Show Job Controls
Bid Cobra

LA SALLE BROWN RD (0922-20-030)

Items: 40

County: LA SALLE
Length: N/A
Highway: BROWN RD
District: LAREDO
Control Number: 0922-20-030
DBE Goal: 0.0%
Project: BR 2025(820)
Guaranty: $13,000.00
Time: 78 WORKING DAYS
Engineer's Estimate: $668,834.28
Date: 10/07/2026 1:00 PM CDT (in 17 days) Changed
Contract Number: 10263019
Type: BRIDGE REPLACEMENT
Project ID: A00209154
Contract Type: FEDERAL
Project Description: OFF-SYSTEM BRIDGE REPLACEMENT ON CHARLIE BROWN RD AT DRAW
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Print Print Notice

Bid Items & Bid Tabulations

40 Total 0 of 40
2 Changed
LA SALLE  |  BROWN RD  |  LAREDO  |  0922-20-030  |  10/07/2026 1:00 PM CDT  |  $668,834.28  |  BR 2025(820)  |  BRIDGE REPL  |  78 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 3.000
Qty Changed
EXCAV (ROADWAY)
CY 55.000
EXCAV (CHANNEL)
CY 39.000
Qty Changed
EMBANK (FNL)(DC)(TY A)
CY 241.000
BLADING
HR 8.000
DRILL SEED (PERM_RURAL_CLAY)
AC 0.250
DRILL SEED (TEMP_WARM)
AC 0.250
PROOF ROLLING
HR 16.000
FL BS (CMP IN PLC)(TY A GR 1-2)
TON 205.000
PRIME COAT (MC-30)
GAL 200.000
LRA PAV TY-II GR-CS
TON 96.000
CEM STABIL BKFL
CY 28.000
FLOWABLE BACKFILL
CY 25.000
DRILL SHAFT (24 IN)
LF 240.000
CL C CONC (ABUT)
CY 17.600
REINF CONC SLAB (SLAB BEAM)
SF 1,040.000
PRESTR CONC SLAB BEAM (5SB12)
LF 197.500
RIPRAP (MOW STRIP)(4 IN)
CY 30.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 48.000
RAIL (TY T631)
LF 104.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 120.000
ROCK FILTER DAMS (REMOVE)
LF 120.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 77.000
CONSTRUCTION EXITS (REMOVE)
SY 77.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 400.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 400.000
CONSTRUCTING DETOURS (TY1)
SY 945.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 160.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 160.000
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000
MTL W-BEAM GD FEN (TIM POST)
LF 100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 2.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 20.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $1,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $50,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $29,280.00
Total: $80,280.00