WALKER FM 2821 (2850-01-020)

Items: 86

County: WALKER
Length: N/A
Highway: FM 2821
District: BRYAN
Control Number: 2850-01-020
DBE Goal: 0.0%
Project: F 2026(061)
Guaranty: $41,000.00
Time: 81 WORKING DAYS
Engineer's Estimate: $1,767,958.90
Date: 10/06/2026 1:00 PM CDT (in 16 days)
Contract Number: 10263013
Type: CONSTRUCT TWLTL
Project ID: A00217669
Contract Type: FEDERAL
Project Description: CONSTRUCT TWLTL
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Print Print Notice
Documents 2 files available

Bid Items & Bid Tabulations

86 Total 0 of 86
9 Added
3 Removed
12 Changed
WALKER  |  FM 2821  |  BRYAN  |  2850-01-020  |  10/06/2026 1:00 PM CDT  |  $1,767,958.90  |  F 2026(061)  |  CONSTRUCT TWLTL  |  81 WORKING DAYS
Item Code
Description
Unit
Quantity
PREPARING ROW
STA 8.000
Added
REMOV CONC (MOWSTRIP)
SY 381.000
Added
REMOV CONC (RIPRAP)
SY 25.000
REMOV CONC (DRIVEWAYS)
SY 1,274.000
RMV (4"-8") TRT/UNTRT BASE & ASPH PAV
SY 587.000
EXCAV (ROADWAY)
CY 3,846.000
EMBANK (FNL)(DC)(TY C)
CY 12,500.000
FURN & PLACE TOPSOIL (4")
SY 5,183.000
BROADCAST SEED (PERM_RURAL_SAND)
SY 5,183.000
BROADCAST SEED (TEMP_WARM)
SY 2,592.000
BROADCAST SEED (TEMP_COOL)
SY 2,592.000
VEGETATIVE WATERING
TGL 156.000
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 6,483.000
CEMENT
TON 99.000
CEMENT TRT (SUBGRADE)(10")
SY 7,921.000
PRIME COAT (MC-30)
GAL 1,297.000
SP MIXES SP-B PG64-22
TON 1,783.000
SP MIXES SP-C SAC-A PG70-22
TON 3,422.000
TACK COAT
GAL 4,407.000
PLANE ASPH CONC PAV(2")
SY 26,060.000
PLANE ASPH CONC PAV(5")
SY 586.000
Qty Changed
CUT & RESTORING PAV
SY 98.000
Qty Changed
CEM STABIL BKFL
CY 4.000
Qty Changed
TRENCH EXCAVATION PROTECTION
LF 106.000
Added
RIPRAP (CONC)(5 IN)
CY 4.000
Qty Changed
RIPRAP (MOW STRIP)(4 IN)
CY 43.000
Added
CONC BOX CULV (3 FT X 2 FT)
LF 116.000
RC PIPE (CL III)(18 IN)
LF 153.000
RC PIPE (CL III)(24 IN)
LF 409.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1)(C)
EA 1.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 6.000
SET (TY II) (24 IN) (RCP) (3: 1) (C)
EA 1.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 1.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 10.000
CLEAN EXIST CULVERTS
EA 3.000
Added
REMOV STR (MANHOLE)
EA 1.000
REMOV STR (SET)
EA 16.000
Qty Changed
REMOV STR (PIPE)
EA 13.000
MOBILIZATION
LS 1.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000
TMA (STATIONARY)
DAY 81.000
TMA (MOBILE OPERATION)
DAY 4.000
Qty Changed
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 540.000
Qty Changed
ROCK FILTER DAMS (REMOVE)
LF 540.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,930.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,930.000
DRIVEWAYS (CONC)
SY 1,115.000
DRIVEWAYS (ACP)
SY 528.000
Qty Changed
MILL RUMBLE STRIPS (ASPHALT) (SHLDR)
LF 6,344.000
Qty Changed
MTL W-BEAM GD FEN (TIM POST)
LF 700.000
REMOVE METAL BEAM GUARD FENCE
LF 700.000
Added
REMOVE TERMINAL ANCHOR SECTION
EA 2.000
Added
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000
Added
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 2.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 5.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000
Added
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000
REMOVE SM RD SN SUP&AM
EA 7.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 8.000
REMOVE DELIN & OBJECT MARKER ASSMS
EA 8.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 8,263.000
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 8,263.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 412.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 206.000
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
LF 585.000
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
LF 76.000
REFL PAV MRK TY I (W)6"(BRK)(090MIL)
LF 8,408.000
Qty Changed
REFL PAV MRK TY I (W)6"(SLD)(090MIL)
LF 7,965.000
REFL PAV MRK TY I (Y)6"(BRK)(090MIL)
LF 7,947.000
REFL PAV MRK TY I (Y)6"(SLD)(090MIL)
LF 7,947.000
PREFAB PM TY C (W)(ARROW)
EA 4.000
PREFAB PM TY C (W)(WORD)
EA 2.000
REFL PAV MRKR TY II-A-A
EA 199.000
ELIM EXT PM & MRKS (6")
LF 374.000
ELIM EXT PM & MRKS (8")
LF 155.000
Qty Changed
ELIM EXT PM & MRKS (24")
LF 76.000
ELIM EXT PM & MRKS (ARROW)
EA 1.000
ELIM EXT PM & MRKS (WORD)
EA 1.000
Removed CONC BOX CULV (4 FT X 4 FT) LF 116.000
Removed REMOV STR (PIPE) LF 115.000
Removed ELIM EXT PM & MRKS (RUMBLE STRIP) LF 51.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $10,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $88,000.00
Total: $103,000.00