TERRELL US 90 (0022-01-034)

Items: 76

County: TERRELL
Length: 0.3120 MILES (0.2009 MILES)
Highway: US 90
District: ODESSA
Control Number: 0022-01-034
DBE Goal: 0.0%
Project: BR 2025(538)
Guaranty: $100,000.00
Time: 407 WORKING DAYS
Engineer's Estimate: $7,285,905.67
Date: 10/07/2026 1:00 PM CDT (in 17 days)
Contract Number: 10263208
Type: BRIDGE REPLACEMENT
Project ID: A00191892
Contract Type: FEDERAL
Project Description: BRIDGE REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
TERRELL US 90 (0022-01-034)
Project Name: N/A
Project: BR 2025(538)
Engineer's Estimate: $7,285,905.67
Length: 0.3120 MILES (0.2009 MILES)
Project Class: BRIDGE REPLACEMENT
Limits From: SANDERSON CANYON AND UNION PACIFIC RR
Limits To: .
Project Description: BRIDGE REPLACEMENT
Actions:
Notice Questions HCS Excel Print Print Notice
Documents 2 files available

Bid Items & Bid Tabulations

76 Total 0 of 76
TERRELL  |  US 90  |  ODESSA  |  0022-01-034  |  10/07/2026 1:00 PM CDT  |  $7,285,905.67  |  BR 2025(538)  |  BRIDGE REPL  |  407 WORKING DAYS
Item Code
Description
Unit
Quantity
REMOV CONC (RIPRAP)
SY 1,013.000
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
SY 8,131.000
EXCAV (ROADWAY)
CY 306.000
EMBANK (FNL)(DC)(TY C)
CY 14,165.000
BLADING
HR 60.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 6,535.000
PROOF ROLLING
HR 60.000
FL BS (CMP IN PLC)(TY A GR 4) (8")
SY 10,052.000
ASPH (AC-20-5TR OR AC-20XP)
GAL 6,304.000
AGGR (TY-PB, GR-4)(SAC-A)
CY 168.000
TOM-C PG76-22 SAC-A
TON 427.000
CEM STABIL BKFL
CY 276.000
TEMPORARY SPL SHORING
SF 1,421.000
DRILL SHAFT (18 IN)
LF 86.000
DRILL SHAFT (36 IN)
LF 96.000
DRILL SHAFT (42 IN)
LF 310.000
DRILL SHAFT (48 IN)
LF 244.000
CL C CONC (ABUT)(HPC)
CY 86.700
CL C CONC (CAP)(HPC)
CY 147.800
CL C CONC (COLUMN)
CY 154.200
REINF CONC SLAB (HPC)
SF 28,661.000
APPROACH SLAB (HPC)
CY 124.600
PRESTR CONC GIRDER (TX28)
LF 326.660
PRESTR CONC GIRDER (TX62)
LF 3,694.620
RIPRAP (CONC)(4 IN)
CY 291.000
RIPRAP (CONC) (CL B) (4 IN)
CY 93.000
RIPRAP (MOW STRIP)(4 IN)
CY 58.000
RAIL (TY SSTR)(HPC)
LF 1,330.000
RAIL (CLF-RO)
LF 300.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 220.000
GABION MATTRESSES (GALV)(12 IN)
SY 2,400.000
GABIONS (3' X 3')(GALV)
CY 130.000
GABION (1.5' X 3')(GALV)
CY 20.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000
REMOV STR (APPROACH SLAB)
EA 2.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 26.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 440.000
TMA (MOBILE OPERATION)
DAY 16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 4,596.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 4,596.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 10.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 2,280.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,280.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 2,280.000
MTL W-BEAM GD FEN (STEEL POST)
LF 900.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000
REMOVE METAL BEAM GUARD FENCE
LF 1,100.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
GUARDRAIL END TREATMENT (REMOVE)
EA 3.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 2.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 5.000
REMOVE SM RD SN SUP&AM
EA 3.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 13.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 13,680.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 24.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 7,200.000
RE PROFILE PM TY I(W)6"(SLD)(100MIL)
LF 6,840.000
RE PROFILE PM TY I(Y)6"(SLD)(100MIL)
LF 5,805.000
RE PROFILE PM TY I(Y)6"(BRK)(100MIL)
LF 195.000
PAVEMENT SLER 6"
LF 2,296.000
PREFAB PM TY B (W)(6")(SLD)
LF 1,246.000
PREFAB PM TY B (Y)(6")(SLD)
LF 643.000
PREFAB PM TY B (Y)(6")(BRK)CONTRAST
LF 154.000
REFL PAV MRKR TY II-A-A
EA 85.000
ELIM EXT PM & MRKS (4")
LF 6,216.000
ELIM EXT PM & MRKS (24")
LF 24.000
PAV SURF PREP FOR MRK (6")
LF 2,296.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
ENVIRONMENTAL: CONTRACTOR FORCE ACCOUNT WORK (PART) $20,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $25,000.00
Total: $60,000.00