate: $18,280,355.16
Date: 10/06/2026 1:00 PM CDT (in 16 days)
Contract Number: 10263004
Type: REHABILITATE EXISTING ROADWAY
Project ID: A00195149
Project Description: REHABILITATE AND WIDEN EXISTING ROAD TO 32', ADD 4' SHOULDERS, MILLED RUMBLE STRIPS, REMOVE/SAFETY TREAT FIXED OBJECTS. NARROW BRIDGE REPLACEMENT, ADD SAFETY ILLUMINATION, UPGRADE HORIZONTAL AND VERTICAL ALIGNMENT TO ADD NEW ROADWAY DESIGN STANDARDS.
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Print Print Notice
Documents 2 files available

Bid Items & Bid Tabulations

99 Total 0 of 99
KARNES  |  FM 791  |  CORPUS CHRISTI  |  1122-01-034  |  10/06/2026 1:00 PM CDT  |  $18,280,355.16  |  C 1122-1-34  |  REHAB EXIST ROADWAY  |  432 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 620.800
OBLITERATING ABANDONED ROAD
STA 4.000
EXCAV (ROADWAY)
CY 78,972.000
EMBANK (FNL)(DC)(TY C)
CY 59,314.000
DRILL SEED (PERM_RURAL_CLAY)
SY 336,961.000
DRILL SEED (TEMP_WARM_COOL)
SY 168,480.000
VEGETATIVE WATERING
TGL 5,442.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 7,897.000
FL BS (CIP)(TY A GR 1-2 OR 5) FINAL POS
CY 35,551.000
CEMENT
TON 3,584.000
CEMENT TRT (EXIST MATL & NEW BASE)(10")
SY 250,547.000
CEMENT TRT (NEW BASE)(10")
SY 2,466.000
ASPH (RC-250)
GAL 50,576.000
ASPH(AC-15P, HFRS-2P OR CRS-2P)
GAL 104,802.000
AGGR (TY-B, GR-5)(SAC-B)
CY 1,874.000
AGGR (TY-PB, GR-4S OR 4)(SAC-B)
CY 2,305.000
D-GR HMA TY-B SAC-B PG64-22
TON 52,080.000
D-GR HMA TY-D SAC-B PG70-22
TON 25,617.000
TACK COAT
GAL 18,382.000
CUT & RESTORING PAV
SY 398.000
CEM STABIL BKFL
CY 555.000
TRENCH EXCAVATION PROTECTION
LF 232.000
RIPRAP (CONC)(4 IN)
CY 6.510
RIPRAP (MOW STRIP)(4 IN)
CY 13.900
RIPRAP (STONE PROTECTION)(12 IN)
CY 17.030
RAIL (TY T223)
LF 140.200
CONC BOX CULV (6 FT X 3 FT)
LF 46.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 72.000
CONC BOX CULV (6 FT X 3 FT)(EXTEND)
LF 99.000
CONC BOX CULV (6 FT X 6 FT)(EXTEND)
LF 48.000
RC PIPE (CL III)(18 IN)
LF 3,032.000
RC PIPE (CL III)(24 IN)
LF 444.000
RC PIPE (CL III)(30 IN)
LF 430.000
RC PIPE (CL III)(36 IN)
LF 151.000
RC PIPE (CL III)(42 IN)
LF 271.000
RC PIPE (CL III)(72 IN)
LF 58.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 1.000
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 3.000
HEADWALL (CH - PW - 0) (DIA= 72 IN)
EA 2.000
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000
WINGWALL (PW - 2) (HW=4 FT)
EA 2.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000
WINGWALL (PW - 2) (HW=6 FT)
EA 2.000
WINGWALL (PW - 2) (HW=7 FT)
EA 2.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(3:1)(C)
EA 2.000
SET (TY II) (18 IN) (RCP) (3: 1) (C)
EA 4.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 4.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 230.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 18.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 9.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 11.000
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 7.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 10.000
SET (TY II) (42 IN) (RCP) (3: 1) (C)
EA 12.000
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000
CLEAN EXIST CULVERTS
EA 3.000
REMOV STR (PIPE)
EA 82.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 408.000
TMA (MOBILE OPERATION)
DAY 55.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 870.000
ROCK FILTER DAMS (REMOVE)
LF 4,350.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 24,650.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 24,650.000
ROCK FILTER DAMS (INSTALL) (TY 2) 6:1
LF 3,480.000
CONC CURB (SPECIAL)
LF 573.000
INTERSECTIONS (ACP)
SY 1,144.000
DRIVEWAYS (CONC)
SY 198.000
DRIVEWAYS (ACP)
SY 7,434.000
TURNOUTS (ACP)
SY 324.000
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 125,260.000
MILL RUMBLE STRIPS (ASPH) (CENTERLINE)
LF 62,180.000
MTL THRIE-BEAM GD FEN (TIM POST)
LF 87.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 1,160.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
T-POST (REM/REPL)(METAL)
EA 8.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 22.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 92.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 5.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 96.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 2.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000
INSTL OM ASSM (OM-2Y)(WC)GNDLL(BI)
EA 60.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 8,900.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 335,000.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 11,428.000
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 126,600.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 8,900.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 85,700.000
PREFAB PM TY C (W)(24")(SLD)
LF 12.000
REFL PAV MRKR TY II-A-A
EA 1,515.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $40,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $60,000.00
Total: $100,000.00