|
|
PREPARING ROW
|
STA
|
16.000
|
$3,000.000
|
$1,500.000
|
$677.980
|
$5,000.000
|
$1,600.000
|
$5,300.000
|
$1,820.000
|
$4,100.000
|
$15,000.000
|
|
|
PREP ROW (TREE PRUNING)
|
EA
|
10.000
|
$400.000
|
$1,000.000
|
$169.500
|
$10.000
|
$1,000.000
|
$3,000.000
|
$1,122.000
|
$3,600.000
|
$500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
820.000
|
$32.000
|
$50.000
|
$34.650
|
$18.000
|
$58.000
|
$32.000
|
$44.500
|
$43.000
|
$25.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
483.000
|
$20.000
|
$40.000
|
$72.880
|
$23.000
|
$50.000
|
$40.000
|
$86.600
|
$60.000
|
$55.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
3,972.000
|
$1.990
|
$2.050
|
$4.530
|
$8.000
|
$4.000
|
$7.000
|
$12.800
|
$6.000
|
$3.710
|
|
|
BROADCAST SEED (PERM) (RURAL) (CLAY)
|
SY
|
3,972.000
|
$0.500
|
$0.750
|
$0.680
|
$1.250
|
$0.750
|
$0.750
|
$1.000
|
$0.750
|
$3.000
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
1,986.000
|
$0.500
|
$0.750
|
$0.680
|
$1.250
|
$0.750
|
$0.750
|
$1.000
|
$0.750
|
$3.000
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
1,986.000
|
$0.500
|
$0.750
|
$0.680
|
$1.250
|
$0.750
|
$0.750
|
$1.000
|
$0.750
|
$3.000
|
|
|
VEGETATIVE WATERING
|
MG
|
39.700
|
$28.000
|
$200.000
|
$52.030
|
$1.000
|
$100.000
|
$30.000
|
$30.000
|
$250.000
|
$100.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
390.000
|
$4.000
|
$1.250
|
$10.850
|
$3.000
|
$1.250
|
$1.250
|
$1.650
|
$1.200
|
$5.890
|
|
|
PROOF ROLLING
|
HR
|
2.000
|
$200.000
|
$85.000
|
$225.850
|
$1.000
|
$200.000
|
$150.000
|
$250.000
|
$900.000
|
$100.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
1,443.000
|
$35.000
|
$30.000
|
$47.290
|
$39.000
|
$60.000
|
$46.000
|
$38.200
|
$60.000
|
$200.000
|
|
|
PRIME COAT (MC-30 OR EC-30)
|
GAL
|
289.000
|
$12.000
|
$20.000
|
$7.870
|
$7.000
|
$12.000
|
$22.000
|
$14.000
|
$4.000
|
$55.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
8,427.000
|
$6.000
|
$2.000
|
$2.060
|
$2.000
|
$3.600
|
$5.000
|
$10.000
|
$4.000
|
$9.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
484.000
|
$60.000
|
$25.000
|
$44.410
|
$1.000
|
$40.000
|
$113.000
|
$57.500
|
$360.000
|
$100.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
24.000
|
$320.000
|
$275.000
|
$239.200
|
$300.000
|
$177.000
|
$180.000
|
$780.000
|
$220.000
|
$770.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
2.000
|
$2,700.000
|
$1,000.000
|
$551.360
|
$550.000
|
$2,500.000
|
$2,000.000
|
$1,000.000
|
$2,100.000
|
$1,925.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
15.300
|
$650.000
|
$1,100.000
|
$740.810
|
$800.000
|
$950.000
|
$900.000
|
$900.000
|
$1,250.000
|
$829.000
|
|
|
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
|
LF
|
1.120
|
$4,000.000
|
$20,000.000
|
$1,185.300
|
$1,000.000
|
$1,000.000
|
$4,100.000
|
$13,040.000
|
$64,000.000
|
$7,269.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
24.000
|
$80.000
|
$130.000
|
$66.350
|
$136.000
|
$80.000
|
$140.000
|
$146.800
|
$170.000
|
$244.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
226.500
|
$140.000
|
$150.000
|
$99.190
|
$175.000
|
$200.000
|
$145.000
|
$154.150
|
$167.000
|
$121.000
|
|
|
WINGWALL (PW - 1) (HW=11 FT)
|
EA
|
1.000
|
$50,000.000
|
$50,000.000
|
$54,079.290
|
$57,980.740
|
$62,000.000
|
$51,000.000
|
$56,305.000
|
$96,300.000
|
$39,345.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,250.000
|
$2,200.000
|
$1,139.320
|
$1,900.000
|
$1,500.000
|
$2,200.000
|
$3,650.000
|
$4,900.000
|
$2,500.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
6.000
|
$2,000.000
|
$2,600.000
|
$1,593.220
|
$2,050.000
|
$2,500.000
|
$2,300.000
|
$4,700.000
|
$5,300.000
|
$2,500.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
1.000
|
$3,000.000
|
$6,000.000
|
$3,389.890
|
$3,200.000
|
$2,000.000
|
$1,000.000
|
$13,250.000
|
$6,800.000
|
$3,500.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,200.000
|
$700.000
|
$1,125.880
|
$680.000
|
$750.000
|
$1,000.000
|
$1,280.000
|
$1,100.000
|
$1,500.000
|
|
|
REMOV STR (MANHOLE)
|
EA
|
1.000
|
$1,100.000
|
$700.000
|
$1,125.880
|
$680.000
|
$750.000
|
$1,000.000
|
$1,590.000
|
$1,100.000
|
$2,500.000
|
|
|
REMOV STR (SET)
|
EA
|
10.000
|
$600.000
|
$300.000
|
$429.390
|
$680.000
|
$700.000
|
$400.000
|
$1,150.000
|
$1,100.000
|
$400.000
|
|
|
REMOV STR (PIPE)
|
LF
|
293.000
|
$30.000
|
$60.000
|
$30.630
|
$23.000
|
$40.000
|
$30.000
|
$38.750
|
$30.000
|
$55.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$101,720.190
|
$106,000.000
|
$143,000.000
|
$75,000.000
|
$90,000.000
|
$100,000.000
|
$132,270.000
|
$121,000.000
|
$180,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
7.000
|
$10,000.000
|
$4,900.000
|
$2,986.600
|
$1,600.000
|
$4,000.000
|
$10,000.000
|
$4,390.000
|
$8,800.000
|
$3,500.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
20.000
|
$40.000
|
$45.000
|
$162.720
|
$150.000
|
$45.000
|
$45.000
|
$59.600
|
$45.000
|
$100.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
20.000
|
$13.000
|
$15.000
|
$54.240
|
$17.000
|
$15.000
|
$15.000
|
$19.850
|
$15.000
|
$50.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
500.000
|
$5.000
|
$4.500
|
$6.780
|
$5.500
|
$4.500
|
$5.000
|
$6.000
|
$4.500
|
$5.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
500.000
|
$2.000
|
$1.000
|
$1.360
|
$2.200
|
$1.000
|
$1.000
|
$1.300
|
$1.000
|
$3.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
300.000
|
$80.000
|
$75.000
|
$29.490
|
$92.000
|
$120.000
|
$40.000
|
$116.000
|
$60.000
|
$123.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
300.000
|
$15.000
|
$35.000
|
$29.490
|
$36.000
|
$48.000
|
$40.000
|
$41.650
|
$58.000
|
$70.000
|
|
|
CONC CURB (RIBBON)
|
LF
|
148.000
|
$37.000
|
$50.000
|
$45.000
|
$24.000
|
$125.000
|
$75.000
|
$62.500
|
$74.000
|
$35.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
130.000
|
$200.000
|
$115.000
|
$101.490
|
$85.500
|
$200.000
|
$170.000
|
$119.250
|
$242.000
|
$85.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
508.000
|
$90.000
|
$100.000
|
$80.760
|
$157.000
|
$60.000
|
$100.000
|
$64.500
|
$199.000
|
$75.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
2,700.000
|
$1.500
|
$0.500
|
$1.380
|
$3.500
|
$0.500
|
$1.800
|
$1.900
|
$3.000
|
$3.000
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
1,070.000
|
$1.500
|
$2.500
|
$3.480
|
$3.500
|
$1.200
|
$3.400
|
$2.700
|
$6.000
|
$3.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
175.000
|
$48.000
|
$27.000
|
$35.930
|
$35.000
|
$28.000
|
$27.000
|
$37.100
|
$28.000
|
$45.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,000.000
|
$1,505.000
|
$2,040.720
|
$1,900.000
|
$1,532.000
|
$1,600.000
|
$2,030.000
|
$1,532.000
|
$1,700.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
75.000
|
$4.000
|
$3.000
|
$4.070
|
$3.750
|
$3.000
|
$3.000
|
$4.000
|
$3.000
|
$40.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,500.000
|
$3,200.000
|
$4,291.610
|
$4,100.000
|
$3,309.000
|
$3,300.000
|
$4,380.000
|
$3,309.000
|
$3,000.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$380.000
|
$200.000
|
$271.190
|
$400.000
|
$350.000
|
$200.000
|
$463.500
|
$350.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (DES SOURCE)
|
EA
|
2.000
|
$2,000.000
|
$5,350.000
|
$7,254.380
|
$3,500.000
|
$3,500.000
|
$4,000.000
|
$9,720.000
|
$5,500.000
|
$3,500.000
|
|
|
CRASH CUSH ATTEN (STKPL)
|
EA
|
2.000
|
$1,000.000
|
$1,500.000
|
$2,033.940
|
$1,800.000
|
$3,500.000
|
$2,000.000
|
$1,050.000
|
$3,100.000
|
$1,500.000
|
|
|
MAILBOX INSTALL-S (WC-POST) TY 3
|
EA
|
1.000
|
$300.000
|
$350.000
|
$474.580
|
$500.000
|
$750.000
|
$350.000
|
$500.000
|
$380.330
|
$2,500.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
3.000
|
$5,000.000
|
$5,500.000
|
$7,251.190
|
$6,800.000
|
$5,350.000
|
$5,500.000
|
$6,720.000
|
$5,347.650
|
$486.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
125.000
|
$12.000
|
$12.000
|
$17.570
|
$15.000
|
$13.000
|
$13.000
|
$25.000
|
$12.960
|
$24.400
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
170.000
|
$26.000
|
$27.000
|
$19.510
|
$33.000
|
$14.500
|
$15.000
|
$40.000
|
$14.390
|
$38.530
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
885.000
|
$1.800
|
$1.850
|
$1.710
|
$2.200
|
$1.260
|
$1.300
|
$2.250
|
$1.260
|
$2.180
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
4.000
|
$1,300.000
|
$1,040.000
|
$1,583.340
|
$1,250.000
|
$1,170.000
|
$1,200.000
|
$1,500.000
|
$1,167.690
|
$1,457.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$8,000.000
|
$7,200.000
|
$7,848.800
|
$8,000.000
|
$5,790.000
|
$6,000.000
|
$9,730.000
|
$5,788.380
|
$9,700.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
18.000
|
$34.000
|
$50.000
|
$28.480
|
$55.000
|
$21.000
|
$22.000
|
$100.000
|
$56.000
|
$29.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
9.000
|
$700.000
|
$465.000
|
$630.520
|
$600.000
|
$520.000
|
$470.000
|
$864.000
|
$519.250
|
$830.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
3.000
|
$900.000
|
$585.000
|
$793.240
|
$650.000
|
$624.000
|
$590.000
|
$1,032.000
|
$624.000
|
$930.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
1.000
|
$1,000.000
|
$850.000
|
$1,152.560
|
$1,000.000
|
$905.000
|
$860.000
|
$1,244.000
|
$905.000
|
$1,213.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U-EXAL)
|
EA
|
2.000
|
$800.000
|
$1,200.000
|
$1,627.150
|
$1,000.000
|
$940.000
|
$1,250.000
|
$1,593.000
|
$939.330
|
$1,375.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
13.000
|
$100.000
|
$100.000
|
$135.600
|
$100.000
|
$85.000
|
$140.000
|
$132.500
|
$85.000
|
$147.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
12.000
|
$290.000
|
$350.000
|
$338.990
|
$300.000
|
$250.000
|
$200.000
|
$331.000
|
$250.000
|
$263.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
3.000
|
$45.000
|
$35.000
|
$47.460
|
$30.000
|
$25.000
|
$36.000
|
$33.100
|
$49.680
|
$32.110
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)SRF)SRF
|
EA
|
1.000
|
$110.000
|
$255.000
|
$345.770
|
$140.000
|
$120.000
|
$260.000
|
$160.000
|
$120.000
|
$134.840
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
120.000
|
$2.000
|
$2.000
|
$0.640
|
$3.750
|
$1.000
|
$1.600
|
$1.900
|
$5.000
|
$5.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
476.000
|
$2.000
|
$2.000
|
$0.620
|
$3.750
|
$1.000
|
$1.600
|
$1.400
|
$5.000
|
$5.000
|
|
REFL PAV MRK TY I (W)8"(DOT)(090MIL)
|
LF
|
99.000
|
$3.000
|
$1.800
|
$1.490
|
$3.750
|
$3.000
|
$1.900
|
$3.300
|
$3.000
|
$1.410
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
1,014.000
|
$3.000
|
$1.800
|
$1.220
|
$1.800
|
$1.500
|
$1.900
|
$2.650
|
$1.500
|
$1.160
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
12.000
|
$16.000
|
$7.000
|
$17.630
|
$16.000
|
$13.000
|
$7.000
|
$13.250
|
$13.000
|
$16.700
|
|
REFL PAV MRK TY I (Y)24"(SLD)(090MIL)
|
LF
|
466.000
|
$10.000
|
$7.000
|
$9.150
|
$8.500
|
$7.000
|
$7.000
|
$10.600
|
$7.000
|
$8.690
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
3,064.000
|
$2.000
|
$0.750
|
$1.220
|
$1.500
|
$1.200
|
$0.720
|
$1.250
|
$1.200
|
$1.160
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
4,758.000
|
$2.000
|
$0.750
|
$1.220
|
$1.500
|
$1.200
|
$0.720
|
$1.250
|
$1.200
|
$1.160
|
|
PREFAB PAV MRK TY C (W) (ARROW)
|
EA
|
6.000
|
$300.000
|
$250.000
|
$298.310
|
$300.000
|
$270.000
|
$260.000
|
$375.000
|
$270.000
|
$282.000
|
|
PREFAB PAV MRK TY C (W) (WORD)
|
EA
|
6.000
|
$340.000
|
$280.000
|
$406.790
|
$400.000
|
$375.000
|
$280.000
|
$500.000
|
$375.000
|
$385.000
|
|
REFL PAV MRKR TY I-C
|
EA
|
54.000
|
$9.000
|
$7.000
|
$5.260
|
$7.490
|
$6.000
|
$6.600
|
$8.000
|
$6.000
|
$5.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
250.000
|
$10.000
|
$7.000
|
$5.260
|
$7.490
|
$6.000
|
$6.600
|
$8.000
|
$6.000
|
$5.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,800.000
|
$3,600.000
|
$5,747.420
|
$4,000.000
|
$4,240.000
|
$4,400.000
|
$7,770.000
|
$4,238.640
|
$7,700.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
4.000
|
$300.000
|
$270.000
|
$305.680
|
$300.000
|
$226.000
|
$230.000
|
$503.000
|
$225.430
|
$488.000
|
|
|
BACK PLATE (12")(1 SEC)ALUM
|
EA
|
4.000
|
$300.000
|
$100.000
|
$75.510
|
$110.000
|
$56.000
|
$60.000
|
$228.000
|
$55.690
|
$300.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$8,900.000
|
$6,000.000
|
$7,906.390
|
$6,000.000
|
$5,831.000
|
$6,000.000
|
$11,040.000
|
$5,830.850
|
$10,915.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
544.000
|
$140.000
|
$155.000
|
$169.720
|
$180.000
|
$163.000
|
$160.000
|
$170.000
|
$183.000
|
$300.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
1,068.000
|
$155.000
|
$145.000
|
$166.170
|
$190.000
|
$151.000
|
$165.000
|
$180.000
|
$199.000
|
$250.000
|
|
|
BONDING COURSE
|
GAL
|
970.000
|
$10.000
|
$3.000
|
$5.430
|
$6.250
|
$6.000
|
$5.000
|
$7.200
|
$8.000
|
$25.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
1,583.000
|
$10.000
|
$7.000
|
$4.980
|
$2.300
|
$7.500
|
$5.960
|
$4.850
|
$9.500
|
$3.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
3.000
|
$12,000.000
|
$4,000.000
|
$6,870.190
|
$8,000.000
|
$15,000.000
|
$9,000.000
|
$12,900.000
|
$13,000.000
|
$15,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
45.000
|
$290.000
|
$600.000
|
$242.690
|
$216.000
|
$185.000
|
$425.000
|
$240.000
|
$150.000
|
$500.000
|
|
|
TMA (MOBILE OPERATION)
|
HR
|
20.000
|
$90.000
|
$100.000
|
$40.450
|
$1.000
|
$185.000
|
$85.000
|
$505.000
|
$15.000
|
$200.000
|
|
Totals: |
$1,118,922.070
|
$1,036,981.250
|
$1,057,150.505
|
$1,093,000.000
|
$1,131,821.700
|
$1,234,027.720
|
$1,375,683.125
|
$1,688,255.990
|
$1,928,411.560
|