|
|
REMOVING CONC (RIPRAP)
|
SY
|
81.000
|
$50.000
|
$40.830
|
$200.000
|
$56.000
|
|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
1,914.000
|
$13.000
|
$8.600
|
$30.000
|
$30.000
|
|
|
REMOVING CONC (SIDEWALK OR RAMP)
|
SY
|
233.000
|
$25.000
|
$25.160
|
$30.000
|
$40.000
|
|
|
REMOVING STAB BASE & ASPH PAV (8"-10")
|
SY
|
1,788.000
|
$20.000
|
$13.130
|
$30.000
|
$25.750
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
469.000
|
$40.000
|
$97.110
|
$30.000
|
$70.000
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
1,569.000
|
$1.000
|
$2.830
|
$10.000
|
$15.000
|
|
|
PROOF ROLLING
|
HR
|
8.000
|
$500.000
|
$180.840
|
$150.000
|
$175.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 4)(7")
|
SY
|
4,676.000
|
$32.000
|
$27.990
|
$40.000
|
$50.930
|
|
|
REWORK BS MTL (TY D)(SURF)(ORD COMP)
|
SY
|
267.000
|
$10.000
|
$12.790
|
$50.000
|
$37.210
|
|
|
PRIME COAT (AE-P)
|
GAL
|
588.000
|
$22.000
|
$13.310
|
$10.000
|
$21.000
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
2,649.000
|
$20.000
|
$8.080
|
$40.000
|
$14.750
|
|
|
AGGR(TY-PB GR-4 SAC-A)
|
CY
|
65.000
|
$500.000
|
$648.660
|
$600.000
|
$475.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
|
SY
|
267.000
|
$300.000
|
$177.150
|
$60.000
|
$275.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
47.000
|
$650.000
|
$994.550
|
$650.000
|
$1,800.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
100.000
|
$200.000
|
$537.380
|
$125.000
|
$652.500
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
28.000
|
$300.000
|
$923.050
|
$250.000
|
$693.000
|
|
|
INLET (COMPL)(PCU)(5FT)(NONE)
|
EA
|
3.000
|
$15,000.000
|
$31,622.820
|
$15,000.000
|
$22,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$2,000.000
|
$7,280.550
|
$3,500.000
|
$5,253.730
|
|
|
REMOV STR (PIPE)
|
LF
|
30.000
|
$30.000
|
$242.690
|
$100.000
|
$112.500
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$130,000.000
|
$154,722.650
|
$165,000.000
|
$245,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$11,000.000
|
$34,970.970
|
$8,500.000
|
$50,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 4)
|
LF
|
65.000
|
$85.000
|
$128.990
|
$40.000
|
$500.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
65.000
|
$25.000
|
$49.670
|
$20.000
|
$250.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
520.000
|
$15.000
|
$14.180
|
$18.000
|
$20.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
520.000
|
$1.000
|
$9.010
|
$9.000
|
$16.500
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
130.000
|
$100.000
|
$28.260
|
$250.000
|
$375.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
1,652.000
|
$50.000
|
$43.940
|
$65.000
|
$112.500
|
|
|
CONC CURB & GUTTER (SLOTTED)
|
LF
|
60.000
|
$60.000
|
$81.350
|
$100.000
|
$112.500
|
|
|
CONC SIDEWALKS (4")
|
SY
|
22.000
|
$200.000
|
$426.460
|
$100.000
|
$210.000
|
|
|
CONC MEDIAN
|
SY
|
439.000
|
$205.000
|
$188.860
|
$250.000
|
$435.000
|
|
|
PIPE UNDERDRAINS (TY 8) (6")
|
LF
|
603.000
|
$40.000
|
$84.880
|
$100.000
|
$90.000
|
|
|
GROUND BOX TY C (162911)
|
EA
|
1.000
|
$5,000.000
|
$9,609.360
|
$2,000.000
|
$12,750.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
10.000
|
$600.000
|
$1,243.570
|
$1,500.000
|
$1,650.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,500.000
|
$1,413.140
|
$1,500.000
|
$1,875.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
5.000
|
$100.000
|
$190.390
|
$500.000
|
$1,000.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(WFLX)SRF
|
EA
|
16.000
|
$150.000
|
$90.440
|
$100.000
|
$120.000
|
|
|
WK ZN PAV MRK REMOV (Y)6"(SLD)
|
LF
|
1,950.000
|
$1.500
|
$3.390
|
$10.000
|
$11.810
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
800.000
|
$1.000
|
$4.520
|
$10.000
|
$6.000
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
294.000
|
$5.000
|
$7.910
|
$10.000
|
$10.500
|
|
REFL PAV MRK TY I (Y)8"(SLD)(100MIL)
|
LF
|
416.000
|
$1.000
|
$4.520
|
$10.000
|
$6.000
|
|
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
|
LF
|
287.000
|
$5.000
|
$7.910
|
$10.000
|
$10.500
|
|
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
|
EA
|
2.000
|
$300.000
|
$565.260
|
$500.000
|
$750.000
|
|
REFL PAV MRK TY II (W) 36" (YLD TRI)
|
EA
|
8.000
|
$100.000
|
$84.790
|
$500.000
|
$112.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
4.000
|
$50.000
|
$84.790
|
$500.000
|
$112.500
|
|
|
PAVEMENT SEALER (MED NOSE)
|
EA
|
2.000
|
$100.000
|
$169.580
|
$500.000
|
$225.000
|
|
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
|
LF
|
447.000
|
$1.000
|
$2.260
|
$10.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
936.000
|
$1.000
|
$2.260
|
$10.000
|
$3.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
2,538.000
|
$1.000
|
$2.260
|
$10.000
|
$3.000
|
|
PREFAB PAV MRK TY B (W)(24")(SLD)
|
LF
|
28.000
|
$30.000
|
$45.220
|
$20.000
|
$60.000
|
|
PREFAB PAV MRK TY B (W)(ARROW)
|
EA
|
4.000
|
$500.000
|
$1,356.620
|
$500.000
|
$1,800.000
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
23.000
|
$5.000
|
$22.610
|
$6.000
|
$30.000
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
2,063.000
|
$1.000
|
$2.260
|
$10.000
|
$3.000
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
488.000
|
$1.250
|
$4.520
|
$10.000
|
$6.000
|
|
|
ELIM EXT PAV MRK & MRKS (12")
|
LF
|
435.000
|
$2.500
|
$5.650
|
$10.000
|
$7.500
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
16.000
|
$5.000
|
$5.650
|
$10.000
|
$7.500
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
6.000
|
$90.000
|
$113.050
|
$250.000
|
$150.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
6.000
|
$100.000
|
$113.050
|
$250.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
4.000
|
$50.000
|
$113.050
|
$250.000
|
$150.000
|
|
|
PAV SURF PREP FOR MRK (MED NOSE)
|
EA
|
2.000
|
$50.000
|
$113.050
|
$250.000
|
$150.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
632.000
|
$415.000
|
$297.520
|
$300.000
|
$281.330
|
|
|
TOM-C SAC-A
|
TON
|
173.000
|
$510.000
|
$415.960
|
$300.000
|
$339.310
|
|
|
BONDING COURSE
|
GAL
|
246.000
|
$15.000
|
$9.990
|
$10.000
|
$41.730
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
6.000
|
$12,000.000
|
$16,757.200
|
$20,000.000
|
$34,200.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
2.000
|
$10,000.000
|
$8,972.300
|
$15,000.000
|
$19,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$500.000
|
$361.120
|
$250.000
|
$237.500
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
48.000
|
$100.000
|
$119.170
|
$85.000
|
$161.500
|
|
Totals: |
$1,452,101.500
|
$1,609,466.840
|
$1,724,118.000
|
$2,452,101.500
|