REMOVING CONC (PAV)
|
SY
|
65.000
|
$80.000
|
$50.000
|
$32.960
|
$110.000
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
1,201.000
|
$50.000
|
$25.000
|
$36.130
|
$50.000
|
|
|
REMOVING CONC (SIDEWALKS)
|
SY
|
230.000
|
$100.000
|
$30.000
|
$20.280
|
$50.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
412.000
|
$30.000
|
$20.000
|
$15.210
|
$25.000
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
118.000
|
$57.000
|
$75.000
|
$45.630
|
$110.000
|
|
|
REMOVING STAB BASE AND ASPH PAV (5")
|
SY
|
638.000
|
$25.000
|
$37.500
|
$20.360
|
$25.000
|
|
|
PROOF ROLLING
|
HR
|
20.000
|
$250.000
|
$150.000
|
$125.490
|
$279.000
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
301.000
|
$10.000
|
$25.000
|
$1.770
|
$75.000
|
|
|
PRIME COAT (AE-P)
|
GAL
|
91.000
|
$50.000
|
$50.000
|
$5.850
|
$110.000
|
|
|
CONC PVMT (JOINTED - CPCD) (8")
|
SY
|
85.000
|
$400.000
|
$135.000
|
$130.810
|
$400.000
|
|
|
CEM STABIL BKFL
|
CY
|
3.000
|
$1,000.000
|
$300.000
|
$278.860
|
$945.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
97.000
|
$30.000
|
$20.000
|
$10.140
|
$130.000
|
|
|
CL C CONC (CULV)
|
CY
|
921.000
|
$2,100.000
|
$2,000.000
|
$2,144.750
|
$2,550.000
|
|
|
BRIDGE SIDEWALK
|
SF
|
1,978.000
|
$26.000
|
$30.000
|
$123.700
|
$28.900
|
|
|
APPROACH SLAB
|
CY
|
190.000
|
$910.000
|
$1,200.000
|
$1,218.980
|
$1,250.000
|
|
|
RETAINING WALL (CAST - IN - PLACE)
|
SF
|
1,008.000
|
$50.000
|
$120.000
|
$188.300
|
$130.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
221.000
|
$1,000.000
|
$700.000
|
$649.170
|
$1,100.000
|
|
|
RAIL (TY C223)
|
LF
|
504.000
|
$170.000
|
$250.000
|
$211.180
|
$304.000
|
|
|
WINGWALL (FW - S) (HW=7 FT)
|
EA
|
4.000
|
$15,000.000
|
$30,000.000
|
$31,941.960
|
$21,800.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
1.000
|
$30,000.000
|
$35,000.000
|
$39,547.180
|
$33,700.000
|
|
|
WINGWALL (SW - 0) (HW=7 FT)
|
EA
|
3.000
|
$15,000.000
|
$30,000.000
|
$40,153.330
|
$21,000.000
|
|
|
WINGWALL (SW-0)(HW=6FT)(MOD)
|
EA
|
4.000
|
$15,000.000
|
$25,000.000
|
$40,647.480
|
$24,400.000
|
|
|
ADJUSTING MANHOLES (SANITARY)
|
EA
|
4.000
|
$2,750.000
|
$2,000.000
|
$2,332.270
|
$5,610.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
8.000
|
$3,000.000
|
$3,000.000
|
$2,332.270
|
$4,000.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
966.000
|
$100.000
|
$100.000
|
$52.960
|
$290.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
780.000
|
$50.000
|
$50.000
|
$38.140
|
$52.100
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$344,865.000
|
$350,000.000
|
$446,173.360
|
$493,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
9.000
|
$12,000.000
|
$2,500.000
|
$37,992.340
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
315.000
|
$100.000
|
$100.000
|
$73.520
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
315.000
|
$40.000
|
$10.000
|
$15.210
|
$22.500
|
|
|
CONC CURB (TY II)
|
LF
|
26.000
|
$100.000
|
$50.000
|
$44.840
|
$193.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
358.000
|
$80.000
|
$55.000
|
$55.010
|
$83.400
|
|
|
CURB RAMPS (TY 2)
|
EA
|
4.000
|
$4,500.000
|
$3,000.000
|
$2,535.080
|
$5,500.000
|
|
|
CURB RAMPS (TY 10)
|
EA
|
4.000
|
$4,500.000
|
$3,000.000
|
$2,585.780
|
$5,500.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
325.000
|
$40.000
|
$40.000
|
$51.380
|
$54.700
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$3,000.000
|
$2,500.000
|
$4,394.130
|
$3,960.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,800.000
|
$2,433.670
|
$2,850.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
3.000
|
$3,000.000
|
$4,000.000
|
$5,070.150
|
$4,560.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
2.000
|
$900.000
|
$1,000.000
|
$2,028.060
|
$1,710.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$300.000
|
$100.000
|
$169.010
|
$171.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
4.000
|
$100.000
|
$35.000
|
$67.600
|
$57.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
|
EA
|
11.000
|
$100.000
|
$35.000
|
$67.600
|
$57.000
|
|
|
WK ZN PAV MRK REMOV (TRAF BTN) TY W
|
LF
|
1,590.000
|
$1.500
|
$5.000
|
$3.160
|
$4.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
119.000
|
$10.000
|
$16.500
|
$8.920
|
$17.100
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
4.000
|
$250.000
|
$440.000
|
$212.950
|
$456.000
|
|
|
PAVEMENT SEALER 4"
|
LF
|
1,398.000
|
$0.500
|
$4.000
|
$0.410
|
$2.850
|
|
|
PAVEMENT SEALER 24"
|
LF
|
51.000
|
$2.000
|
$7.000
|
$2.030
|
$6.800
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
4.000
|
$100.000
|
$112.000
|
$50.700
|
$114.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
955.000
|
$2.000
|
$6.000
|
$0.740
|
$5.700
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
339.000
|
$0.700
|
$6.000
|
$0.700
|
$5.700
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
104.000
|
$2.000
|
$6.000
|
$1.070
|
$5.700
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
535.000
|
$4.000
|
$6.000
|
$0.760
|
$5.700
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
39.000
|
$10.000
|
$11.000
|
$4.060
|
$11.400
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
1,398.000
|
$0.500
|
$4.000
|
$0.230
|
$2.850
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
119.000
|
$2.000
|
$6.000
|
$1.520
|
$5.700
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
4.000
|
$100.000
|
$110.000
|
$30.420
|
$114.000
|
|
|
RELOCT RDSD FLSH BCN AM (SOLAR PWRD)
|
EA
|
4.000
|
$5,000.000
|
$5,000.000
|
$3,954.720
|
$6,840.000
|
|
|
D-GR HMA TY-C PG70-22
|
TON
|
54.000
|
$450.000
|
$225.000
|
$172.390
|
$834.000
|
|
|
D-GR HMA TY-D PG70-22
|
TON
|
38.000
|
$450.000
|
$200.000
|
$132.430
|
$980.000
|
|
|
TACK COAT
|
GAL
|
60.000
|
$20.000
|
$20.000
|
$4.520
|
$43.800
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
348.000
|
$200.000
|
$200.000
|
$101.400
|
$121.000
|
|
|
TMA (STATIONARY)
|
DAY
|
144.000
|
$400.000
|
$750.000
|
$338.010
|
$157.000
|
|
Totals: |
$3,857,967.300
|
$3,896,638.500
|
$4,572,987.290
|
$4,989,386.700
|