Show Job Controls
Bid Cobra

TARRANT VARIOUS (0902-00-336)

Items: 67

County: TARRANT
Length: 0.0000 MILES
Highway: VARIOUS
District: FORT WORTH
Control Number: 0902-00-336
DBE Goal: 0.0%
Project: F 2026(984)
Guaranty: $53,000.00
Time: 192 WORKING DAYS
Engineer's Estimate: $2,655,169.00
Date: 08/05/2026 1:00 PM CDT (6 weeks ago)
Contract Number: 8263028
Type: BICYCLE AND PEDESTRIAN IMPROVEMENTS
Project ID: A00189667
Contract Type: FEDERAL
Project Description: ADA REMEDIATION AND NEW CONSTRUCTION
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Documents 2 files available
Bidders (7)
E
Engineer's Estimate
$2,655,169.00
$2,193,007.88
Over/Under Est: -17.41% -$462,161.12
$2,358,485.29
Over/Under Est: -11.17% -$296,683.71
Amt Left: 7.55% $165,477.41
$2,534,690.50
Over/Under Est: -4.54% -$120,478.50
Amt Left: 15.58% $341,682.62
Delta: -7.47% -$176,205.21
Over/Under Est: -3.11% -$82,708.25
Amt Left: 17.3% $379,452.87
Delta: -1.49% -$37,770.25
$2,614,940.60
Over/Under Est: -1.52% -$40,228.40
Amt Left: 19.24% $421,932.72
Delta: -1.65% -$42,479.85
Over/Under Est: 15.99% $424,513.19
Amt Left: 40.43% $886,674.31
Delta: -17.77% -$464,741.59
Over/Under Est: 16% $424,831.00
Amt Left: 40.45% $886,992.12
Delta: -0.01% -$317.81

Bid Items & Bid Tabulations

67 Total 0 of 67
TARRANT  |  VARIOUS  |  FORT WORTH  |  0902-00-336  |  08/05/2026 1:00 PM CDT  |  $2,655,169.00  |  F 2026(984)  |  BICYCLE AND PEDESTRIAN IMPRVS  |  192 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RATLIFF HARDSCAPE, LTD.
TI-ZACK CONCRETE, LLC
CASTILLO ARANDA LLC
GARRET SHIELDS INFRASTRUCTURE
STX CIVIL
TEXAS STEEL INDUSTRIAL PLACING, LLC
ED BELL CONSTRUCTION COMPANY
PREP ROW (TREE PRUNE AND TRIM)
STA 6.000 $5,000.000 $661.250 $495.000 $35,000.000 $5,000.000 $8,000.000 $3,500.000 $100.000
REMOV CONC (DRIVEWAYS)
SY 5,604.000 $19.800 $20.700 $30.760 $20.000 $25.000 $20.000 $30.000 $23.500
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 334.000 $35.200 $20.700 $28.670 $20.000 $30.000 $20.000 $50.000 $53.500
REMOV CONC (CURB OR CURB & GUTTER)
LF 82.000 $15.000 $17.250 $11.680 $5.000 $20.000 $10.000 $25.000 $26.000
REMOV CONC (MISC)
SY 1.000 $100.000 $25.870 $95.760 $50.000 $100.000 $10.000 $1,000.000 $750.000
RMV (0"-6") TRT/UNTRT BASE & ASPH PAV
SY 559.000 $7.700 $28.750 $34.260 $20.000 $40.000 $20.000 $20.000 $23.500
EXCAV (SPECIAL)
CY 15.000 $165.000 $59.410 $63.840 $50.000 $100.000 $80.000 $75.000 $145.000
EMBANK (FNL)(OC)(TY B)
CY 15.000 $165.000 $161.000 $63.840 $60.000 $40.000 $60.000 $75.000 $365.000
FURN & PLACE TOPSOIL (4")
SY 1,654.000 $8.800 $8.050 $5.790 $20.000 $5.000 $7.000 $6.000 $5.250
BLOCK SODDING
SY 1,654.000 $10.450 $5.520 $6.600 $8.000 $10.000 $10.000 $8.000 $5.000
VEGETATIVE WATERING
TGL 59.700 $100.000 $254.270 $1.100 $120.000 $25.000 $75.000 $192.000 $178.550
IRRIGATION SYSTEM
LS 1.000 $5,000.000 $34,237.800 $30,800.000 $55,500.000 $50,000.000 $50,000.000 $20,000.000 $10,000.000
RDSIDE AMENITY (WHEEL STOP REMOV&RESET)
EA 10.000 $100.000 $230.000 $275.000 $300.000 $150.000 $100.000 $150.000 $475.000
TACK COAT
GAL 40.000 $5.500 $57.500 $5.500 $15.000 $60.000 $20.000 $25.000 $39.000
D-GR HMA TY-C SAC-A PG70-22 (EXEMPT)
TON 20.000 $275.000 $1,092.500 $353.100 $275.000 $300.000 $400.000 $1,600.000 $390.000
PLANE & TEXT ASPH CONC PAV(0" TO 2")
SY 500.000 $2.200 $40.250 $13.200 $20.000 $50.000 $10.000 $30.000 $23.100
CUT & RESTORE ASPH PAVING
SY 857.000 $165.000 $109.250 $115.500 $120.000 $150.000 $90.000 $250.000 $250.000
CL A CONC (MISC)
CY 10.000 $1,000.000 $747.500 $736.490 $850.000 $600.000 $850.000 $1,100.000 $2,125.000
RIPRAP (CONC)(4 IN)
CY 79.000 $1,100.000 $212.090 $736.490 $600.000 $600.000 $600.000 $648.000 $1,025.000
RAIL (HANDRAIL)(TY F)
LF 197.000 $198.000 $214.030 $196.900 $260.000 $150.000 $195.000 $214.800 $195.940
GRATE & FRAME
EA 24.000 $1,175.900 $3,622.500 $1,964.870 $850.000 $2,500.000 $4,000.000 $1,600.000 $3,350.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 34.000 $825.000 $1,725.000 $281.650 $500.000 $1,000.000 $1,000.000 $1,500.000 $1,075.000
MOBILIZATION
LS 1.000 $232,950.790 $67,654.500 $199,436.180 $200,000.000 $200,000.000 $200,000.000 $308,000.000 $259,835.240
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $11,000.000 $4,663.250 $4,950.000 $10,500.000 $5,000.000 $10,000.000 $5,000.000 $11,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $6,600.000 $17,077.500 $1.100 $25,500.000 $5,000.000 $5,000.000 $8,500.000 $7,500.000
TMA (MOBILE OPERATION)
DAY 192.000 $100.000 $1,092.500 $1.100 $500.000 $300.000 $100.000 $325.000 $250.000
SANDBAGS FOR EROSION CONTROL
EA 62.000 $7.700 $10.350 $0.110 $20.000 $1.000 $10.000 $10.800 $10.500
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,500.000 $2.200 $4.650 $0.110 $6.000 $5.000 $4.000 $4.260 $3.150
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,500.000 $1.100 $1.720 $0.110 $1.000 $1.000 $2.000 $1.200 $1.580
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,700.000 $5.500 $6.950 $0.110 $15.000 $5.000 $15.000 $6.900 $4.460
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,700.000 $1.100 $1.770 $0.110 $1.000 $1.000 $1.000 $1.500 $2.360
COLORED TEXTURED CONC (4")
SY 26.000 $93.500 $147.090 $121.550 $135.000 $120.000 $600.000 $300.000 $395.000
CONC CURB (TY II)
LF 360.000 $77.000 $25.870 $55.480 $7.000 $40.000 $32.000 $33.600 $41.000
CONC CURB & GUTTER (TY II)
LF 154.000 $165.000 $40.250 $55.480 $15.000 $40.000 $45.000 $48.000 $92.000
CONCRETE GUTTER (MODIFIED)
LF 8.000 $165.000 $34.500 $66.330 $30.000 $40.000 $80.000 $168.000 $315.000
CONC CURB (TY C1)
LF 54.000 $75.000 $224.250 $91.530 $15.000 $20.000 $125.000 $60.000 $465.000
DRIVEWAYS (CONC)
SY 6,163.000 $115.500 $75.710 $115.060 $80.000 $90.000 $110.000 $125.000 $160.000
CONC SIDEWALKS (4")
SY 5,150.000 $93.500 $53.580 $89.780 $85.000 $85.000 $90.000 $95.000 $85.000
CONC SIDEWALKS (5")
SY 500.000 $126.500 $59.350 $112.550 $85.000 $90.000 $100.000 $100.000 $90.000
CONC SIDEWALK (STEPS)
SY 1.000 $150.000 $1,092.500 $185.100 $200.000 $500.000 $800.000 $1,200.000 $2,750.000
CURB RAMPS (TY 1)
SY 203.000 $181.500 $154.080 $119.700 $125.000 $300.000 $185.000 $150.000 $175.000
CURB RAMPS (TY 2)
SY 204.000 $150.000 $172.620 $119.700 $125.000 $300.000 $185.000 $282.000 $175.000
CURB RAMPS (TY 3)
SY 179.000 $165.000 $196.600 $119.700 $125.000 $300.000 $185.000 $264.000 $175.000
CURB RAMPS (TY 5)
SY 53.000 $165.000 $151.880 $119.700 $125.000 $300.000 $185.000 $141.600 $175.000
CURB RAMPS (TY 6)
SY 158.000 $181.500 $123.730 $119.700 $125.000 $300.000 $185.000 $152.400 $175.000
CURB RAMPS (TY 7)
SY 125.000 $181.500 $187.220 $119.700 $125.000 $300.000 $185.000 $266.400 $175.000
CURB RAMPS (TY 10)
SY 42.000 $181.500 $151.960 $119.700 $125.000 $300.000 $200.000 $273.600 $175.000
CURB RAMPS (TY 22)
SY 42.000 $181.500 $279.280 $119.700 $125.000 $300.000 $200.000 $217.320 $175.000
CONC DIRECTIONAL ISLAND
SY 35.000 $247.500 $328.420 $119.700 $80.000 $120.000 $190.000 $408.000 $195.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $396.000 $460.000 $368.500 $350.000 $500.000 $1,200.000 $402.000 $351.750
CONDT (PVC) (SCH 40) (2")
LF 185.000 $25.300 $29.900 $28.600 $40.000 $35.000 $32.000 $18.630 $27.300
ELEC CONDR (NO.8) BARE
LF 185.000 $2.200 $2.300 $2.200 $4.000 $50.000 $5.000 $2.630 $2.100
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 8.000 $1,100.000 $1,492.830 $768.900 $850.000 $1,000.000 $1,300.000 $838.800 $850.500
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 29.000 $839.300 $1,481.460 $768.900 $500.000 $500.000 $800.000 $838.800 $420.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 2,903.000 $9.900 $7.630 $7.580 $6.000 $7.000 $7.250 $9.590 $10.760
PAVEMENT SLER 24"
LF 2,903.000 $3.300 $0.460 $0.440 $2.000 $0.500 $3.250 $0.600 $2.630
ELIM EXT PM & MRKS (4")
LF 161.000 $5.000 $1.150 $1.100 $2.000 $1.250 $1.000 $1.500 $2.100
ELIM EXT PM & MRKS (8")
LF 100.000 $5.000 $1.150 $1.100 $2.000 $1.250 $2.000 $1.500 $2.100
ELIM EXT PM & MRKS (12")
LF 1,868.000 $5.000 $1.950 $1.870 $2.000 $2.000 $3.000 $2.550 $2.100
ELIM EXT PM & MRKS (24")
LF 802.000 $6.000 $1.950 $2.480 $3.000 $2.500 $6.000 $3.380 $0.210
PAV SURF PREP FOR MRK (24")
LF 2,903.000 $2.200 $0.450 $0.430 $0.500 $0.500 $1.200 $0.590 $0.790
INSTALL HWY TRF SIG (UPGRADE)
EA 5.000 $5,000.000 $9,200.000 $8,800.000 $3,500.000 $4,000.000 $9,500.000 $20,610.000 $8,400.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 1,461.000 $3.410 $2.990 $2.860 $5.000 $10.000 $3.000 $3.500 $2.730
PED POLE ASSEMBLY
EA 5.000 $3,850.000 $3,220.000 $3,080.000 $6,500.000 $7,500.000 $1,200.000 $5,058.750 $2,940.000
PED DETECT PUSH BUTTON (STANDARD)
EA 36.000 $660.000 $948.750 $907.500 $650.000 $700.000 $1,000.000 $566.250 $866.250
REPLACE OF GROUND BOXES
EA 17.000 $1,500.000 $1,610.000 $1,540.000 $1,500.000 $4,000.000 $3,500.000 $2,708.750 $1,470.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 35.000 $500.000 $46.000 $44.000 $200.000 $150.000 $50.000 $583.750 $42.000
Totals: $2,655,169.000 $2,193,007.879 $2,358,485.290 $2,534,690.500 $2,572,460.750 $2,614,940.600 $3,079,682.190 $3,079,999.995
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
Total: $25,000.00