PREPARING ROW
|
AC
|
0.250
|
$40,000.000
|
$77,000.000
|
$92,000.000
|
$125,000.000
|
$100,000.000
|
|
|
PREP ROW (TREE)(LESS THAN 24" DIA)
|
EA
|
4.000
|
$1,000.000
|
$2,625.000
|
$1,840.000
|
$13,000.000
|
$3,000.000
|
|
|
PREP ROW (TREE)(GREATER THAN 24" DIA)
|
EA
|
1.000
|
$2,500.000
|
$4,200.000
|
$3,400.000
|
$15,000.000
|
$4,000.000
|
|
|
REMOVING STAB BASE & ASPH PAV (6" - 8")
|
SY
|
1,294.000
|
$36.000
|
$9.450
|
$25.600
|
$30.000
|
$20.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
949.000
|
$22.000
|
$26.250
|
$23.700
|
$50.000
|
$30.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
574.000
|
$100.000
|
$31.500
|
$30.900
|
$50.000
|
$30.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
2,982.000
|
$12.000
|
$7.350
|
$2.780
|
$5.000
|
$5.000
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
2,982.000
|
$1.500
|
$1.050
|
$1.070
|
$4.000
|
$4.000
|
|
|
VEGETATIVE WATERING
|
MG
|
25.100
|
$275.000
|
$240.000
|
$74.000
|
$1.000
|
$50.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY B)
|
SY
|
320.000
|
$5.000
|
$5.250
|
$2.190
|
$6.000
|
$6.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
255.000
|
$100.000
|
$126.000
|
$99.000
|
$175.000
|
$150.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
460.000
|
$12.000
|
$21.000
|
$16.500
|
$20.000
|
$30.000
|
|
|
CEM STABIL BKFL
|
CY
|
155.000
|
$330.000
|
$360.000
|
$510.000
|
$350.000
|
$500.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
144.000
|
$175.000
|
$130.000
|
$265.000
|
$150.000
|
$200.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
288.000
|
$340.000
|
$360.000
|
$523.000
|
$320.000
|
$400.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
273.000
|
$440.000
|
$480.000
|
$564.000
|
$350.000
|
$500.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
58.200
|
$2,500.000
|
$1,350.000
|
$2,880.000
|
$2,800.000
|
$3,000.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
22.800
|
$2,500.000
|
$1,655.000
|
$3,010.000
|
$2,800.000
|
$3,000.000
|
|
|
CL H CONC (CAP)(HPC)
|
CY
|
37.200
|
$2,500.000
|
$4,405.000
|
$2,940.000
|
$2,800.000
|
$4,500.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
6,800.000
|
$36.000
|
$39.500
|
$56.000
|
$48.000
|
$65.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
76.400
|
$1,200.000
|
$864.000
|
$1,700.000
|
$1,200.000
|
$2,000.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
842.420
|
$260.000
|
$312.450
|
$320.000
|
$425.000
|
$500.000
|
|
|
SILICONE RESIN PAINT FINISH
|
SF
|
605.000
|
$25.000
|
$16.600
|
$18.800
|
$20.000
|
$30.000
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
539.000
|
$280.000
|
$200.000
|
$343.000
|
$225.000
|
$250.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
14.000
|
$700.000
|
$1,217.000
|
$1,290.000
|
$800.000
|
$700.000
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
|
LF
|
400.000
|
$150.000
|
$167.000
|
$163.000
|
$180.000
|
$325.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
80.000
|
$290.000
|
$295.000
|
$431.000
|
$225.000
|
$300.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
1.000
|
$200,000.000
|
$270,000.000
|
$174,000.000
|
$320,000.000
|
$350,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
275.000
|
$7.000
|
$10.500
|
$11.300
|
$5.000
|
$10.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$218,000.000
|
$240,000.000
|
$304,000.000
|
$250,000.000
|
$370,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$10,000.000
|
$5,700.000
|
$6,600.000
|
$30,000.000
|
$3,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
80.000
|
$50.000
|
$58.800
|
$92.000
|
$1.000
|
$75.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
80.000
|
$30.000
|
$15.750
|
$23.400
|
$1.000
|
$20.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
156.000
|
$50.000
|
$24.400
|
$57.000
|
$1.000
|
$75.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
156.000
|
$13.000
|
$15.750
|
$13.800
|
$1.000
|
$20.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
600.000
|
$6.000
|
$8.250
|
$8.600
|
$1.000
|
$7.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
600.000
|
$2.000
|
$3.400
|
$2.040
|
$1.000
|
$3.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
891.000
|
$8.000
|
$6.600
|
$10.700
|
$1.000
|
$10.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
891.000
|
$5.000
|
$1.600
|
$3.060
|
$1.000
|
$3.000
|
|
|
DRIVEWAYS (BASE)
|
SY
|
283.000
|
$65.000
|
$31.500
|
$68.000
|
$60.000
|
$70.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
75.000
|
$40.000
|
$31.500
|
$38.900
|
$28.000
|
$35.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$2,500.000
|
$3,955.000
|
$3,270.000
|
$1,800.000
|
$2,500.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
271.000
|
$7.000
|
$3.150
|
$3.890
|
$2.000
|
$6.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
2.000
|
$4,100.000
|
$3,595.000
|
$4,440.000
|
$4,000.000
|
$4,800.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
4.000
|
$350.000
|
$315.000
|
$389.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL) (S) (TL3)
|
EA
|
2.000
|
$15,000.000
|
$8,925.000
|
$11,000.000
|
$10,000.000
|
$12,000.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
100.000
|
$25.000
|
$31.500
|
$38.900
|
$25.000
|
$25.000
|
|
|
GATE (SPECIAL)
|
EA
|
5.000
|
$2,500.000
|
$3,675.000
|
$4,530.000
|
$4,400.000
|
$3,000.000
|
|
|
WIRE FENCE (TY A) (MOD)
|
LF
|
172.000
|
$60.000
|
$42.000
|
$52.000
|
$30.000
|
$2,500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,250.000
|
$1,575.000
|
$1,940.000
|
$2,000.000
|
$2,000.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$150.000
|
$6.300
|
$262.000
|
$50.000
|
$500.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
6.000
|
$50.000
|
$21.000
|
$80.000
|
$50.000
|
$75.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
7.000
|
$90.000
|
$79.000
|
$78.000
|
$50.000
|
$75.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
62.000
|
$3.000
|
$7.000
|
$2.140
|
$5.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
62.000
|
$3.000
|
$7.000
|
$2.230
|
$5.000
|
$5.000
|
|
|
PAVEMENT SEALER 6"
|
LF
|
880.000
|
$1.500
|
$2.400
|
$0.440
|
$5.000
|
$3.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
1,240.000
|
$1.000
|
$2.000
|
$1.070
|
$8.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
397.000
|
$1.000
|
$2.000
|
$1.070
|
$15.000
|
$5.000
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
843.000
|
$1.000
|
$2.000
|
$1.060
|
$10.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
18.000
|
$17.500
|
$4.500
|
$8.500
|
$25.000
|
$25.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
880.000
|
$0.500
|
$2.100
|
$0.080
|
$5.000
|
$3.000
|
|
|
SP MIXES SP-B SAC-B PG70-22
|
TON
|
379.000
|
$180.000
|
$262.500
|
$119.000
|
$300.000
|
$400.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
126.000
|
$180.000
|
$315.000
|
$139.000
|
$300.000
|
$500.000
|
|
|
TACK COAT
|
GAL
|
153.000
|
$10.000
|
$15.750
|
$3.090
|
$8.000
|
$30.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$16,500.000
|
$10,000.000
|
$13,300.000
|
$18,000.000
|
$25,000.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
60.000
|
$275.000
|
$150.000
|
$112.000
|
$50.000
|
$120.000
|
|
Totals: |
$2,392,520.700
|
$2,414,951.879
|
$2,785,968.230
|
$2,999,591.600
|
$3,898,272.000
|